POM assgn Select The Blank Question Correct Answer The ________ must ensure that the product satisfy the functional requirements of it's usage. Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following information is available in summary of part in a chart during methods study? Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by the object Your Answer Frequency of each symbol , Total time for each symbol True/False Question The event numbers as far as possible reflect the logical relationships of the activities. Correct Answer True Your Answer False Multiple Choice Single Answer Question Which varaible is taken along the ordinate or Y axis? Correct Answer Quality Your Answer Quality Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Multiple Choice Single Answer Question Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation? Correct Answer Extrernal inspection Your Answer Extrernal inspection Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Thick Line , Red Line , Double Line Your Answer Thick Line , Red Line , Double Line Multiple Choice Multiple Answer Question What are the benefits of overhauling? Correct Answer It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares Your Answer Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Line Layout Product Layout Line Layout Shop layout Process Layout Functional Layout Functional Layout Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Select The Blank Question Labour laws , Building codes , Policies regarding issue of licences Correct Answer The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Your Answer Acceptable quality level Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan are Correct Answer F H Dodge , H G Roming , Walter Schewhart Your Answer F H Dodge , H G Roming , Walter Schewhart True/False Question Correct Answer Skill of labour force in a product type layout is usually higher than in the process type of layout False Your Answer True True/False Question Correct Answer Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. False Your Answer Select The Blank Question True Correct Answer The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Your Answer Job card Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Select The Blank Question Correct Answer The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Your Answer Overhauling True/False Question All activities lying on the non-critical paths must have total float and free float. Correct Answer False Your Answer False Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Method Match The Following Question Correct Answer Your Answer Crash cost of an activity Cc Cc Normal time of an activity Tn Tn Crash time of activity Tc Tc Normal cost of an activity Cn Cn Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer True/False Question Correct Answer In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart. True Your Answer False Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Select The Blank Question Lots having the percentage defective less than AQL but more than LPTD Correct Answer The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Your Answer Overtime working Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Your Answer Semiskilled Multiple Choice Multiple Answer Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart? Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt Your Answer True/False Wear of tool , Abnormal rise in temperature , Accumulation of dirt Question Root cause of most of the breakdowns is failure of the lubrication system. Correct Answer True Your Answer True True/False Question Correct Answer It is not necessary to know spare time available on the non-critical path to allow a little delay for noncritical activity. False Your Answer False True/False Question MRP software generates time periodwise requiremetn of subassemblies Correct Answer True Your Answer True True/False Question Correct Answer In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. True Your Answer True Multiple Choice Single Answer Question What do you mean by CPM? Correct Answer Critical Path Method Your Answer Critical Path Method Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Overlapping of operations , Effective Capacity per work centre , Performance standards Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Over ordering , under ordering , stockouts Your Answer Over ordering , under ordering , stockouts Multiple Choice Single Answer Question What do you mean by the verification of object against predetermined standards of quality or quantity or both? Correct Answer Inspection Your Answer Inspection Multiple Choice Multiple Answer Question What are the advantages of templates over diagrams? Correct Answer Can be conveniently moved on the graph paper , Less laborious , Saves time Your Answer Can be conveniently moved on the graph paper , Less laborious , Unskilled person can do and analyze it True/False Question Correct Answer It would not affect the project completion time if non-critical activities take little loner time than planned. True Your Answer True Select The Blank Question Correct Answer The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Your Answer Producer's risk Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Select The Blank Question Factory Correct Answer An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Your Answer Bell Multiple Choice Single Answer Question Which is the right time to prepare stores issue order? Correct Answer When route sheet is ready Your Answer When route sheet is ready Multiple Choice Single Answer Question Which element of a network represents a task which has got a definite beginning and definite end? Correct Answer Activity Your Answer Activity Multiple Choice Single Answer Question Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown? Correct Answer Internal inspection Your Answer Select The Blank Question Internal inspection Correct Answer Production Planning is a centralised activity which includes functions such as ________ Scheduling Your Answer Dispatching Select The Blank Question Correct Answer The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Your Answer Quality control Select The Blank Question Correct Answer Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Forwarding note Your Answer Forwarding note Multiple Choice Single Answer Question Who has introduced the useful concept of control chart in 1931? Correct Answer Walter Shewhart Your Answer Walter Shewhart