POM assgn : Sushant
True/False
Question
Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality of purchased items?
Correct Answer
Your Answer
Defining right quality for the job , Vendor performance evaluation , Making sure that
suppliers understand the requirements
Vendor performance evaluation , Making sure that suppliers understand the requirements
, Defining right quality for the job
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the achievement of quality?
Correct Answer
Quality of conformance , Purpose of product , Quality of design
Your Answer
Quality of conformance , Quality of design
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Equipment utilization , Ease of supervision
Match The Following
Question
Correct Answer
Your Answer
Toung
Sweet
Sweet
Eye
Crack
Crack
Nose
Burnout
Burnout
Ear
Impact
Impact
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Your Answer
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Multiple Choice Multiple Answer
Question
Which are the subtasks of the maintenance phase of the method study?
Correct Answer
Monitoring and control , Performance appraisal , Audit on savings
Your Answer
Monitoring and control , Performance appraisal , Audit on savings
Multiple Choice Multiple Answer
Question
Which of the following are characteristics of an operating characteristics curve?
Correct Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Your Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Correct Answer Unexpected
Your Answer
Partial
Multiple Choice Single Answer
Question
Why stores issue order should not be issued as soon as it is prepared?
Correct Answer
Material may or may not be available at the time of preparation
Your Answer
Inventory investment will increase
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer
Tight
Your Answer
Tight
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
Correct Answer 0.01 to 10%
Your Answer
0.01 to 10%
Multiple Choice Multiple Answer
Question
Plant layout facilitates processing of products in most effective manner through the
following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer
True/False
Question
Shortest possible distance , Shortest processing time , Minimum movement
Correct Answer
After goods have been manufactured, route sheets and operation layouts should not be
collected back.
False
Your Answer
False
Multiple Choice Single Answer
Question
Process planning is the process of
Correct Answer
establishing shortest and most economic path of production
Your Answer
establishing shortest and most economic path of production
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer Operation
Your Answer
Operation
Select The Blank
Question
The ________ is specified to indicate the maximum permissible variability in the
dimensions product or parts.
Correct Answer Tolerance
Your Answer
Tolerance
Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch department
to identify and draw correct reference.
Correct Answer Forwarding note
Your Answer
Select The Blank
Forwarding note
Question
Correct Answer
The ________ includes preventive maintenance activities whose needs are identified
through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Shutdown Maintenance
True/False
Question
Correct Answer
A load chart specifies the work to be carried out by each person of company during shift
hours.
False
Your Answer
True
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
True/False
Question
Overtime working
Correct Answer
Under MRP system for common items order for procurement is placed based on
requirement for each product
False
Your Answer
True
Multiple Choice Single Answer
Question
What do you understand by the extent the products manufactured conforms to the laid
down design?
Correct Answer Quality of conformance
Your Answer
Quality of conformance
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producing
company.
Correct Answer Inspection order
Your Answer
Job card
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Deifinite , Undesrstandable , Economically viable
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer
Your Answer
True/False
Question
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up , Due to purposely done mistakes by unsatisfied worker
A sampling plan which perfectly discriminates will have vertical OC curve.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is a part of preparing manufacturing order set as a primary
function of dispatching?
Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer
Operational layouts , Rejection reports , Move orders , Pre-filled stores issue orders
Select The Blank
Question
An ________ history card is the record of all repairs, replacements and engineering
changes carried out in the equipment during it's period of service.
Correct Answer Equipment history card
Your Answer
True/False
Question
Equipment history card
Specifications is the basic tool of inspection.
Correct Answer
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Forcasting requirement for indirect Past consumption analysis
material
technique
Economic order quantity
Inventory control by classification
ABC Analysis
ABC Analysis
Structure of the product
BOM
BOM
Material Planning for dependent
demand
MRP
MRP
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as per
instruction is called
Correct Answer Work Order
Your Answer
Job Instructions
Multiple Choice Single Answer
Question
Who prepares the daily production report?
Correct Answer
Shop Supervisor
Your Answer
Shop Supervisor
True/False
Question
A lot declared rejected in sampling inspection should not be inspected 100% in any case.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
How is the probability of acceptance in case of Acceptable Quality Level (AQL )?
Correct Answer
Very high
Your Answer
Average
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Progress cards , Network updating
True/False
Question
The dispatching function is of very importance in flow and mass production units.
Correct Answer
False
Your Answer
True
True/False
Question
Proper care and storage is not an essential part of a well planned lubrication system.
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
Production Planning is a centralised activity which includes functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Fulkerson's Rule