< Project Title> Project Closure [Some of the following sections may not be required in the context of your project and you may need to have additional sections – we include likely headings in this template. Text in italics is for information and context and should be deleted once addressed. The project closure should ideally be concise – no more than 3 or 4 pages maximum.] Project Manager’s Report [A summary of the project’s performance] Project Sponsor’s Comments [Brief comments from the Project Sponsor on the project and their thoughts on the closure of the project] Review of the Business Case [Summarising the eventual outputs and outcomes compared with the original business case including benefits achieved to date, residual benefits to be achieved, and variations from the business case] Review of Project Objectives [How did the project perform against planned targets for time, cost, quality, scope, benefits and risk? Were the project’s strategies and controls effective?] Review of Team Performance [How did the team work? For example, were the right people involved from the start? Provide recognition for good performance] Review of Outputs/ Deliverables [Were outputs or deliverables completed according to the original plan? What is missing and what was added?] Version 1 – March 2015 1 Strategy, Planning & Governance Summary of follow-on action recommendations [Is there anything that needs to be completed or carried on after the formal end of the project? Are there any ongoing risks? What happens if these actions are carried out? A named person, role or team should be identified to take responsibility for each recommended action] Are there any requirements for future actions (e.g. archiving documents or follow-up evaluation for funders)? Yes/ No [delete as required] If Yes, please outline the requirements and who will own them: [Details of any requirements that need to be considered once the project is formally closed and who will ensure that they are carried out] Details of project documentation [Specify the location of project documentation e.g. M:drive filepath, Google drive etc. in case reference to it is needed at a later stage] Lessons Report [Generally what went well, what want badly and any recommendations that come out of this review] Project sign-off [Detail the arena or method through which this report was formally agreed and the project officially closed – for example, this may be at a project meeting or through agreement with the project sponsor] <Name(s) of those involved in the project closure, Role, Dept Date> 2