Sacramento City College Strategic Planning System

advertisement

Sacramento City College

Strategic Planning System

Title:

Plan Type:

OPR:

Planning Year:

Media Productions & Services, 2015-16

Program Plan

Learning Resources Division

Collaborative

Group(s): Facilities, Outreach Centers, Ed & IT Committee

Reference Documents: College Goals - Sacramento City College

Distance Education Program Plan

Departmental Unit Plans

2015-16

SECTION I: Overview & Strategic Information

A. PROGRAM DESCRIPTION & PURPOSE

Media Production & Services supports a broad base of college activities and manages related resources in three main areas:

1.

2.

3.

Campus technology support, non-computer/network (College Goal B5)

Campus event support (College Goals A1, B3, B5)

Media production, support and delivery (College Goals A5, B1, B3, B5)

Both media production and classroom technology support are linked through classroom technology use and distance education to student learning outcomes, college strategic goals, and effective delivery of college programs and services. Campus events, which include both faculty/staff professional development activities as well as student events, also contribute to college strategic goals and effective delivery of college programs and services.

Under campus technology support, the Media Production & Services unit engages in two major projects each year: first, the unit replaces aging LCD projectors and some associated smart classroom equipment each fiscal year, with purchasing in late summer/early fall and installation throughout the school year. Second, the unit installs new smart rooms on campus each year based on a master list of classrooms that is prioritized every 2-3 years as campus conditions and needs change; purchasing of equipment for new classrooms takes place each spring semester, with most installation taking place between the end of spring semester and the start of summer classes. In addition, techs in the unit answer A/V trouble calls as needed, year round, Monday through Friday.

1

To support campus events , techs in the unit keep a yearly schedule of all events that require A/V support, and also assist with repair, maintenance, and purchase of A/V equipment permanently installed in campus event facilities as well as A/V equipment for circulation (which is often used for campus events). A/V equipment for circulation and facility based event equipment is replaced on no fixed schedule; instead resource requests are included in a particular year’s program plan if and when needed, as equipment becomes obsolete or wears out.

To manage media production, support and delivery requires management of staff time and availability of production facilities, management of physical and virtual resources used for media hosting and distribution, and maintenance, replacement and modernization of production equipment. Equipment upgrade and replacement must take place during low demand times, typically during summer or winter breaks.

B. ENVIRONMENTAL SCAN

1. Campus Technology Support a. High Definition Video.

Currently, the most significant factor related to classroom technology at SCC is the increasing prevalence and affordability of high definition video for computers, video playback devices and projectors. As a consumer technology, 1080p high definition video (corresponding to a computer resolution of WUXGA) has been the de facto standard for some time, but cost effectiveness to implement technology on an institutional basis typically lags consumer adoption. At the time of this writing (Fall, 2014), the campus standard for new projectors remains 720p (or WXGA), but before new and replacement projectors are installed, departments are given the option to cover the cost difference to upgrade to 1080p/WUXGA projectors on a room by room basis. b. Tablets and wireless devices.

With the increase in tablets and other wireless devices on the market, more and more faculty members have their own tablets that they would like to use in SCC classrooms.

While most tablets can be connected to standard smart classrooms similarly to a conventional laptop, using an inexpensive cable, the strength of these devices is their wireless capability, and users are beginning to ask for wireless connection of tablets in smart classrooms. Unfortunately, there is no consistent standard among devices, and there are trade-offs in cost and usability among methods to implement wireless connection. At this point, adding wireless capability for iPads or other tablets in smart classrooms is being handled for individual rooms by request, with funds sourced by the requesting department. c. Obsolescence of VHS format and VCRs.

Though some consumers may still have VCRs in their homes, the VHS videotape and VCR has been effectively obsolete for a number of years. Keeping an obsolete consumer technology functional in an institutional environment is increasingly difficult, especially since few manufacturers still make VCRs, and even worse, most of the tapes in SCC collections are deteriorating, leading to equipment problems when played. Unfortunately, many of the programs

SCC owns on videotape are not available on DVD, and the law permits creation of digital copies of copyrighted programs only in very limited circumstances. As of the most recent purchase of DVD/VCRs, for 2012-13 classroom upgrades, only one brand of DVD/VCRs was still readily available and the available machines were not high quality. We have purchased some of these, and also try to reuse downstreamed higher quality DVD/VCRs when they become available, but either way, there will come a time when support for VHS is no longer practical.

2

d. Decreasing standardization campus wide.

As indicated by factors 1a. and 1b., a growing number of classrooms now have high definition capability, and it is likely that in the near future certain rooms will be customized for wireless tablet use. In addition, new facilities in the PAC and Hughes Stadium, and facilities currently being built for Electronics, Photography, Math and Anthropology also have more complex, non-standard A/V systems. With more and more custom and non-standard configurations, general maintenance and trouble calls become more difficult and complex to manage campus-wide, and the yearly upgrade cycle will become both more difficult to manage and more expensive.

2. Event Support a. Campus website & online event support request procedure.

Currently, event support requests may be submitted via email, on paper forms, or by appointment, and there are different procedures for different type of events. In order to clarify and simplify event support requests for end users, during 2013-14,

Media Productions & Services created an online submission process so that end users can submit requests from any computer on the Internet, at any time. This form went live as part of an update to the

Media Production & Services website prior to Fall 2014 and is currently active as an optional method to make requests, alongside the prior methods listed above. b. PAC events.

New event venues in the PAC have state-of-the-art equipment, but since the systems are extremely configurable and require significant specialized knowledge to operate, most events are impractical in the PAC without expert staff present. Media Services techs are not necessarily expert in the operation of all of the systems in the PAC, and more importantly, the entire Media Services unit is needed to fully staff the PAC. This means that full-service events in the PAC can only be handled by Media

Services when the unit is not needed to provide other support on campus, which is generally limited to

Fall and Spring Convocation. Even so, the Media Services unit has frequently been called upon to assist users unfamiliar with the systems in the PAC for both campus use and for rentals, with a significant impact in terms of staff time. In addition, as described in item 1c above, the complex and unique systems in the PAC add considerably to the challenge and cost of keeping campus technology in good repair. Upgrade/repair of systems in the PAC will likely require specialized resource requests through this program plan.

3. Distance Education Support & Digital Media Production a. Web based media.

Watching video on the web has become a popular form of entertainment, and as the technology to deliver video and audio over the Internet has improved and become more affordable, web based media has also been heavily adopted by colleges for distance education and to deliver supplemental material for face-to-face courses. As documented in past program plans, SCC has been delivering course materials over the web since Fall 2006, starting with web-based versions of Interactive Television (ITV) courses that had previously only been available to view as local cable TV broadcasts. The popularity of web based video with students quickly surpassed cable broadcasts to the point that the ITV format was phased out at SCC as of the end of Spring 2013, mainly to improve availability of staff and facilities to offer digital media production and related support more widely to SCC faculty. Current challenges include changing web standards for video and audio and implementation of closed captioning for web-based video and live video streams.

3

b. Demand for varied media support.

As touched on in 3a, demand from SCC faculty to support rich media for online courses and to supplement face-to-face instruction has not necessarily declined with the phase-out of the ITV format; in fact, the demand for more varied types of media support was a primary reason to stop offering ITV courses. At the end of Fall 2013, SCC’s Chief Broadcast Engineer retired and the position was not replaced. In response, in Spring of 2014, the existing AV Tech I handling media support for Distance Education was reclassified as an AV Tech II and was fully reassigned to the

Media Services unit. With only one primary staff member handling video production and support, larger projects in particular are more difficult to produce, but with media production and support consolidated in one area, the unit remains fairly flexible in terms of the variety of services it can offer.

C. MULTI-YEAR DIRECTIONS OR STRATEGIES

1.

LCD Projector / Smart Room Upgrade Cycle.

(College Goal B5)

Initially the target for the LCD projector upgrade cycle was to replace all projectors after 5 years of service, but the budget conditions when the cycle was initiated led to slippage, and we ended up replacing most projectors at ~8 years of service. For 2013-14, funds were provided to upgrade the equivalent of two years’ projectors at once. The 2013-14 double upgrade has been completed, and after completion of the 2014-15 upgrades currently in progress, all mounted projectors at SCC will be Panasonic models that have proven to be much more reliable than previous brands. At that point, the oldest LCD projectors in service at SCC will still be ~7 years old, but even so, the campus will finally be in a reasonably stable situation with respect to premature failure of projectors. For 2015-16 and onward, replacement is still important to keep ahead of technical obsolescence, but for the first time, some of the projectors being replaced may still be in good enough condition to be cascaded into areas with less stringent technical needs.

Moving forward, we will also be doing upgrades for years when many more projectors were originally installed, so the yearly cost of the upgrade cycle will definitely increase. In addition, as digital projection has improved, it has being more heavily adopted by disciplines that have clearly demonstrated special needs in terms of image quality. In a similar fashion to the way the computer upgrade cycle is handled by IT (with computers upgraded more frequently for disciplines with higher technological requirements), projectors with higher image quality will need to be purchased for Graphic Communication, Fine Arts, Photography, and Theatre Arts and Film as a minimum. This will further increase the overall cost of the upgrade cycle.

2.

New smart room plan.

(College Goal B5)

A question often asked regarding new smart room installations is how close SCC is to being “fully smart,” meaning: when will all rooms that can be made into smart classrooms, be made into smart classrooms? As of this writing, there are approximately 45 rooms remaining on campus that would make reasonable smart rooms. For 2014-15, funding for six rooms was requested, and funding for four rooms was awarded. Some of the rooms being made into smart rooms are labs in Lillard and Mohr halls in which the standard smart room setup will not fit, so a medium-term solution specifically designed for the limited space in these labs is being developed as part of the 2014-15 process. As a result of these limitations, the labs will likely have a lower cost than a standard smart room, which may allow us to install 5-6 rooms total, rather than only 4, leaving about 40 rooms after 2014-15 projects are completed.

As further rooms are installed and new building projects take place, there will come a time, probably within ~5 years, when the SCC campus is essentially “fully smart.”

4

3.

Adoption of new classroom technology when appropriate for SCC.

(College Goal B5)

To reference back to some of the environmental factors under “Classroom Technology” (above), within the next 2-3 years, it will become appropriate to update the standard smart classroom configuration for typical new rooms on campus, incorporating high definition/1080p projection, one or more high definition connections between the projector and teaching station, and possibly wireless connection for one or more chosen tablets. While a standard configuration may not be appropriate for every room on campus, developing a new standard for most rooms will help to preserve some of the benefits of past standardization, while also offering newer technology to a broad range of campus users as it becomes cost-effective to implement widely.

As a first step, a discussion of new standards for smart rooms will begin in the EIT committee during the

2014-15 year, although it may not be possible or cost effective to have an updated standard ready to implement for the 2015-16 year.

4.

Web based video delivery.

(College Goals A5, B1, B3, B5)

The Los Rios Community College District maintains a district-wide Adobe Flash video server for live streaming video as well as to host archived Flash video files for online viewing. Since Apple’s mobile devices don’t support Flash, SCC also has a smaller video server on campus that has been used to offer

Quicktime-compatible video files as a download for iPhone, iPod and iPad users. As a long-term planning item, SCC will need to stay on top of changes in web based video delivery standards over the next

2-3 years and beyond. One challenge is the need to offer captions or subtitles on web-based video, for which there is not yet a universal standard, which can be expensive and which can require significant turn-around time. Another factor to plan for is the coming HTML 5 internet standard, which is scheduled to be completed at the end of 2014, and incorporates new standards for web-based video delivery.

During 2014-15, a pilot has been proposed with IT, Distance Education and Instructional Development to explore video hosting and delivery methods and to implement one or more type(s) of captioning for

SCC’s web-based videos.

5.

Media collection server.

(College Goals A5, B1, B5)

Currently some of the SCC Instructional Media collection of VHS tapes and DVDs are available for circulation, while some may not circulate, and must be viewed at viewing stations in the LRC. Also, as mentioned in environmental factor 1c above, much of the VHS media is in poor shape, and it is increasingly difficult to keep VCRs on campus functional. In addition to VCRs, the infrastructure for the viewing stations in the LRC is obsolete, leading to ongoing maintenance issues. A combined solution to many of these problems is to implement a server-based digital storage system and viewing system for the SCC media collection that complies with copyright law as laid out in the TEACH Act. Implementing a system of this type is a significant challenge, and at this point we are only at the information gathering stage. Ultimately, if it is determined to be feasible and can be put together for SCC in a costeffective way, it is definitely a project that should be considered during the next 2-3 years. This potential future use of the more general video server(s) mentioned in the pilot project described in 4 (above) is definitely part of that discussion, but actually developing a media collection server is beyond the scope of that project.

5

SECTION II: Operational Review and Plan

A: REVIEW OF ACCOMPLISHMENT OF THE PREVIOUS YEAR’S WORK (2013-14 Plan)

Objective/Procedure/Task Expected

Outcome

Results/Progress

1. LCD Projector / Smart

Room Upgrade/Renewal

Upgrade RHS-261,

RHS-262, RHS-263,

RHS-273, Temp 3-1,

BUS-151, BUS-219,

Fully upgraded RHS-261, RHS-262, RHS-263,

RHS-273, Temp 3-1, BUS-151, BUS-219, SOG-

144, CDC-208, TECH-101, TECH-102, TECH-

103, TECH-105, TECH-110, TECH-200, TECH-

2. New Classroom Technology

Installation

SOG-144, CDC-208,

TEC-101, TEC-102,

TEC-103, TEC-105,

TEC-110, TEC-200,

TEC-206, COS-105,

COS-108 by the end of 2013-14

Install 3 new smart classrooms on campus by end of 2013-

14, based on prioritized list

206, COS-105, COS-108; also completed upgrades in TECH-100, COSM-110 (both started at division expense, out of cycle). All upgrades completed before the start of Fall 2014 semester.

Installed new smart rooms in LIL-101, LUC-132,

RHS-312, also new multimedia rooms in PAC-115 and PAC-116 plus unit plan funded modifications to smart rooms in RHS-110 and DAC-119.

3. Troubleshooting, maintenance, repair of all audio and video systems on campus

4. Implement web-based event support procedures

Answer trouble calls

8:00 AM – 6:30 PM

Mon-Fri; 8:00 AM –

4:30 PM Saturdays

Trial web-based form in use for Fall 2013, with any necessary changes incorporated for Spring 2014

5. Campus AV circulation equipment a) Purchase 6 cameras for IM circulation counter b) Purchase portable classroom PA system

6. Campus event equipment Purchase smaller sound system appropriate for ASG / Spirit Squad use on Quad

7. Manage staffing changes in

Broadcast & Media Production

Replacement of

Chief Broadcast Engineer upon retirement

For Fall 2013, hours were maintained as expected, but as of Spring 2014, Saturday hours were discontinued due to ripple effect of retirement/nonreplacement of Chief Broadcast Engineer.

New SCC website roll-out delayed implementation of web-based event form to start of Fall 2014. Trial version of form is currently active in parallel with other event support request procedures. a) 4 cameras purchased and put into service for

Fall 2014 b) Not purchased; appropriate portable PA system was discontinued by time of plan execution and a cost-effective alternative could not be found

Appropriate smaller sound system was purchased by ASG before plan was executed; in consultation with VPA office, funds awarded for Procedure 6 were instead used for basic upgrade of Student

Center installed sound system; initial install of this equipment was completed in late October, 2014.

Position was not replaced. 10 month AV Tech I was extended and reclassified to 12 month AV

Tech II.

6

B: PROGRAM OBJECTIVES AND OUTCOMES FOR THE PLANNING YEAR

Objective 1: Upgrade AV equipment in 14 classrooms at SCC, 1 emergency upgrade and 1 smart cart

Upgrades are typically purchased early in the fiscal year and installed through Fall, Winter and into

Spring semester as class schedules permit

See Appendix A for list of rooms proposed for upgrade in 2015-16

See Appendix C for current equipment lists for smart/multimedia room and smart cart upgrades

Objective 1 Outcomes:

All classroom upgrades will be complete and functional by the end of the fiscal year

If no classroom has an emergency failure during the year, emergency upgrade equipment is installed in the next appropriate room further down the upgrade cycle list before the end of the fiscal year

Objective 2: Install 6 new smart classrooms at SCC:

The six new smart classrooms may include a combination of known rooms that have been prioritized at the top of the non-smart room list and/or rooms not yet identified that could be added to the list as part of facilities remodel or other campus projects

New smart classroom equipment is typically purchased in spring semester and installed through late spring and summer

Objective 2 Outcomes:

All smart rooms installed and in-use for instruction by the end of the fiscal year

Objective 3: Purchase/upgrade audio and video equipment for campus-wide use in specified facilities:

A.

AV equipment for the Student Center: Recently, a small amount of funding from the 2013-14 Media Services Program Plan was used to replace non-functional components of the audio system in the

Student Center; at the same time other elements of the system were reconfigured to improve its capabilities. The proposed equipment list for 2015-16 will follow up the sound system upgrade with a new screen, LCD projector, DVD/Bluray player and control system to greatly improve the space for presentations that require both video and audio support. This equipment would be useful for the wide variety of campus events held in the Student Center. (Please see Appendix C, Objective 3A for detailed equipment costs.)

B.

Large portable screen for event use: Currently the 10’ portable screen typically used for large events in spaces without mounted screens is in poor shape, and is basically unsafe to use for events where AV staff will not be continually present. Permanently installing a screen in the Student Center as described in A. (above) will eliminate the majority of the need for a screen of this size and greatly simplify event setup, but a few events remain each year in spaces other than the Student Center that may call for a large portable screen. (Please see Appendix C, Objective 3B for detailed equipment costs.)

C.

Equipment for Hughes Stadium: The purpose of the proposed equipment to be purchased and installed in Hughes Stadium is to address issues with the wireless microphone antenna system which, as designed, does not allow for active use across the full span of the field. The most immediate need for the improved antenna system is for use by the athletics program at SCC, but it will also be useful for renters of the stadium and possibly for other campus users. (Please see Appendix C, Objective 3C for detailed equipment costs.)

D.

Equipment for PAC: The purpose of the proposed equipment to be purchased and installed in the

PAC Main Stage is to address some shortcomings of the audiovisual system as installed. Proposed are 1) a switcher/scaler that will help overcome cable limitations that make it difficult to use a com-

7

puter on stage with the projector in the lighting booth and 2) a set of four microphones permanently installed that will make it possible to deliver an audio feed to the lobby, dressing rooms, and costume shop without use of the main mixing system in the sound booth. Both items will be useful for instruction, for campus events held in the PAC, and by renters. (Please see Appendix C, Objective 3D for detailed equipment costs.)

Objective 3 Outcomes:

Equipment/technology meeting the needs described above is purchased and integrated into each facility in coordination with Facilities Office and/or other appropriate campus units in time to meet scheduled uses of these facilities throughout the year

Objective 4: Coordinate with and support audiovisual aspects of objectives in other program plans:

A.

Modify AV setup(s) in LRC-119 and LRC-120 to address multiple needs in the LTAT department

(LTAT Unit Plan: LTAT10, Distance Education Program Plan: Objective 4a) a.

LRC-119 has minimal or no new AV needs to be used for online tutoring; if desirable, legacy

AV equipment from ITV program will be removed as needed to free up space for tutoring b.

LRC-120 to be modified using resources requested in the DE Program Plan for use as a small classroom and workshop space with self-service media capture and web streaming capabilities

B.

Coordinate with and support media needs for SCC 100 th

Anniversary Celebration (Marketing Program Plan: Objective 5, Procedure 5a)

C.

Provide AV support to ongoing upgrade of the screens and video cabling for the campus Axis TV digital signage system (Marketing Program Plan: Objective 1, Procedure 1b)

D.

Participate in discussion, assessment and any proposed pilot program, both at SCC and district-wide, involving appropriate solution(s) for hosting/delivery of web-based video, particularly to address accessibility concerns such as captioning for online video (IT Program Plan: Video Media / ITIP-09)

Objective 4 Outcomes:

Within the limits of existing project schedules and staffing, provide input and expertise, equipment purchasing support, and installation/configuration as needed to meet objectives in the referenced program plans

8

C. PROCEDURES AND RESOURCE REQUIREMENTS FOR THE PLANNING YEAR:

Media Productions & Services 2015-16

Objective Procedure Timeline Responsible persons

Resource Requirements none 1.Smart Classroom Upgrade

Cycle

2. New Smart

Classroom Installation

3. Campus-wide

AV equipment needs in Hughes,

PAC, Student

Center

Procedure 1a: update list of rooms for upgrade & determine whether any will be high definition

Procedure 1b: purchase equipment for upgrades

Procedure 1c: submit work orders for new screens

Procedure 1d: install upgrades

Procedure 2a: make a site visit to each room with the appropriate Dean and/or faculty who work in the area

Procedure 2b: purchase equipment for new smart rooms

Procedure 2c: submit work orders for new electrical, projector mounts and screens

Procedure 2d: install classrooms

Procedure 3a: Work with

Facilities Office and/or other appropriate department to schedule installation for each item that has been funded

Procedure 3b: Purchase appropriate new equipment

Summer 2015 (as early in the fiscal year as possible)

Summer to early Fall

2015

Once equipment purchasing is complete

Media Resources

Supervisor (Alex

Adan); Division

Deans

Media Resources

Supervisor (Alex

Adan)

Media Resources

Supervisor (Alex

Adan)

Throughout year, starting once new equipment has arrived

Early Fall 2015 (once

Deans & faculty are on campus & past start of semester)

AV Tech II (Mitch

Sakaishi) w/ AV

Tech I (Michie

Montgomery)

Media Resources

Supervisor (Alex

Adan); Division

Deans

Early Spring 2016 Media Resources

Supervisor (Alex

Adan)

Once equipment purchasing is complete

Spring Break at the earliest; otherwise, through Spring based on room availability; largely during Spring to Summer break

Summer 2015 (start of fiscal year) and ongoing through year, based on install timeframes

As soon as need is identified, in time for specific project if necessary

Media Resources

Supervisor (Alex

Adan)

AV Tech II (Mitch

Sakaishi) w/ AV

Tech I (Michie

Montgomery) as necessary

Media Resources

Supervisor (Alex

Adan)

Media Resources

Supervisor (Alex

Adan)

See Appendix

A: $55,813 none none none

6 smart rooms

@ $11,360:

$68,160 none none none

See Appendix

B: $13,521 (or a lesser amount if any of A/B/C/D are not funded) none Procedure 3c: Install new equipment or prepare it for field use

In time for specific project(s)/event(s) if possible, or when other project schedule permits

Media Resources

Supervisor (Alex

Adan) w/ AV Techs

Funding

Source(s) none

Program Plan none none none

Program Plan none none none

Program Plan none

9

C. PROCEDURES AND RESOURCE REQUIREMENTS FOR THE PLANNING YEAR (cont.):

4. Support Objectives in other program plans

Procedure 4a: Discuss design/planning of projects with faculty/staff in LTAT, IT, and Public Information Office

Procedure 4b: Assist with any equipment purchases as necessary/appropriate

Procedure 4c: Modify or install equipment and/or execute planned projects

Early in the year

(based on needs in other plans)

Based on needs of

LTAT faculty and

PIO and timeline of scheduled activitites

Based on needs of

LTAT faculty and

PIO, scheduled activitites, and constraints of other project schedules

Media Resources

Supervisor (Alex

Adan); LTAT faculty, Public Information Office

Media Resources

Supervisor (Alex

Adan); LTAT faculty, Public Information Office

Media Resources

Supervisor (Alex

Adan) w/ AV Techs none none none none none none

Grand

Total:

$137,494

10

APPENDIX A: Upgrade Room Lists, 2015-16

Upgrade Room List (also see Appendix C, below, for detailed equipment lists)

Smart Classroom Upgrades LRC-318, RHS-

172, RHS-222,

9 @ $4,351 $39,159

RHS-229, LUC-

122, LUC-133,

RHS-176, SOG-

206, SOG-234

(see itemized list in Appendix C, Objective

1.A)

Lab/Multimedia Room

Upgrades

Smart Cart Upgrades

BUS-104, LRC-

105, RHN-258,

BUS-153C,

RHS-326

For 1 cart, install as needed

5 @ $2,545

(see itemized list in Appendix C, Objective

1.B)

1 $1,384

(see itemized list in Appendix C, Objective

1.C)

$12,725

$1,384

Emergency Upgrades 1 $2,545

(see itemized list in Appendix C, Objective

1.B)

Total

APPENDIX B: Other Campus-wide AV Equipment, 2015-16

$55,813

Other Campus AV Equipment (also see Appendix C, below, for detailed equipment lists)

A. AV equipment for Student

Center

New installation of an LCD projector,

See itemized list in Appendix C,

$4,655 powered screen, and control system

Objective 3.A

B. Large portable screen for event use

Replacement large screen for special campus events

See itemized list in Appendix C,

Objective 3.B

$1,194

C. Hughes Stadium wireless microphone antenna system

D. PAC Main Stage audio & video distribution equipment

For 1 room, install as needed

Field level antenna system to improve wireless microphone reception

Video scaler to simplify stage computer use, plus permanently installed stage monitor microphones

See itemized list in Appendix C,

Objective 3.C

See itemized list in Appendix C,

Objective 3.D

$2,545

$5,122

$2,550

Total $13,521

11

APPENDIX C: Equipment Lists

Media Production & Services 2015-16 Program Plan Equipment Lists

Objective 1: LCD Projector & Smart Classroom Upgrade/Renewal Cycle

1A. Standard Smart Room Upgrade Equipment List, Per Room

Description

Panasonic Wide Format LCD Projector, PT-FW430U

Peerless LCD Projector mount, PSM-UNV

Projector security alarm, Sonic Shock 3

Da-Lite Model C 16:9 projection screen #36445

Da-Lite brackets for Model C screen, pair, #40957

JBL speakers with mounting brackets, Control 25

Funai DV220FX4 DVD/VCR

50' VGA Cable

50' DVI-I Cable

Single rack space audio amplifier, 100w/channel

Document Camera, high def

Qty Price Total

1 $1,650.00 $1,650.00

1 $145.00 $145.00

1 $95.00 $95.00

1 $425.00 $425.00

1 $30.00 $30.00

2 $165.00 $330.00

1 $100.00 $100.00

1 $35.00 $35.00

1 $225.00 $225.00

1 $275.00 $275.00

1 $700.00 $700.00

Subtotal

Tax

Total

$4,010.00

$340.85

$4,350.85

1B. Standard Multimedia Room Upgrade Equipment List, Per Room (also "Emergency Upgrade" list)

Description

Panasonic Wide Format LCD Projector, PT-FW430U

Peerless LCD Projector mount, PSM-UNV

Projector security alarm, Sonic Shock 3

Da-Lite Model C 16:9 projection screen #36445

Da-Lite brackets for Model C screen, pair, #40957

1C. Standard Smart Cart Upgrade Equipment List, Per Cart

Description

Hitachi 2700 lumens LCD projector CPX4015WN

Spare lamp for CPX4015WN

Funai DV220FX4 DVD/VCR

Qty Price Total

1 $1,650.00 $1,650.00

1 $145.00 $145.00

1 $95.00 $95.00

1 $425.00 $425.00

1 $30.00 $30.00

Subtotal

Tax

Total

$2,345.00

$199.33

$2,544.33

Qty Price Total

1 $900.00 $900.00

1 $275.00 $275.00

1 $100.00 $100.00

Subtotal

Tax

Total

$1,275.00

$108.38

$1,383.38

12

APPENDIX C: Equipment Lists, continued

Objective 2: New Smart Room Installation

Standard New Smart Classroom Equipment List, Per Room

Description

Panasonic Wide Format LCD Projector, PT-FW430U

Spare lamp for Panasonic PT-FW430U, LAF100A

Peerless LCD Projector mount, PSM-UNV

Projector security alarm, Sonic Shock 3

Da-Lite Model C 16:9 projection screen #36445

Da-Lite brackets for Model C screen, pair, #40957

SP Controls small chassis smart panel #SP2-SMCHAS

SP Controls audio follow video preamplifier #SP3-AFVP+

JBL speakers with mounting brackets, Control 25

Funai DV220FX4 DVD/VCR

50' VGA cable

50' DVI-I cable

6' DVI cable

Single rack space audio amplifier, 100w/channel

Middle Atlantic 3 RU storage drawer w/lock, D3LK

Furman rack mount power strip/line conditioner, PL-8C

Tripp-Lite power strip w/15' cord, PS-2408

Cal-Rad Wall plate w/VGA & audio connectors, 28-160

Document Camera, high def

HDMI over HD-SDI extender set

Windows desktop computer w/23" monitor

(note: price for touchscreen used as a "ceiling" cost)

Teaching station (RVPS small footprint or equivalent)

Qty Price Total

1 $1,650.00 $1,650.00

1 $325.00

1 $145.00

$325.00

$145.00

1 $95.00

1 $425.00

1 $30.00

1 $575.00

$95.00

$425.00

$30.00

$575.00

1 $445.00

2 $165.00

1 $100.00

1 $35.00

1 $225.00

2 $30.00

1 $275.00

1 $215.00

$445.00

$330.00

$100.00

$35.00

$225.00

$60.00

$275.00

$215.00

1 $165.00

1 $50.00

1 $25.00

1 $700.00

$165.00

$50.00

$25.00

$700.00

2 $300.00 $600.00

1 $1,025.00 $1,025.00

1 $2,975.00 $2,975.00

Subtotal $10,470.00

Tax $889.95

Total $11,359.95

13

APPENDIX C: Equipment Lists, continued

Objective 3: Campus Wide Equipment Needs

3A. Audiovisual Equipment for Student Center

Description

Da-lite powered screen, 72.5" x 116", #70192LS

Panasonic PT-CW330U short throw projector

Peerless projector mount

Projector security alarm, Sonic Shock 3

Bluray disc player

SP Controls switcher/scaler SP-6VA1S

SP Controls Pixie Pro modular control panel

SP Controls Pixie Pro rack mount plate

3B. Large Portable Screen for Event Use

Description

Da-lite 9' x 12' carpeted floor model C, black, # 93896

Da-lite stand for carpeted floor model C, # 78126

Freight charges (oversized item)

3C. Wireless microphone antennas for Hughes Stadium

Description

RF Venue RF + DC antenna distribution system

RF Venue Diversity Fin antenna

K & M tripod mic stands KM201AB (for antennas)

Times Microwave LMR-400, 1000'

Times Microwave TC-400-BM BNC connectors

Passive antenna combiners

Cavity tuned antenna filter, 650 MHz

14

Qty Price Total

1

1

1

1

1 $1,200.00 $1,200.00

1 $1,350.00 $1,350.00

1

1

$300.00

$90.00

$300.00

$90.00

$200.00

$750.00

$300.00

$100.00

Subtotal

$200.00

$750.00

$300.00

$100.00

$4,290.00

Tax

Total

$364.65

$4,654.65

Qty Price

1 $650.00

Total

$650.00

1 $350.00

1 $100.00

$350.00

$100.00

Subtotal $1,100.00

Tax $93.50

Total $1,193.50

Qty Price

1

2

$560.00

$400.00

Total

$560.00

$800.00

2 $60.00 $120.00

1 $1,100.00 $1,100.00

20

2

$12.00

$350.00

$240.00

$700.00

2 $600.00 $1,200.00

Subtotal

Tax

Total

$4,720.00

$401.20

$5,121.20

APPENDIX C: Equipment Lists, continued

3D. PAC Main Stage Audio & Video Distribution Equipment

Description

SP Controls RS-232 switcher/scaler

Blackmagic HDMI to HD-SDI miniconverter

Audio Technica shotgun microphone

DATE: November 14, 2014

December 18, 2009 (original plan)

REVIEW CYCLE: Annual

Qty Price

1 $750.00

2 $300.00

4 $250.00

Subtotal

Tax

Total

Total

$750.00

$600.00

$1,000.00

$2,350.00

$199.75

$2,549.75

15