Question Which of the following technique makes three time estimates for each activity?

Correct Answer Project Evaluation & Review Technique

Your Answer Project Evaluation & Review Technique

True/False

Question Mixed layouts are generally used in case of product is to be produced in different sizes/types: contains too many components

Correct Answer True

Your Answer True

True/False

Question In case of two handed process chart, storage symbol is used when either hand is used as grip or vice to hold an object.

Correct Answer True

Your Answer True

Match The Following

Question Correct Answer Your Answer

Fixation of inventory level Reorder level Reorder level

Symptom of ill planned purchasing Over ordering Over ordering

Factor influencing material planning Lead time Lead time

Net requirement of material under MRP Stock on hand Stock on hand

Multiple Choice Multiple Answer

Question Following are the commonly used factors considered for evaluation of layout in factor analysis method

Correct Answer Flow of material , Equipment utilization , Working condition

Your Answer Flow of material , Equipment utilization , Working condition

Multiple Choice Multiple Answer

Question Which of the following are examples of pure materials?

Correct Answer Bakeries , Ice factories , Woolen

Your Answer Bakeries , Ice factories , Woolen

Multiple Choice Multiple Answer

Question Which of the following factors decide the choice between the cent percent and sampling inspection?

Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating

Your Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating

Multiple Choice Single Answer

Question What do you mean by planned corrective manitenance which provides an opportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns.

Correct Answer Design-out Maintenance

Your Answer Design-out Maintenance

Multiple Choice Single Answer

Question The product layout has following disadvantage

Correct Answer Layout is not flexible

Your Answer Layout is not flexible

Multiple Choice Multiple Answer

Question Which utilities are considered as infrastructural requirements?

Correct Answer Disposal of waste , Power , Water

Your Answer Disposal of waste , Power , Water

Multiple Choice Multiple Answer

Question Which are the factors on which the structure of the transportation cost depends?

Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment

Your Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment

Multiple Choice Multiple Answer

Question Which are the three basic types of control chart by attribute?

Correct Answer p-chart , c-chart , np-chart

Your Answer p-chart , c-chart , np-chart

True/False

Question It would not affect the project completion time if non-critical activities take little loner time than planned.

Correct Answer True

Your Answer True

Multiple Choice Single Answer

Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by

Correct Answer Proportion of Cubic volume space utilized

Your Answer Proportion of Cubic volume space utilized

Multiple Choice Single Answer

Question Process planning is the process of

Correct Answer establishing shortest and most economic path of production

Your Answer establishing shortest and most economic path of production

Multiple Choice Single Answer

Question Who prepares the daily production report?

Correct Answer Shop Supervisor

Your Answer Shop Supervisor

Multiple Choice Multiple Answer

Question Which of the following are examples of gross materials?

Correct Answer Timber , Iron ore , Sugar cane

Your Answer Timber , Iron ore , Sugar cane

Multiple Choice Multiple Answer

Question Which of the following defects can be observed during preventive inspection by using human senses?

Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas

Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas

Multiple Choice Multiple Answer

Question Which of the following are the objectives of a good maintenance system?

Correct Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability

Your Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability

Select The Blank

Question Production control work is ________ in case of floor inspection as compared with the centralised inspection.

Correct Answer easier

Your Answer easier

Select The Blank

Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.

Correct Answer Overtime working

Your Answer Overtime working

True/False

Question Latest starting date is the latest finishing time minus activity duration.

Correct Answer True

Your Answer True

Select The Blank

Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.

Correct Answer 0.01 to 10%

Your Answer 0.01 to 10%

Select The Blank

Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive

Correct Answer Preventive Maintenance

Your Answer Preventive Maintenance

Select The Blank

Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions.

Correct Answer Unexpected

Your Answer Unexpected

Select The Blank

Question The term ________ emplies the foregone profit due to inability of company to produce.

Correct Answer Opportunity cost

Your Answer Opportunity cost

Multiple Choice Single Answer

Question Process type layout is suitable when

Correct Answer there is wide variation in processing time of operations

Your Answer there is wide variation in processing time of operations

Select The Blank

Question The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies.

Correct Answer Reconditioning

Your Answer Reconditioning

True/False

Question One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities.

Correct Answer False

Your Answer False

True/False

Question Kanban system is essentially a computer based system for production scheduling and control

Correct Answer False

Your Answer False

Select The Blank

Question The ________ is the defect level for which lots are regarded as bad lots.

Correct Answer Lot Tolerance Percentage Defective

Your Answer Lot Tolerance Percentage Defective

Multiple Choice Single Answer

Question How dummy activities are shown in the time chart during project scheduling?

Correct Answer Vertical lines

Your Answer Dotted lines

Match The Following

Question Correct Answer Your Answer

Factor Analysis Method to evaluate layouts Method to evaluate layouts

Minimization of production delays Objective of good layout Objective of good layout

Maximum visibility Principles of good layout Principles of good layout

Scale model Layout analysis Layout analysis

Multiple Choice Multiple Answer

Question In an organization there may not be a formal PPC department if

Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,

Number of workmen is not very large

Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,

Number of workmen is not very large

Multiple Choice Multiple Answer

Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart?

Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt

Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt

True/False

Question A network should employ only those dummy activities which are absolutely necessary.

Correct Answer True

Your Answer True

Select The Blank

Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines.

Correct Answer Shutdown Maintenance

Your Answer Shutdown Maintenance

Multiple Choice Single Answer

Question What do you understand by identification of defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives?

Correct Answer Preventive function

Your Answer Preventive function

Select The Blank

Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________.

Correct Answer One

Your Answer One

Select The Blank

Question A set of activities to keep an equipment in the specified condition is called as ________.

Correct Answer Maintenance

Your Answer Maintenance

Multiple Choice Single Answer

Question One of the external factors influencing Material Planning is

Correct Answer Price trends

Your Answer Price trends

Multiple Choice Multiple Answer

Question What is indicated by the erratic pattern points falling above and below the control limits in the

Xbar-R-control chart?

Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines

Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines

True/False

Question Inspection should be conducted prior to an operaion, after whose completion no rework whatsoever is possible.

Correct Answer True

Your Answer True

Multiple Choice Single Answer

Question What do you mean by CPM?

Correct Answer Critical Path Method

Your Answer Critical Path Method

True/False

Question Planned lubrication is said to be the nervous system of the equipment.

Correct Answer True

Your Answer True

True/False

Question In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.

Correct Answer True

Your Answer True

Multiple Choice Single Answer

Question Provision of drainage facilities is important for the following type of industry

Correct Answer Chemical Process

Your Answer Chemical Process