Sacramento City College Strategic Planning System Title: Non-Instructional Equipment and Infrastructure Plan Type: Program Plan OPR: Operations Division Collaborative Group: Campus Development Committee References: Facilities Space Inventory ADA Transition Plan SCC Resource Management and Capital Outlay Program LRCCD Long Range Capital Needs Plan LRCCD Five Year Construction Plan PURPOSE and OBJECTIVES: Maintenance of college non-instructional equipment and infrastructure in a manner which facilitates and enhances the educational and support services offered by the College is funded through the annual resource allocation process. This plan establishes the annual replacement procedures and requirements for classroom, hallway, and office flooring and classroom furniture as well as tracks progress to correct and or repair deficient campus infrastructure associated with the Americans with Disabilities Act of 1990 (ADA) Transition Plan. These procedures provide the basis for the College’s annual funding requirement for non-Instructional equipment and infrastructure; appropriate metric tracking tools; and the mechanisms for identifying and prioritizing repairs and replacements within approved funding levels. The summary of objectives for this program plan includes: Development of a planned replacement cycle for institutional flooring and furniture Tracking completion of campus ADA transition plan repairs PROCEDURES: Summary of Non-Instructional Equipment and Infrastructure Programs 1. The Operations Division monitors the condition of all campus non-instructional equipment and infrastructure and maintains tracking summaries indexed to the Facilities Space Inventory of when replacement of floors and furniture are performed. These summaries are crosschecked with planned modernization schedules to ensure appropriate project timing/prioritization is applied. In addition, repairs to campus infrastructure are cross-referenced with the campus ADA Transition Plan to ensure compliant repairs are accomplished and documented. An overall program plan will be developed for the next academic year and along with a cost estimate for each program. Revised: 11/12 2. The resulting program plan will be reviewed by the President’s Executive Staff (PES = VPs) and a final recommendation provided to the President for decision. The Executive Council will be briefed on the resultant program plan. When approved, the cost estimate will be reflected in the financial plan for ‘above the line funding and included in the annual President’s budget memo to the budget committee. Campus Flooring Summary Name Rodda Hall North Rodda Hall South Lillard Hall Mohr Hall Learning Resource Center Campus Operations Business Union Stadium South Gym / Student Center Cafeteria North Gym Hoos Pool Lusk Aero Center / Bookstore Fine Arts Temp 8 Performing Arts Ctr Technology Cosmetology Temp 9 Student Services Admin of Justice Temp 11 Child Dev Ctr Softball Storage Facility Temp 3 Temp 4 Temp 5 Temp 6 Reprographics Temp 7 Temp 10 Temp 1 Hughes Stadium Parking / Police Facility Davis Outreach Ctr West Sac Ctr McClellan Remodel New Demo Year Const. 1975 1975 1963 1963 1998 1966 1970 1990 Total ASF 36,421 34,781 27,319 16,694 56,388 5,122 29,217 5,116 1969 1939 1937 1953 35,469 14,723 29,179 17,837 1938 1939 2007 1936 1957 2005 2007 1957 1957 2005 1992 2002 1965 2005 1995 1976 1998 1976 2007 1980 1929 2007 1982 2010 2010 32,374 8,464 2,900 46,663 10,429 7,786 1,070 4,025 3,975 1,345 12,115 393 2,477 907 899 886 4,361 883 1,070 4,049 42,885 0 14,000 17,000 17,981 557,201 2002 1,088 1,125 - 2003 7,995 8,449 1,214 628 - 2004 285 10,240 1,200 2,315 - 2005 3,023 2,239 6,250 693 1,944 - 2006 1,807 2,175 - 2007 2,014 8,903 11,848 5,122 - 2008 5,623 5,308 890 337 1,397 - 2009 2,202 819 1,125 903 - 2010 280 368 1,215 - 2011 640 2,095 - 2012 1,631 1,668 1,224 1,326 - 2013 2,469 512 - 2014 487 - 2015 1,077 761 18,238 - Total Remodel / New ASF 26,123 38,501 14,040 18,039 56,725 6,346 21,381 0 Remaining ASF 10,298 0 0 0 0 -1,224 7,836 5,116 692 - 14,723 - 15,869 1,075 - 316 - 625 - 29,179 - - 692 - 692 - 57 - 514 - - - 8,659 14,723 29,236 15,869 26,810 0 -57 1,968 279 393 3,577 33,009 10,000 39,909 8,175 10,429 5,729 2,666 42,223 7,786 1,230 13,314 3,861 2,114 0 34,487 96 42,830 5,049 7,025 10,941 17,000 37,521 1,445 108 824 5,804 46,663 - 1,605 1,070 2,063 8,233 - - 31,909 10,941 465 0 4,025 3,975 - Demo - 46,429 10,429 7,786 0 0 0 4,025 3,975 0 7,843 393 108 0 0 0 4,457 0 0 0 0 4,272 0 0 907 899 886 0 883 - 2,666 42,885 0 14,000 17,000 824 455,312 1,383 0 0 0 0 17,157 77,599 42,885 14,000 109,454 Assuming a twenty (20) year replacement cycle for institutional flooring, the summary above shows ~ 80,000 assignable square feet (ASF) of flooring eligible for replacement within the next twenty (20) years (4000 ASF per year) through college resources. 4,000 ASF at current average replacement costs of $6.50 per square foot requires an expenditure of $26,000 annually. 2 Campus Tab Arm Chair Replacement Summary Tab Arm Chair Replacement Schedule Room # PAC130 PAC104 PAC105 PAC120 PAC125 PAC124 B107 B140 B141 B143 B145 B203 B222 B223 B225 B236 B237 B238 B239 B240 CDC208 COS108 LAC122 LAC132 LAC133 RHS171 RHS172 RHS173 RHS174 RHS175 RHS176 RHS208 RHS220 RHS221 RHS222 RHS228 RHS229 RHS263 RHS269 RHS270 RHS271 RHS273 RHS307 RHS312 RHS331 RHS332 RN208 RN220 RN228 RN229 RN264 RN267 SG206 SG234 T03-1 T04-1 T10 TEC105 TEC110 TEC206 Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Classroom Total # Classrooms in ASF each Building 595 AUD - 7 572 732 558 602 486 936 BUS-14 436 556 774 531 1156 1105 976 978 693 458 458 458 693 630 CDC -1 808 C0S -1 1062 LAC-3 580 612 595 RHS - 21 595 595 595 595 588 548 660 492 549 485 654 701 497 393 611 480 455 585 872 600 551 RHN - 6 650 475 647 825 785 658 SOG - 2 692 861 T03 - 1 907 T04 - 1 918 T10 - 1 616 TEC - 3 759 589 78 Classrooms in replacement pool 6 14 1 1 3 21 6 2 1 1 1 3 60 Age 3 3 3 3 3 3 6 6 3 3 3 7 8 3 6 3 3 3 3 3 9 5 4 4 6 3 3 3 3 3 6 3 3 3 3 3 3 3 6 6 6 6 3 3 7 7 3 3 3 3 3 3 3 3 6 6 6 7 7 7 255 Classroom Replacements per year 4.25 Average Replacement Age 14.12 a/o 11/03/14 3 With a goal of a twenty (14) year (or less) replacement cycle for institutional tab arm chairs, the summary above shows approximately three (4) classrooms require replacement each year through college CDF resources to reach the desired replacement schedule. Three classrooms with an average of 33 chairs each at current average replacement costs of $200.00 per chair require an expenditure of $26,400 annually. Campus ADA Infrastructure Repair Summary Remediation of all campus ADA Transition Plan repairs is beyond the ability of the campus to fund through internal resources and requires District Facility Management oversight and funding. Minor ADA infrastructure repairs within the ability of the campus to complete require an expenditure of $20,000 annually. MEASURES OF MERIT: An analysis of on campus floor space is reviewed continuously. The analysis considers floor space scheduled for replacement during major project improvements to include modernization or new construction. In addition, consideration will be given to planned projects to remediate HAZMAT, ADA transitions and/or other repair and remodel projects. Other floor space will be scheduled as a function of this analysis and through the facilities portion of the unit planning process. Worksheets will be reviewed by Operations and the Campus Development Committee (CDC). The objective floor space to be worked each year is approximately 4,000 ASF. TOTAL RESOURCE REQUIREMENTS: $72,400.00 annually. (See Individual Program Summaries) DATE: December 30, 2008 September 13, 2009 October 20, 2010 November 07, 2011 November 14, 2012 November 11, 2013 November 03, 2014 REVIEW CYCLE: Annual 4