PURCHASING SECTION 6645 – 148th Street, Surrey, BC V3S 3C7 Tel: 604-590-7274 Fax: 604-599-0956 E-mail: purchasing@surrey.ca ADDENDUM #2 REQUEST FOR QUOTATIONS (RFQ) No.: TITLE: ADDENDUM ISSUE DATE: CLOSING DATE: #1220-40-22-10 OFFICE FURNISHINGS, INSTALLATION SUPPLY, DELIVERY AND MAY 06, 2010 prefer to receive Quotations on or before Monday, May 17, 2010 Information for Contractors The following information is provided to advise potential Contractors of a revised closing date. This Addendum #2 contains _________ ( ) pages. Q.1: .......regarding Main floor furniture specifications by room number: - #137 – 14 shelving units (dark grey) dimensions: 48”W x 18”D x 87”H - Number of shelves (including base) is not shown? - What type of shelves? - Are canopy tops required? - Are side panels required? - Are these individual bays or if they are arranged in ranges then room dimensions and layout is required to quote - As this is an R.C.M.P. building is certification of the installation according to both Provincial and Federal Seismic Building codes required? A.1: Delete this item from this Request For Quotations. This item will be obtained through a separate RFQ process. Q.2: Please let me know if we can get the electronic version of the floor plans. If you’re able to please email them to me or my design dept – bc.design@cexp.ca A.2: Refer to Schedule A-2 of the Request For Quotations Document. Q.3: In the past some of the RCMP projects were restricted to NMSO master standing offer products. Please confirm if we’re okay in quoting our alternate product lines. Brochures, samples, pictures etc. will be supplied with the RFP. A.3: This is not a Request For Proposals (RFP) this is a Request For Quotations (RFQ). Product or service specifications herein are intended solely to clearly describe type and quality and not to be restrictive. Trade reference specifications describe the type of product thus far found to best meet the City’s functional requirements and provide the most economical use life under agency use situations. So as not to misrepresent the requirements herein, BRAND NAMES other that those specified will therefore be considered on the basis of whether at least equal in quality and performance. By submitting a Quotation, the Contractor expressly warrants product quoted as at least equal in quality and performance. The City’s acceptance of a product quoted as an “equal” is conditioned on the City’s inspection and testing. Any Quotation containing a brand that is not of equal quality, performance or use specified should be represented as an “alternate” and not as an “equal”; failure to do so may be sufficient reason to consider the Quotation as nonresponsive. The City will be the sole judge as whether a product is “equal” in quality, and performance. The City will we accept more than One (1) quote from each Contractor. product lines that would meet our needs but would price differently). END OF ADDENDUM All Addenda will become part of the Contract Documents. (e.g. Two (2)