PART C – TENDER SUBMISSION DOCUMENTS PART C Tender Submission Documents District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 1 of 31 PART C – FORM OF TENDER City of Surrey (the “Owner”) Contract: District Energy System Phase 1: DPS, ETS and CBP Service Connections Reference No.: 1220-020-2014-003 TO OWNER: 1. WE, THE UNDERSIGNED: 1.1 have received and carefully reviewed all of the Tender Documents, including without limitation the Instructions to Tenderers, the Form of Tender, the Contract Documents, the Specifications and Drawings, City of Surrey’s Supplementary General Conditions, and the following Addenda: (Addenda, if any) 2. 3. 1.2 have full knowledge of the Place of the Work, and the Work required; and 1.3 have complied with the Instructions to Tenderers; and ACCORDINGLY WE HEREBY OFFER: 2.1 to perform and complete all the Work and to provide all the labour, equipment and material all as set out in the Tender Documents, in strict compliance with the Tender Documents; and 2.2 to achieve Substantial Performance of the Work ____________________________ days from the Commencement Date. (work duration or date) 2.3 to do the Work for the price, which is the sum of the products of the actual quantities incorporated into the Work and the appropriate unit prices listed in Appendix 1, Schedule of Prices, plus any lump sums or specific prices and adjustment amounts as provided by the Contract Documents. For the purposes Tender comparison, our offer is to perform and complete the Work for the “Tender Price” in the sum of: ________________________________________________________________ ______________________________________ Dollars ($_________________) as set out on Appendix 1 of this Form of Tender. Our Tender Price is based on the estimated quantities listed in the Schedule of Prices, and includes GST. within WE CONFIRM: 3.1 that we understand and agree that the quantities as listed in the Schedule of Prices are estimated, and that the actual quantities may vary. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 2 of 31 PART C – FORM OF TENDER 4. WE CONFIRM: 4.1 that the following Appendices are attached to and form a part of this tender: 4.1.1 Appendix 1 – Schedule of Prices Appendix 2 – Preliminary Construction Schedule Appendix 3 – Tenderer’s Proposed Key Project Personnel Appenidx 4 – Comparable Work Experience Appendix 5 – Subcontractors Appendix 6 – Tenderer’s Construction Equipment (*Please note, Schedules 1 through 3 (Incl.) of Part C – FORM OF TENDER are included for information purposes only and are not to be included with your Tender submission.) 5. 4.1.2 the Bid Security as required by paragraph _____ of the Instructions to Tenderers; and 4.1.3 the Undertaking of Surety – Performance, and Labour and Materials Payment filled and signed. WE AGREE: 5.1 that in consideration of $1, other good and valuable consideration paid by the Owner (the receipt of sufficiency of which is hereby acknowledged) we agree that this tender will be irrevocable and open for acceptance by the Owner for a period of 60 calendar days from the day following the Tender Closing Date and Tender Closing Time, even if the tender of another tenderer is accepted by the Owner. If within this period the Owner delivers a written notice (“Notice of Award”) by which the Owner accepts our tender, we will: 5.1.1 within 15 Working Days of receipt of the written Notice of Award deliver to the Owner: (a) a performance bond and a labour and material payment bond, each in the amount of 50% of the Contract Price, issued by a surety licensed to carry on the business of suretyship in the Province of British Columbia, and in a form acceptable to the Owner; (b) a detailed Construction Schedule consistent with the preliminary construction schedule included in this Tender, which indicates the timing of the major activities of the Work and provides sufficient detail of the critical events and their inter-relationship to demonstrate the Work will be performed by the completion date stated in this Tender; (c) a detailed traffic management plan addressing vehicular and pedestrian movement, safety and access with specific detailing on methods, building and maintenance of temporary structures, signage and materials used to maintain the Place of the Work operations and access to staff and public users of the Place of the Work site; District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 3 of 31 PART C – FORM OF TENDER (d) a detailed Place of the Work site - specific safety and health plan addressing as a high-level overview the health and safety issues including, but not limited to hazards, mitigation measures, site orientations, safety meetings, first aid attendant requirements, and training requirements and record keeping; (e) a “clearance letter” indicating that the Tenderer is in WCB compliance; (f) a copy of the Certificate of Insurance as specified in GC 11.1 indicating that all such insurance coverage is in place; (g) a valid City of Surrey Business License; and (h) copy the Owner on the “Notice of Project” as and when required under section 20.2 of the Occupational Health & Safety Regulation (BC Regulation 296/97). 6. 5.1.2 within 2 Days of receipt of written Notice to Proceed, or such longer time as may be otherwise specified in the Notice to Proceed, commence the Work; and 5.1.3 sign the Contract Documents. WE AGREE: 6.1 that, if we receive written Notice of Award of this Contract and, contrary to paragraph 5 of this Form of Tender, we: 6.1.1 fail or refuse to deliver the documents as specified by paragraph 5.1.1 of this Form of Tender; or 6.1.2 fail or refuse to commence the Work as required by the Notice to Proceed, then such failure or refusal will be deemed to be a refusal by us to enter into the Contract and the Owner may, on written notice to us, award the Contract to another party. We further agree that, as full compensation on account of damages suffered by the Owner because of such failure or refusal, the Bid Security shall be forfeited to the Owner, in an amount equal to the lesser of: 6.1.3 the face value of the Bid Security; and 6.1.4 the amount by which our Tender Price is less than the amount for which the Owner contracts with another party to perform the Work. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 4 of 31 PART C – FORM OF TENDER 7. Our Address is as follows: Phone: ____ ______ - ________ Fax: ____ ______ - ________ E-mail: _____________________ Attention: This Tender is executed this ________ day of _________________, 201_. Contractor: (Full Legal Name of Corporation, Partnership or Individual) (Authorized Signatory and Corporate Seal) (Authorized Signatory) District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 5 of 31 PART C – FORM OF TENDER APPENDIX 1 - SCHEDULE OF PRICES Contract: District Energy System Phase 1: DPS, ETS and CBP Service Connections Reference No.: 1220-020-2014-003 From Tenderer: ________________________________________________ Company name The sum of the amounts shown in the table below must equal the Tender Price(s) stipulated in the space provided in the Form of Tender which, for greater certainty, is/are the Tenderer’s proposed Contract Price(s). Every row of the below table should be completed with a dollar amount. Table A: Pricing Schedule Item Description of Work 1. GENERAL 1.1 1.2 1.3 1.4 Bonding and Insurance Mobilization/Demobilization Traffic & Pedestrian Management Survey and Record Drawings Unit Est. Qty. L.S. L.S. L.S. L.S. - lin.m 425 lin.m lin.m lin.m lin.m 0 0 7 0 lin.m lin.m lin.m lin.m 10 9 64 129 lin.m lin.m lin.m lin.m 0 0 7 4 Unit Price Total Price Subtotal Items 1.1 to 1.4 2. SITE WORK 2.1 Site Preparation Trenching, Bedding & Import Backfill (0 - 1.2 m Depth) a) 75 mm dia Piping b) 100 mm dia Piping c) 150 mm dia Piping d) 300 mm dia Piping Trenching, Bedding & Import Backfill (1.2 - 1.8 m Depth) a) 75 mm dia Piping b) 100 mm dia Piping c) 150 mm dia Piping d) 300 mm dia Piping Trenching, Bedding & Import Backfill (1.8 - 2.4 m Depth) a) 75 mm dia Piping b) 100 mm dia Piping c) 150 mm dia Piping d) 300 mm dia Piping Trenching, Bedding & Native Backfill (0 - 1.2 m Depth) 2.2 2.3 2.4 2.5 District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 6 of 31 PART C – FORM OF TENDER 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 a) 75 mm dia Piping b) 100 mm dia Piping c) 150 mm dia Piping d) 300 mm dia Piping Trenching, Bedding & Native Backfill (1.2 - 1.8 m Depth) a) 75 mm dia Piping b) 100 mm dia Piping c) 150 mm dia Piping d) 300 mm dia Piping Trenching, Bedding & Native Backfill (1.8 - 2.4 m Depth) a) 75 mm dia Piping b) 100 mm dia Piping c) 150 mm dia Piping d) 300 mm dia Piping Trenching, Bedding & Native Backfill (2.4 - 3.0 m Depth) a) 75 mm dia Piping b) 100 mm dia Piping c) 150 mm dia Piping d) 300 mm dia Piping Site Restoration a) Concrete Sidewalk / Pavement b) Asphalt Road Repair c) Concrete Curb and Gutter d) Soft Surface Landscape D.E.S. Floating Pad Utilities Crossing Watermain Replacement Air Release Valve Assembly 100 mm dia. Sanitary Sewer 25 mm dia. Water Service Tree and Root Mass Removal lin.m lin.m lin.m lin.m 0 0 0 8 lin.m lin.m lin.m lin.m 0 0 17 75 lin.m lin.m lin.m lin.m 0 0 0 55 lin.m lin.m lin.m lin.m 0 0 0 40 lin.m lin.m lin.m lin.m ea ea ea ea m m ea 12 230 4 180 2 4 3 1 49 20 7 L.S. L.S. L.S. L.S. - L.S. - L.S. - Subtotal Items 2.1 to 2.16 Inclusive 15. MECHANICAL 15.1 D.E.S. Piping and Valve System a) DWG C02-C-101 b) DWG C02-C-102 c) DWG C02-C-103 d) DWG C02-C-104 Connections to Containerized Boiler Plant Testing & Commissioning of D.E.S. Piping System 15.2 15.3 District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 7 of 31 PART C – FORM OF TENDER 15.4 Leak Detection L.S. - Subtotal Items 15.1 to 15.4 Inclusive 16. ELECTRICAL & CONTROLS 16.1 16.2 16.3 16.4 16.4 17. Rize Building BOSA Building Central Control Station Connection to PCI Building Connection to Concord Building INDETERMINATE ITEMS L.S. L.S. L.S. L.S. L.S. - 17.1 17.2 Trench Over Excavation Removal of Existing Abandoned Utilities m3 lin.m 50 50 17.3 Additional Mass Concrete m3 5 17.4 Removal of Buried Concrete Supply, Placement and Compaction of Additional Fill Material as Requested by the Engineer m3 20 tonne 200 Controlled Density Fill m3 50 Trench Rock Removal m3 3 Dritherm m3 1 L.S. L.S. L.S. L.S. 17.5 17.6 17.7 17.8 Subtotal Items 17.1 to 17.8 Inclusive 18. CASH ALLOWANCE 18.1 18.2 Supply of pre-insulated pipes Unknown Utilities - $300,000 $50,000 Subtotal Items 1 to 18 Inclusive GST @ 5% TENDER PRICE (Please transfer amount of Tender “Tender Price” to Form of Tender) District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 8 of 31 PART C – FORM OF TENDER 1.1 Description of Payment Items .1 Work set out in the Schedule of Quantities and Prices shall include, but not be limited by, the following brief descriptions: PART 1 1.1 - GENERAL Bonding and Insurance This item shall include all costs for bonding and insurance for the complete Contract. Payment will be made at the lump sum price tendered in the Schedule of Quantities and Prices on the first progress payment subsequent to submission of documentation of Bonding and Insurance coverage. The lump sum tender under this item shall not exceed 1% of the total tender price. 1.2 Mobilization and Demobilization This item shall include all costs for mobilization and demobilization associated with the Contractor's equipment, site facilities, and services including temporary access road for the work. Payment for mobilization and demobilization will be made at the lump sum price shown in the Tender Form. Fifty percent (50%) of the lump sum price will be paid on the first progress payment certificate due after the Contractor has established the operation and facilities specified, and received the Owner’s approval of the construction schedule. The remaining 50% will be paid upon completion of the contract, removal of equipment, and cleanup and site restoration of the work areas to the satisfaction of the Engineer. The lump sum bid under this item shall not exceed 3% of the total tender. 1.3 Traffic & Pedestrian Management This item shall include all cost to prepare a Traffic and Pedestrian Management Plan that covers the length of the Place of the Work. The Plan must be approved by the City prior to commencement of the Work. Cost should account for possible Plan revisions as requested by the City prior to final approval. This item also includes all costs for labour and equipment to implement the Traffic and Pedestrian Management Plan for the duration of the Work for all areas that it applies to. This includes coordination with, and notification to all applicable parties for lane or road closures. Payment will be made at the lump sum price quoted in the Schedule of Quantities and Prices. 1.4 Survey and Record Drawings This item shall include all costs for labour, materials and equipment to conduct: 1. Construction survey layout of all utilities to lines and grades as shown on drawings; and 2. Record survey of all as-built utility locations and elevations. Record survey information shall be provided to the Engineer in project datum in digital, CSV file (Northing, Easting, Elevation, Description) or AutoCAD DWG format. Information to include, but not limited to: District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 9 of 31 PART C – FORM OF TENDER Manholes, Building Penetration (Location and Elevation) Centerline inverts of standard benched manholes Finished lid/rim centerline elevation D.E.S. Pipe (Location, Invert Elevation, Finished Surface Grade) All mainline fittings, bends, tees, valves, end caps, etc… All service line fittings, bends, tees, valves, end caps, etc… General (Location and Elevation) Existing utilities locations and inverts at D.E.S. Pipe crossings Note: Construction Survey does not replace the requirement for the Contractor to maintain an accurate set of red-lined record drawings indicating all changes to the design. Payment will be made at the lump sum price quoted in the Schedule of Quantities and Prices. PART 2 2.1 - SITE WORK Site Preparation This item shall include all costs for the completion of site work preparation for the D.E.S. piping installation. This shall include, but not be limited to, the clearing and grubbing of the site, removal of cleared and grubbed materials from site, and installation of temporary fencing. This shall also include asphalt and concrete saw cut as per the Drawings and Specifications. Payment will be made at the unit price tendered per lineal metre of prepared trench piping. 2.2 a),b),c),d) Trenching, Bedding & Import Backfill (0 - 1.2 m) This item provides all compensation for all costs for excavation depth from 0 to 1.2 m of piping trenches, supply, place and compact bedding material and trench backfill. (For trenches to accommodate the D.E.S. Piping). The work includes but is not limited to: Trench excavation Disposal of excavated material Supply, placement, and compaction of bedding material in the pipe zone Approved trench backfill Excavation for tee installation Shoring and dewatering Testing of bedding and backfill material Support of existing structures and piping Payment will be made at the unit rate tendered for each lineal metre of piping trench. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 10 of 31 PART C – FORM OF TENDER 2.3 a),b),c),d) Trenching, Bedding & Import Backfill (1.2 – 1.8 m) This item provides all compensation for all costs for excavation depth from 1.2 to 1.8 m of piping trenches, supply, place and compact bedding material and trench backfill. (For trenches to accommodate the D.E.S. Piping). The work includes but is not limited to: Trench excavation Disposal of excavated material Supply, placement, and compaction of bedding material in the pipe zone Approved trench backfill Excavation for tee installation Shoring and dewatering Testing of bedding and backfill material Support of existing structures and piping Payment will be made at the unit rate tendered for each lineal metre of piping trench. 2.4 a),b),c),d) Trenching, Bedding & Import Backfill (1.8 – 2.4 m) This item provides all compensation for all costs for excavation depth from 1.8 to 2.4 m of piping trenches, supply, place and compact bedding material and trench backfill. (For trenches to accommodate the D.E.S. Piping). The work includes but is not limited to: Trench excavation Disposal of excavated material Supply, placement, and compaction of bedding material in the pipe zone Approved trench backfill up to subgrade Excavation for tee installation Shoring and dewatering Testing of bedding and backfill material Support of existing structures and piping Payment will be made at the unit rate tendered for each lineal metre of piping trench. 2.5 a),b),c),d) Trenching, Bedding & Native Backfill (0 - 1.2 m) This item provides all compensation for all costs for excavation depth from 0 to 1.2 m of piping trenches, supply, place and compact bedding material and trench backfill. (For trenches to accommodate the D.E.S. Piping). The work includes but is not limited to: Trench excavation Stockpile and disposal of excavated material Supply, placement, and compaction of bedding material in the pipe zone Reuse native trench backfill Excavation for tee installation Shoring and dewatering Testing of bedding and backfill material Support of existing structures and piping Payment will be made at the unit rate tendered for each lineal metre of piping trench. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 11 of 31 PART C – FORM OF TENDER 2.6 a),b),c),d) Trenching, Bedding & Native Backfill (1.2 – 1.8 m) This item provides all compensation for all costs for excavation depth from 1.2 to 1.8 m of piping trenches, supply, place and compact bedding material and trench backfill. (For trenches to accommodate the D.E.S. Piping). The work includes but is not limited to: Trench excavation Stockpile and disposal of excavated material Supply, placement, and compaction of bedding material in the pipe zone Reuse native trench backfill Excavation for tee installation Shoring and dewatering Testing of bedding and backfill material Support of existing structures and piping Payment will be made at the unit rate tendered for each lineal metre of piping trench. 2.7 a),b),c),d) Trenching, Bedding & Native Backfill (1.8 – 2.4 m) This item provides all compensation for all costs for excavation depth from 1.8 to 2.4 m of piping trenches, supply, place and compact bedding material and trench backfill. (For trenches to accommodate the D.E.S. Piping). The work includes but is not limited to: Trench excavation Stockpile and disposal of excavated material Supply, placement, and compaction of bedding material in the pipe zone Reuse native trench backfill Excavation for tee installation Shoring and dewatering Testing of bedding and backfill material Support of existing structures and piping Payment will be made at the unit rate tendered for each lineal metre of piping trench. 2.8 a),b),c),d) Trenching, Bedding & Native Backfill (2.4 – 3.0 m) This item provides all compensation for all costs for excavation depth from 2.4 to 3.0 m of piping trenches, supply, place and compact bedding material and trench backfill. (For trenches to accommodate the D.E.S. Piping). The work includes but is not limited to: Trench excavation Stockpile and disposal of excavated material Supply, placement, and compaction of bedding material in the pipe zone Reuse native trench backfill Excavation for tee installation Shoring and dewatering Testing of bedding and backfill material Support of existing structures and piping Payment will be made at the unit rate tendered for each lineal metre of piping trench. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 12 of 31 PART C – FORM OF TENDER 2.9 a),b),c),d) Site Restoration This item shall include all costs for re-instatement of existing sod, seed, topsoil, turf, asphalt, sidewalks and curb and gutters, in areas disturbed by construction to City of Surrey standards. This item shall also include all costs for sawcut removal of concrete and asphalt, replacement of base and subbase materials as detailed on the construction drawings, line painting if applicable and sidewalk and curb restoration. All waste debris shall be disposed of off-site. Restoration work covered under this item is limited to that which is a direct result of construction activities in the immediate vicinity of the proposed works. Any other area appurtenances, surface features, etc. that have been disturbed by the Contractor shall be restored to their original condition at the cost of the Contractor. Payment will be made at the unit rate tendered in the Schedule of Quantities and Prices. 2.10 D.E.S. Floating Pad This item provides compensation for all costs for supply, construction, and installation of concrete caps as shown on the drawings to protect the D.E.S. piping including but not limited to formwork, concrete, and metal reinforcement. Payment will be made at the unit rate tendered in the Schedule of Quantities and Prices. 2.11 Utilities Crossing This item provides compensation for all costs for supply, preparation, and installation of Styrofoam and insulation providing minimum clearance between existing utilities or bedrock and the D.E.S. piping. Payment will be made at the unit rates tendered for each crossing requiring minimum clearance. 2.12 Watermain Replacement This item provides compensation for all costs for the relocation of existing watermain, to City of Surrey Standards, in direct conflict with the D.E.S. piping alignment. Payment will be made at the unit rate tendered in Schedule 1 for each relocation as directed by the Engineer. 2.13 Air Release Valve Assembly This item provides compensation for all costs for material and labour to supply and install air release valve manhole assembly including but not limited to precast manhole sections, lid, frame and cover, concrete blocks, and drain rock. The cost for valves, pipe tapping and related mechanical work shall be included in Part 15. Payment will be made at the unit rate tendered for each air valve assembly installed. 2.14 100-mm-diameter Sewer This item provides compensation for all costs for material and labour to supply and install 100-mm-diameter PVC sanitary sewer service as shown on the drawings and specifications, including but not limited to piping, fittings, couplings, equipment, cleanouts, inspection chambers, and all other additional work related to sanitary sewers and services. Payment will be made at the unit rate tendered for each lineal metre of piping installed. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 13 of 31 PART C – FORM OF TENDER 2.15 25-mm-diameter Water Service This item provides compensation for all costs for material and labour to supply and install 25mm-diameter water service as shown on the drawings and specifications, including but not limited to piping, valves, fittings, couplings, equipment, curb stop, connections to municipal utility and boiler plant, all other additional work related to water services. Payment will be made at the unit rate tendered for each lineal metre of piping installed. 2.16 Tree and Root Mass Removal This item provides compensation for all costs for material and labour to remove tree and root mass from the pipe trench where in conflict with the D.E.S. piping where indicated on the drawings and where instructed by the Engineer. Payment will be made at the unit rate tendered for each tree and root mass removed. PART 15 - 15.1 a),b),c),d) MECHANICAL D.E.S. Piping and Valve System This item provides compensation for all costs for mechanical works required in accordance with the drawings and specifications. This item shall include, but not be limited to, supply, preparation, and installation of D.E.S. piping, valves, equipment, pipe supports, fittings, couplings and all other additional work related to D.E.S. piping equipment. This item shall also include all x-ray testing of every D.E.S. piping weld. Payment will be made at the lump sum price quoted in the Schedule of Quantities and Prices. 15.2 Connections to Containerized Boiler Plant This item provides compensation for all costs for materials and labour for all connections to the Containerized Boiler Plant as shown on the drawings including but not limited to D.E.S. piping, water service and sanitary services. Payment will be made at the lump sum price quoted in the Schedule of Quantities and Prices. 15.3 Testing & Commissioning of D.E.S. Piping System This item provides compensation for all costs required to flush, test, and commission all D.E.S. piping system installed as per the Drawings and Specifications. Payment will be made at of the lump sum price tendered in the Schedule of Quantities and Prices. 15.4 Leak Detection This item provides compensation for all costs required for leak detection of the entire D.E.S. piping system installed. This will include the installation and wiring of the X1L in the Containerized Boiler Plant and the 1517 boxes in RIZE and BOSA buildings only. Payment will be made at of the lump sum price tendered in the Schedule of Quantities and Prices. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 14 of 31 PART C – FORM OF TENDER PART 16 - ELICTRICAL & CONTROLS 16.1 RIZE Building This item provides compensation for all costs for electrical and controls works required in accordance with the drawings and specifications for RIZE building. This item shall include, but not be limited to, supply and installation of all electrical and controls components in drawing C02-P-003 and all other additional work to have a fully operational system as per the project specifications. Payment will be made at the lump sum price quoted in the Schedule of Quantities and Prices. 16.2 BOSA Building This item provides compensation for all costs for electrical and controls works required in accordance with the drawings and specifications for BOSA building. This item shall include, but not be limited to, supply and installation of all electrical and controls components in drawing C02-P-004 and all other additional work to have a fully operational system as per the project specifications. Payment will be made at the lump sum price quoted in the Schedule of Quantities and Prices. 16.3 Central Control Station This item provides compensation for all costs for electrical and controls works required in accordance with the drawings and specifications for installing a central control station with a Historian at the City Hall that will remotely connect to 4 Energy Transfer Stations and the Containerized Boiler Plant. Payment will be made at the lump sum price quoted in the Schedule of Quantities and Prices. 16.4 Connection to PCI ETS This item provides compensation for all costs for electrical and controls works required in accordance with the drawings and specifications for remotely connecting the energy meter (supplied and installed by Others) at the PCI building to the central control station at the City Hall. Payment will be made at the lump sum price quoted in the Schedule of Quantities and Prices. 16.5 Connection to Concord ETS This item provides compensation for all costs for electrical and controls works required in accordance with the drawings and specifications for remotely connecting the energy meter (supplied and installed by Others) the Concord building to the central control station at the City Hall. Payment will be made at the lump sum price quoted in the Schedule of Quantities and Prices. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 15 of 31 PART C – FORM OF TENDER PART 17 - INDETERMINATE ITEMS All indeterminate items and the quantities identified in Schedule A may increase, decrease or not be used at all. No payment will be made if the work is not undertaken. 17.1 Trench Over Excavation This item provides compensation for all costs associated with vertical pipe trench over excavation at depth greater than 2.4 m as directed by the Engineer. The work includes but is not limited to: Trench over excavation Disposal of over excavated material Additional fill material Shoring and Dewatering Testing of additional fill material Payment will be made at the unit rate tendered based on the fill volume determined in the field by the Engineer. 17.2 Removal of Existing Abandoned Utilities This item includes all costs for supply of all materials, equipment, labour, excavation and backfill to remove and dispose of existing abandoned utilities in conflict with the D.E.S. piping alignment as directed by the Engineer. This item shall also include the additional fill material to replace the abandoned utilities volume. Payment will be made at the unit rate tendered for each lineal metre of abandoned pipe removed. 17.3 Additional Mass Concrete as Requested by the Engineer This item shall include all costs for crude forming and placement of mass concrete as requested by the Engineer. Payment will be made at the unit price quoted in the Schedule of Quantities and Prices for each cubic meter of concrete in place. Measurement will be based on truck volume as per dispatch slips certified by the Engineer. 17.4 Removal of Buried Concrete This item shall include all costs for supply of all materials, equipment, and labour for removal of buried concrete in conflict with the D.E.S. piping trench as directed by the Engineer. This item shall include, but not limited to saw cut and removal of concrete, disposal off site, and backfill with import material. Payment will be made at the unit price quoted in the Schedule of Quantities and Prices for each cubic meter of concrete removed. Measurement will be based on field measurement by the Engineer 17.5 Supply, Placement and Compaction of Additional Fill Material as Requested by the Engineer This item shall include all costs for supply, placement, and compaction of additional 75 mm minus free draining structural backfill material as requested by the Engineer. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 16 of 31 PART C – FORM OF TENDER Payment will be made at the unit price quoted in the Schedule of Quantities and Prices. 17.6 Controlled Density Fill This item shall include all costs for forming, placing, finishing and curing of additional concrete density fill as requested by the Engineer. Payment will be made at the unit price quoted in the Schedule of Quantities and Prices for each cubic meter of concrete in place. Measurement will be based on truck volume as per dispatch slips certified by the Engineer. 17.7 Trench Rock Excavation This item provides compensation for the addition-al cost of removing and disposing of trench rock over that of earth excavation. Trench rock excavation shall include the excavation and disposal of all material which in the opinion of the Engineer requires for its removal either drilling and blasting, wedging, sledging, or breaking with a power operated hand tool. Rock excavation does not include the excavation of soft or disintegrated rock which can be removed with a handpick or poweroperated excavation machine. NO payment will be considered for trench rock encountered in subgrade fill sections. Rock excavation shall also include the removal and disposal of boulders exceeding one (1) cubic metre in volume if within a trench section, or if exceeding two (2) cubic metres if within a road subgrade section, which lie wholly within the excavation and in the opinion of the Engineer interfere with the work. If an outcropping of bedrock protrudes into the excavation and a portion less than one (1) cubic metre in volume is removed by blasting, payment will be made for a minimum of one (1) cubic metre. Excavated rock shall be disposed of on-site at locations designated by the Engineer. Payment will be made for the volume of rock excavation at the unit rate tendered per cubic metre. 17.8 Dritherm This item shall include all costs for supply, formwork, and placement of Dritherm material as requested by the Engineer. Payment will be made at the unit price quoted in the Schedule of Quantities and Prices for each cubic meter of dritherm placed. Measurement will be based on field measurement by the Engineer. PART 18 - CASH ALLOWANCE Refer to Division 00 for terms and conditions District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 17 of 31 PART C – FORM OF TENDER Table B: Schedule of Values by Trade: (SAMPLE) The following is a breakdown of Subcontractor prices and forms part of this Contract, and do not include GST. This is to be submitted within fourteen (14) days of award of Contract and is not required to be submitted at time of Tender closing. The Subcontractor shall provide all the necessary materials and perform all of the following work, to be installed on the premises of the Owner in accordance with all documents herein mentioned. LINE ITEM SECTION OF WORK PRICES 1. e.g. Site Services $ 2. Demobilization and Make Good Surfaces $ 3. Carpentry and Cabinet Work $ 4. $ 5. $ 6. $ 7. $ 8. $ 9. $ $ $ $ District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 18 of 31 PART C – FORM OF TENDER Table C: List of Cash Allowances: This section of the specifications forms part of the Contract Documents and is to be read, interpreted and coordinated with all other parts. The Tenderer shall include in the Tender Price all Cash Allowances listed below, which allowances shall be expended in whole or in part as the Owner shall direct, the amount of the Contract sum being adjusted in conformity therewith. The Tenderer shall include in the Tender price for such sums for expenses, supervision, Overhead and profit as he deems proper on account of all Cash Allowances. No demands for expenses or profit other than those included in the Tender price will be allowed. These Cash Allowances – which do not include GST – may be increased, decreased or deleted from the Contract with no adjustments to the Contract other than the net amount of such a variation. The Owner reserves the right to place a Contract or Contracts, for any and all parts of items included in the cash allowances at its discretion. Cooperate & coordinate with other contractors as may be appointed by the Owner. Cash Allowances as listed in this section are to be carried by the Contractor and are in addition to the work detailed in other sections of the specifications and drawings. 1. The Contractor shall include in the Form of Tender all cash allowances listed below, which shall be expended in whole or in part as the Owner shall direct, the amount of the Contract sum being adjusted in conformity therewith. Include the following Cash Allowance amounts (which do not include GST): Description of Cash Allowance Amounts Supply of Logstor Piping $300,000 Unknown Utility Conflicts $50,000 District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 19 of 31 PART C – FORM OF TENDER APPENDIX 1 - SCHEDULE OF PRICES Table D: - Optional Prices These optional prices will be used to change the scope of the Work upon written instruction from the Owner. The alternate prices will be applied in accordance with PART 6 CHANGES IN THE WORK of the General Conditions of the Stipulated Price Contract (CCDC 2 – 2008), as modified by the Supplementary General Conditions (Schedule 1 to Part D – Form of Agreement). The prices should include (i) all labour, material and other costs, (ii) overhead and profit, (iii) PST, and (iv) all other taxes, duties, assessments, charges and fees, except for GST. Effect on Tender Price ($) (GST Excluded) LINE ITEM ADDITION DESCRIPTION OF SEPARATE PRICE ITEMS .1 $ DEDUCTION $ Other Optional Items – Include the details of any other proposed optional items below. .2 $ $ .3 $ $ .4 $ $ District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 20 of 31 PART C – FORM OF TENDER APPENDIX 1 - SCHEDULE OF PRICES Table E: Separate Prices The following are our prices for the optional separate goods and services listed hereunder. Such separate goods and services and amounts are NOT included in our Tender Price. The separate prices are a deduction from or addition to the Tender Price and do not include GST. DO NOT state a revised Tender Price. Effect on Tender Price ($) (GST Excluded) LINE ITEM ADDITION DESCRIPTION OF SEPARATE PRICE ITEMS DEDUCTION .1 $ $ .2 $ $ .3 $ $ .4 $ $ Include a detailed description of any proposed separate price items in the spaces indicated above, including the associated effect on the Tender Price (excluding GST). Include any additional product sheets or other information necessary to describe the proposed separate price items. NOTE: The financial evaluations will be based on the Tender Price, not including the effect of any separate price items. The above prices do not include GST. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 21 of 31 PART C – FORM OF TENDER APPENDIX 1 - SCHEDULE OF PRICES Table F: Contractors Current Force Account Labour Rates Tenderers should provide force account labour rates in the table below for all labour categories that will be involved in the Work. The labour and Construction Equipment rates will remain firm for the term of the Contract and will be used by the Owner for the purpose of evaluating and valuing changes in the Work in the case of lump sum, or in case of force account valuation. The labour rates provided below are all inclusive and include without limitation, wages, taxes and assessments and benefits payable in accordance with applicable laws, mobilization and demobilization, supervision, administration, small tool rental, overhead and profit. For the purposes of the above, small tools are considered to be any tool worth $2,000 or less in new value. All other tools should be listed as equipment in the table under Table G below. STRAIGHT TIME/HR (EXCLUDE GST) LABOUR CATEGORY OVERTIME RATE/HR (EXCLUDE GST) .1 Site Superintendent / Site Project Manager $ $ .2 Foreman $ $ .3 Carpenter $ $ .4 Labourer / Helper $ $ .5 Plumber (BCTQ) $ $ .6 Apprentice (or experienced) $ $ .7 Electrician (BCTQ) $ $ .8 Apprentice (or experienced) $ $ District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 22 of 31 PART C – FORM OF TENDER APPENDIX 1 - SCHEDULE OF PRICES Table G: Construction Equipment Rates Rates for equipment that will be used in performing the Work are state below and will remain firm for the term of the Contract. The Owner will use these rates for the purpose of evaluating and valuing changes in the Work in the case of lump sum, or in case of force account valuation. The rates provided below are all inclusive and include without limitation, operator, fuel, lubrication, service, maintenance, depreciation, mobilization and demobilization, overhead and profit. It is acknowledged by the Contractor that if any portion of an hour is spent in performing the Work on a force account basis, a pro-rated portion of the force account rate shall only be charged. CONSTRUCTION EQUIPMENT CLASSIFICATION HOURLY RATE (EXCLUDE GST) SPECIFY MAKE & MODEL $ $ $ $ $ $ $ $ $ $ We confirm that the rates quoted above will remain in force until _________________, 201_. (Additional pages may be attached to this page. Each such additional page is to be clearly marked “ITT (state tender name and tender number), FORM OF TENDER – PART C. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 23 of 31 PART C – FORM OF TENDER APPENDIX 2 – TENDERER’S EXPERIENCE IN SIMILAR WORK Contract: District Energy System Phase 1: DPS, ETS and CBP Service Connections Reference No.: 1220-020-2014-003 From Tenderer: ________________________________________________ Company name Year Completed Description of Contract For Whom Work Performed District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Value Page 24 of 31 PART C – FORM OF TENDER APPENDIX 3 – TENDERER’S CONSTRUCTION EQUIPMENT Contract: District Energy System Phase 1: DPS, ETS and CBP Service Connections Reference No.: 1220-020-2014-003 From Tenderer: ________________________________________________ Company name The Tenderer agrees that the minimum availability of Construction Equipment will be as listed and that no changes, additions or deletions will be made to this plant and equipment without approval of the Contract administrator. TENDERER’S CONSTRUCTION EQUIPMENT The tenderer to list the Construction Equipment he proposes to use on the Work: Construction Equipment Under Tenderer’s Control Construction Equipment To Be Rented: Construction Equipment To Be Purchased: District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 25 of 31 PART C – FORM OF TENDER APPENDIX 4 – TENDERER’S KEY PERSONNEL Contract: District Energy System Phase 1: DPS, ETS and CBP Service Connections Reference No.: 1220-020-2014-003 From Tenderer: ________________________________________________ Company name The Tenderer should provide full time qualified supervision, management and administration of its Work throughout the duration of the project to the satisfaction of the Owner for which purpose the Tenderer proposes the following individuals: NAME: 1. ___________________________________ shall be responsible for supervision of the Work (resume of qualifications and experience attached). 2. ___________________________________ shall be responsible for project management and administration of the Work (resume of qualifications and experience attached). 3. ___________________________________ shall be responsible for QA/QC of the Work (resume of qualifications and experience attached). 4. ___________________________________ shall be responsible for Leadership in Energy and Environmental Design (LEED) coordination of the Work (resume of qualifications and experience attached. 5. ___________________________________ shall be responsible for safety of the Work (resume of qualifications and experience attached. 6. ___________________________________ shall be responsible for estimating the cost of the Work (resume of qualifications and experience attached. District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 26 of 31 PART C – FORM OF TENDER APPENDIX 5 – SUBCONTRACTORS Contract: District Energy System Phase 1: DPS, ETS and CBP Service Connections Reference No.: 1220-020-2014-003 From Tenderer: ________________________________________________ Company name The list of Subcontractors that we propose to employ on the execution of this Contract are as follows: LIST OF SUBCONTRACTORS Sub-Trade Legal Name of Subcontractor District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Address of Subcontractor Page 27 of 31 PART C – FORM OF TENDER APPENDIX 6 - PRELIMINARY CONSTRUCTION SCHEDULE Contract: District Energy System Phase 1: DPS, ETS and CBP Service Connections Reference No.: 1220-020-2014-003 From Tenderer: ________________________________________________ Company name Tenderers should provide a preliminary Construction Schedule for the goods and services, including the range of start dates to which your firm is prepared to commit and anticipated completion dates. This preliminary Construction Schedule should work within the timeframes as may be outlined by the City. Any conflict in the two should be described. The Time Schedule should include a list of all anticipated meetings with the City and their locations. The City prefers the preliminary Construction Schedule to be provided as a Microsoft Project Gantt chart both in paper and electronically. Include a list of all assumptions used in developing the preliminary Construction Schedule for the goods and services as presented in Specification Part F and Construction Design Drawings Part G, but not limited to the following: • • • • • • • • • • Project Meetings Design Milestones Mobilization and Demobilization Construction/Installation Milestones Equipment and Material Procurement Training and Demonstration Periods Work Commencement Date Substantial Performance of the Work Date Total Performance of the Work Date Final Completion of the Goods and Services The schedule included may be on 11”x17” size sheets. Proposed Disposal Site: ________________________________________________ District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 28 of 31 PART C – FORM OF TENDER – SCHEDULE 1 District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 29 of 31 PART C – FORM OF TENDER – SCHEDULE 2 PRIME CONTRACTOR DESIGNATION LETTER OF UNDERSTANDING As per the requirements of the Workers’ Compensation Act Part 3, Division 3, Section 118 (1-3), which states: Coordination of multiple-employer workplaces 118 (1) In this section: “multiple-employer workplace” means a workplace where workers of 2 or more employers are working at the same time: “prime Contractor” means in relation to a multiple-employer workplace, (a) the directing Contractor, employer or other person who enters into a written proposal with the Owner of that workplace to be the prime Contractor for the purposes of this Part, or (b) if there is no proposal referred to in paragraph (a), the Owner of the workplace. (2) The prime Contractor of a multiple-employer workplace must (a) ensure that the activities of employers, workers and other persons at the workplace relating to occupational health and safety are coordinated, and (b) do everything that is reasonably practicable to establish and maintain a system or process that will ensure compliance with this Part and the regulation in respect to the workplace. (3) Each employer of workers at a multiple-employer workplace must give to the prime Contractor the name of the person the employer has designated to supervise the employer’s workers at that workplace. By signing this Contract, the Contractor accepts all responsibilities of a Prime Contractor as outlined in the Workers’ Compensation Act, and WCB (OH&S Regulation). As a Contractor signing this Contract with the Owner, you are agreeing that your Company, Management staff, Supervisory staff and workers will comply with the Workers’ Compensation Board (WCB) Occupational Health and Safety Regulation and the Workers’ Compensation (WC) Act. Any WCB violation by the Prime Contractor may be considered a breach of Contract resulting in possible termination or suspension of the Contract and/or any other actions deemed appropriate at the discretion of the Owner. Any penalties, sanctions or additional costs levied against the Owner, as a result of the actions of the Prime Contractor are the responsibility of the Prime Contractor. I, the undersigned, acknowledge having read and understand the information above. By signing this Contract, I agree as a representative of the firm noted below, to accept all responsibilities of the Prime Contractor for this project. I fully understand and accept the responsibilities of the Prime Contractor designation in accordance with the Workers’ Compensation Act while contracted by the City of Surrey for the project as described in this Contract and will abide by all Workers’ Compensation Board Regulation requirements. Contract No: 1220-020-201_ - _ _ _. Contract Title: _______________________________ Name of Contractor: _______________________________ Qualified Coordinator’s Name: (Construction Only) _______________________________ Worksafe BC #: _______________________________ Signature of Authorized Representative: ___________________________________ District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 30 of 31 PART C – FORM OF TENDER – SCHEDULE 3 RISK, HEALTH & SAFETY Responsibility of Contractor(s) The City of Surrey strives to maintain a safe work environment for employees and Contractors and insists upon the enforcement of safe practices and procedures in all premises and in all work activities. It is essential that all Contractors and their employees and Subcontractor(s) perform in the same manner. As a Contractor to the City of Surrey, you are expected to conform to the requirements of the Workers’ Compensation Act, the WCB Occupational Health and Safety Regulation and to all federal, provincial and local laws and regulations. Any City of Surrey employee has the authority to order an unsafe act to cease or to have an unsafe piece of equipment removed from the premises or, in extreme situations, to shut down a job entirely. The following information is provided as typical City of Surrey requirements, but does not relieve the Contractor from complying with all applicable local, provincial and federal laws, regulations and bylaws. PERSONNEL 1. You are expected to inform your employees of any potential hazard in the workplace and advise of appropriate action to be taken should a hazard be found or a fire or accident occur. 2. Contractors will restrict persons invited on the premises to employees only. No families or friends are permitted. 3. The Contractor will advise the Owner of any on-site accidents involving the Contractor’s employees, or injuries to others caused by the Contractor’s business. GENERAL SAFETY RULES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Horseplay, gambling and the use of alcohol or narcotics will not be tolerated. Orderliness and good housekeeping are basic requirements and must be maintained at all times. Any equipment, which could create a hazard, must be maintained in good condition. Restricted and controlled products will be labeled, used and stored in accordance with the associated regulations, e.g. WHMIS. Contractors will use a regular system of inspections to detect and correct hazardous conditions, safety violations and unsafe working practices on the job site. Contractors will ensure their employees utilize proper safety equipment and clothing as required for job site activities. Contractors must follow and have on site proper written safe work procedures for hazardous work, e.g. confined space entry, lockout, excavations and shoring, etc. All ladders must be of an approved type and length. Unacceptable ladders must be removed immediately from the premises. All vehicles and equipment on Owner’s property must be kept in safe mechanical condition at all times, and be operated only by persons with a valid driver’s license and/or proper training and qualifications. Contractors will not operate any equipment, valves, switches, etc., which are part of the Owner’s operation, unless specific permission is received from the Department Representative. Accumulation of oily rags, combustible refuse or similar fire hazards will not be tolerated. Your safety record and attitude are important criteria used to judge your qualification for future bidding on solicitations with the City of Surrey. You can help ensure employee safety and your eligibility for future business with the Owner if you exhibit and practice a “Safe Work - Safe City” attitude. - END OF SECTION - District Energy System Phase 1, Invitation To Tender No.: 1220-020-2014-003 Page 31 of 31