Question Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple Answer
Question What are the benefits of reconditioning?
Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It
helps to plan requirement of replacement spares
Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement spares
Multiple Choice Multiple Answer
Question Which kind of natural delays and interruptions are considered during estimation of activity
time?
Correct Answer Shop efficiency , Breakdowns , Absenteeism
Your Answer Breakdowns , Absenteeism , Delay due to shortage of resources
Multiple Choice Multiple Answer
Question How to exercise control over quality?
Correct Answer Periodical analysis of inspecting reports to establish causes of rejections , Preperation of
quality standard and specifications , Exercising control over inputs
Your Answer Periodical analysis of inspecting reports to establish causes of rejections , Preperation of
quality standard and specifications , Replacing existing measuring instruments by those having smaller
least count. , Exercising control over inputs
True/False
Question In case of forward pass computation, the earliest event time of a plain event equals the
earliest event time of the preceding event plus duration of activity emanating from the preceding event.
Correct Answer True
Your Answer True
True/False
Question Any proposed change must not be intimated to workers in advance.
Correct Answer False
Your Answer False
Select The Blank
Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.
Correct Answer Specifications
Your Answer Standards
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications
Select The Blank
Question A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Collaboration
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Development and selection
Multiple Choice Single Answer
Question In exponential smoothing method,for a stable demand pattern and better smoothing effect,
value of fraction( Alpha) selected is
Correct Answer 0.05 to 0.10
Your Answer 0.20 to 0.25
Multiple Choice Single Answer
Question Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer Reduce process rejections
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Acceptable quality level
Multiple Choice Multiple Answer
Question Which of the following observations are expected from the preventive maintenance person?
Correct Answer Wrong allignments , Overheating defects , Excessive play
Your Answer Wrong allignments , Overheating defects , Excessive play
Multiple Choice Single Answer
Question When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer After completion of operation
Your Answer After completion of operation
Select The Blank
Question The ________ must ensure that the product satisfy the functional requirements of it's usage.
Correct Answer Quality of design
Your Answer Quality of conformance
Multiple Choice Single Answer
Question What do you understand by the properties which are difficult to measure quantitatively but
usually measured by the comarision and then classification into acceptable or unacceptable?
Correct Answer Attributes
Your Answer Attributes
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources , To improve the labour efficiency
True/False
Question Since recording by descriptive method has it's limitations, it is not recommended for use in
method study.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What do you mean by the selection of the job for the method study on the basis of
manufacturing difficulties?
Correct Answer Technical consideration
Your Answer Economic consideration
Multiple Choice Single Answer
Question One of the external factors influencing Material Planning is
Correct Answer Price trends
Your Answer Price trends
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Lot Tolerance Percentage Defective
True/False
Question Cent percent inspection is a must if the inspection is of destructive nature.
Correct Answer False
Your Answer True
Select The Blank
Question Capacity decisions have a direct influence on performance of production system in respect of
________
Correct Answer Delivery performance
Your Answer Delivery performance
Multiple Choice Multiple Answer
Question Which of the following factors related to the labour and wages are considered while deciding
the plant location?
Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Your Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
True/False
Question If the firm has adopted elaborate planned maintenance system, there is no chance of any
unplanned maintenance work.
Correct Answer False
Your Answer False
Match The Following
Question Correct Answer Your Answer
Change in chemical characteristic Chemical reaction Chemical reaction
Consumption of effort Posting a ledger Giving directions or instructions
Information given Giving directions or instructions Posting a ledger
Subtraction Removal of worn-out part from a machine Removal of worn-out part from a machine
Select The Blank
Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the
probability of acceptance of ________.
Correct Answer One
Your Answer One
Select The Blank
Question A set of activities to keep an equipment in the specified condition is called as ________.
Correct Answer Maintenance
Your Answer Maintenance
Multiple Choice Single Answer
Question Site factors for plant location include
Correct Answer Suitability of land
Your Answer Suitability of land
True/False
Question Both, preventive and breakdown maintenance work must be assigned to the same team.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question Product layout is employed for manufacturing following products
Correct Answer refrigirators
Your Answer automobile components
Multiple Choice Single Answer
Question What can be the worst effect due to excessive vibration?
Correct Answer Breakdown
Your Answer Breakdown
Multiple Choice Multiple Answer
Question What is indicated by the erratic pattern points falling above and below the control limits in the
Xbar-R-control chart?
Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
True/False
Question In case of two handed process chart, inspection symbol is used when check by touch or feel is
involved.
Correct Answer True
Your Answer True
True/False
Question Site selection should also take into account topography and soil structure of the land.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Effectiveness
Select The Blank
Question A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.
Correct Answer Control board
Your Answer Control board
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Sampling Inspection
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Production Scheduling
Gantt Chart Production Scheduling Charting technique
True/False
Question Only skilled worker can use the fixed limit gauge.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which are the different methods to record details of the existing method during method
study?
Correct Answer Charts , Diagrams , Templates or models
Your Answer Charts , Diagrams
Multiple Choice Single Answer
Question Which photographic technique is used to record path of motions of the members of the body
during method study?
Correct Answer Cyclograph
Your Answer Flowgraph
Select The Blank
Question The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Inspection
True/False
Question In case of centralised inspection, inspection rooms generally become bottleneck and cause
delay in taking action regarding rejection or rework.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following are minimum requirement for a good quality of design?
Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time