POM assgn : Senthil Multiple Choice Multiple Answer Question

advertisement
POM assgn : Senthil
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality of purchased items?
Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that
suppliers understand the requirements
Your Answer
Defining right quality for the job , Vendor performance evaluation , Making sure that
suppliers understand the requirements
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Correct Answer Unexpected
Your Answer
Unexpected
True/False
Question
After goods have been manufactured, route sheets and operation layouts should not be
collected back.
Correct Answer False
Your Answer
False
True/False
Question
In case of centralised inspection, inspection rooms generally become bottleneck and
cause delay in taking action regarding rejection or rework.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer Factory
Your Answer
Factory
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer
Question
Which of the following is the criteria for the percentage defectives in the zone of the
indecision?
Correct Answer Lots having the percentage defective more than AQL but less than LPTD
Your Answer
Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during recording for method study?
Correct Answer Brazing , Welding , Riveting
Your Answer
Brazing , Welding , Riveting
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal
to or better than AQL .
Correct Answer Rectangular
Your Answer
Rectangular
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the production schedule in
a factory?
Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Multiple Choice Multiple Answer
Question
Which of the following situations demand the economic consideration while selecting a
job for method study?
Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many
suggestions received for improvement from a department or section
Your Answer
Unorderly movement of men and materials , Excessive process defectives , Inconsistent
quality
True/False
Question
During set up of X bar-R control chart, control limts should be practically revised from
time to time as additional data is accumulated.
Correct Answer True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
Match The Following
Question
Correct Answer
Your Answer
Toung
Sweet
Sweet
Eye
Crack
Crack
Nose
Burnout
Burnout
Ear
Impact
Roughness
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer
Acceptable quality level
True/False
Question
Floor inspection delays the identification of faults which can not be rectified immediately
before large lots are spoiled.
Correct Answer False
Your Answer
True/False
Question
False
Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
The document which incorporates details of process planning for a job is called
Correct Answer Route Sheet
Your Answer
Route Sheet
True/False
Question
Repetitive movements between work stations which are difficult to be traced on string
diagrams can be conveniently shown on flow diagrams.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer
PERT & CPM
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer Breakdown
Your Answer
Breakdown
Multiple Choice Single Answer
Question
What is the relation between duration of an activity and length of an arrow?
Correct Answer No relation
Your Answer
No relation
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer Tight
Your Answer
Tight
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Multiple Choice Single Answer
Question
Which of the following techniques is used by industrial engineering department to obtain
the utilisation index?
Correct Answer Work Sampling Studies
Your Answer
Break Even Analysis
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a
particular site from legislation and taxation point of view?
Correct Answer Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Building codes , Policies regarding issue of licences
Multiple Choice Multiple Answer
Question
Which of the following cases can be referred as operation in method study recording?
Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical
characteristic
Your Answer
Change in physical characteristic , Consumption of physical effort , Movement of
material
True/False
Question
An activity can share the same tail event and same head event with any other activity.
Correct Answer False
Your Answer
True
Select The Blank
Question
The ________ must ensure that the product satisfy the functional requirements of it's
usage.
Correct Answer Quality of design
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Woolen
Select The Blank
Question
The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.
Correct Answer Specifications
Your Answer
Specifications
Multiple Choice Single Answer
Question
Site factors for plant location include
Correct Answer Suitability of land
Your Answer
Suitability of land
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following defects can be observed during preventive inspection by using
human senses?
Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Your Answer
Deviation from normal sound , Excessive Vibration , Leakage of a gas
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified
through inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer
Working Maintenance
True/False
Question
Independent float either affects the float of preceding activities or that of succeeding
activities.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer
True/False
Question
Over ordering , under ordering , stockouts
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
Correct Answer False
Your Answer
False
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
Time and Motion
Match The Following
Question
Correct Answer
Your Answer
Factor Analysis
Method to evaluate layouts
Technique for evolving and analysis
of layouts
Minimization of production delays Objective of good layout
Objective of good layout
Maximum visibility
Principles of good layout
Principles of good layout
Scale model
Layout analysis
Method to evaluate layouts
Multiple Choice Single Answer
Question
Following is one of the techniques used for Material Planning for high value material
Correct Answer MRP
Your Answer
MRP
Multiple Choice Single Answer
Question
What do you understand by totality of features and characteristics of a product or
service that bears on it's ability to satisfy the customer?
Correct Answer Quality
Your Answer
Quality
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer
Worker