Sacramento City College Unit Plans Completed Spring 2005 Department Name: Information Technology Department Spokesperson: Division Dean: Elaine Ader Place an X in the boxes of included elements: X Accomplishments X Three-Year Plan X Action Plan X Budget Request X Budget Narrative X Key Performance Indicators Information Technology Department / Accomplishments 2004 – 2005 # 1a 1b 1c 1d 1e 2a 2b 2c 2d 2e 2f 3a 3b 3c Linkage to Year-end Status and Accomplishments Other Plans Goal 1: Develop Technology Planning Processes that integrate with Programs/Services and Facilities Plans Support Technology and Graphic Communication building processes through Theme 3 Ongoing construction phase Support Performing Arts complex design Theme 3 Attended initial planning meeting process. Increase reliability of network servers by increasing air conditioning and backup Theme 3 Air conditioning completed electrical capabilities. Determine technology needed to support instructional and service goals and Goal III Ongoing develop/support plans to acquire. Integrate Technology Plan with Master Plan for Goal V Ongoing Student Success. Goal 2: Develop and implement systems to support college processes Implement curriculum management system Theme 1 Done Implement “best practices” in network use Ongoing Refine systems for remote monitoring and Implemented Patchlink; planning E-Policy Theme 5 updating of computer workstations. Orchestrato Implement UTP. Goal I Done Support implementation of new system to track Delayed student services and lab use. Expand and support use of Keyfile Goal III Ongoing Goal 3: Develop innovative approaches to support instruction and student and faculty access to technology Implement network typology to increase access Ongoing and reliability Deploy new faculty and staff computers to Done increase access to technology Provide all faculty and staff with accounts on Theme 1 Ongoing upon request the faculty/staff file server Action Item Information Technology Department / Accomplishments 2004 – 2005 # Action Item Linkage to Other Plans Year-End Status and Accomplishments Upgrade email system to Outlook Web Access Theme 1 Done 2000 to provide additional capabilities Expand use of Manila to support division and Theme 1 Ongoing 3e department pages Design counseling site to provide distance Theme 1 Delayed 3f services Continue participation in Distance Education Goal II Ongoing 3g visioning activities Continue expansion of multimedia classrooms Goal III Ongoing but issues due to budget constraints 3h Continue IT training programs through Staff Goal III Ongoing 3i Development. Implement 4Faculty.org Goal II Set up complete; implementation fall, 2005 3j Determine best technology for digital archiving Theme 1 Technology chosen 3k Goal 4: Develop process for addressing the financial and staff requirements underlying technology implementation and support. Continue operating budget increase to support Goal V Use TTIP funds for coming fiscal year 4a software contracts. Continue to obtain sinking fund to support Accreditation replacement of faculty/staff computers with Planning Approved for 2005-2006 4b processor speeds >400 mz. Agenda Continue to obtain sinking fund to support Accreditation schedule upgrade of network and server Planning Approved for 2005-2006 4c equipment. Agenda Restore 2 IT positions at the ITA 1 and ITA2 Theme V Not accomplished 4d levels. Institute districtwide software licensing Goal V Adobe contract completed 4e agreements Continue partnerships with division IT staffs. Quarterly meetings held 4f Continue support of major IT process with IT Theme V Ongoing but delays due to budget contraints 4g and Budget committees. 3d Three-Year Plan Information Technology Department # 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Long Range Plan Implement technology plan in light of changing college priorities Support facilities design and construction Implement card access printing system in additional locations Continue to obtain resources to support college infrastructure and computing needs Expand use of public network and wireless technology. Implement “best practices” in the classroom and labs Support integration of technology in instruction and services Develop and implement acceptable use policies for network administration Obtain staffing to meet developing college technology priorities. Continue to obtain support for replacement schedule for faculty and staff computing resources Maintain systems to support curriculum process. Expand use of Keyfile system. Work with the Counseling department to implement distance services. Expand use of Manila to manage and maintain college web resources. Expand use of faculty and student file servers to support instructional use of technology. Increase reliability of network services. Implement training programs developed with the Staff Development/Information Technology subcommittee on IT needs Provide continuing training to Computer Services staff. Maintain UTP Plan and implement tracking systems in light of expanded requirements Support distance education visioning plan 2006-2007 2007-2008 2008-2009 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx x Information Technology Department / Action Plan 2005 – 2006 # 1a 1b 1c 1d 1e 2a 2b 2c 2d 2e 2f 3a 3b 3c Linkage to Year-end Status and Accomplishments Other Plans Goal 1: Develop Technology Planning Processes that integrate with Programs/Services and Facilities Plans Support Technology and Graphic Communication building processes through Theme 3 construction phase Support Performing Arts complex design Theme 3 process. Increase reliability of network servers by Theme 3 increasing backup electrical capabilities. Determine technology needed to support instructional and service goals and Goal III develop/support plans to acquire. Update Technology Plan and integrate with Goal V Master Plan for Student Success. Goal 2: Develop and implement systems to support college processes Maintain curriculum management system Theme 1 Implement “best practices” in network use Refine systems for remote monitoring and Theme 5 updating of computer workstations. Maintain UTP. Goal I Support implementation of new system to track student services and lab use. Expand and support use of Keyfile Goal III Goal 3: Develop innovative approaches to support instruction and student and faculty access to technology Implement network typology to increase access and reliability Deploy new faculty and staff computers to increase access to technology Provide all faculty and staff with accounts on Theme 1 the faculty/staff file server Action Item Information Technology Department / Action Plan 2005 – 2006 # Action Item Linkage to Other Plans Year-End Status and Accomplishments Expand use of Manila to support division and Theme 1 department pages Design counseling site to provide distance Theme 1 3f services Implement Distance Education visioning goals Goal II 3g through college and district processes Continue expansion of multimedia classrooms Goal III 3h Continue IT training programs through Staff Goal III 3i Development. Implement 4Faculty.org Goal II 3j Goal 4: Develop process for addressing the financial and staff requirements underlying technology implementation and support. Continue operating budget increase to support Goal V 4a software contracts. Continue to obtain sinking fund to support Accreditation replacement of faculty/staff computers with Planning 4b processor speeds between400 mz and 933 mz. Agenda Continue to obtain sinking fund to support Accreditation schedule upgrade of network and server Planning 4c equipment. Agenda Restore 2 IT positions at the ITA 1 and ITA2 Theme V 4d levels. Expand districtwide software licensing Goal V 4e agreements Continue partnerships with division based IT 4f staffs. Continue support of major IT process with IT Theme V 4g and Budget committees. 3e Information Technology Department Budget Request 2006 - 2007 Line # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Totals Description Support software licenses Replace faculty and staff computes with processor speeds between 400mz and 933 mz. Maintain upgrade of servers and network equipment Hire 2 ITA positions Replace electrical backup systems in network room Keyfile Operating Budget Increase $14000 Instruction Supplies Computers Equipment Furniture New Program Start-up Marketing Materials Remodel Space Faculty Hires Staff Hires $134200 $100000 $2500 2 $60000 $43,000 Student Hires Temp Hires Budget Narrative 2006-2007 Information Technology Department Line # Description Total Amount Priority Rank Justification College has purchased software licenses to support college processes and systems maintenance (i.e., Deep Freeze, Manila…). Operating budget increase needed to pay for maintenance contracts 1 Support software licenses $14000 1 2 Replace faculty and staff computers with processor speeds between 400mz and 933mz. (122) $134200 College 3 Maintain and upgrade servers and networks 4 Hire 2 ITA positions 5 Replace electrical backup systems in network room $60000 3 6 Keyfile $43000 College 7 8 9 10 11 12 13 $100000 College 2 Year two of a college commitment to maintain faculty and staff machines at a level that will support productivity and efficiency. Year two of an ongoing commitment to replace servers and network equipment which is both out of warranty and is not able to support college functions for either instructional or administrative computing In 2002-2003, two ITA positions were removed from the Computer Services budget to support the college personnel budget. The number of helpline calls increased 12% from 2002-2003 to 20032004, following a 10% increase from 2001-2002. The unit is increasingly stressed in being able to provide a high level of service to the campus community with the decreased staff. In addition, there has been a high degree of growth in the number of systems that the Computer Services staff is asked to support, in addition to maintaining the campus network in the light of increasing virus attacks. The college servers and network equipment is concentrated in the LRC IC. The equipment is currently supported by individual UPS systems that allow the network to shut down “gracefully” in the face of loss of electrical power. With the increasing reliance on the college servers and networks on a 24X7 basis, it makes sense to install a more permanent secondary electrical system that would allow the systems to remain active in the face of power outages. The college has committed to the Keyfile system to support document imaging and backup. Yearly maintenance contract costs are $43000. Key Performance Indicators for Information Technology Department Number of HelpLine Calls 2001-2005 YEAR CALLS 2001-2002 2002-2003 2003-2004 20042005 3399 3828 4350 4127 (11 months)