POM assgn : Amit True/False Question The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Delivery Dates Your Answer Process capability of machine , Delivery Dates , Order Quantity Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Both forecast and pending orders Your Answer Both forecast and pending orders True/False Question Skill of labour force in a product type layout is usually higher than in the process type of layout Correct Answer False Your Answer True Multiple Choice Single Answer Question In exponential smoothing method,for a stable demand pattern and better smoothing effect, value of fraction( Alpha) selected is Correct Answer 0.05 to 0.10 Your Answer True/False Question 0.05 to 0.10 Recording of movement is not necessary in case of method study in any form. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , normal cost , To achieve uniformity in requirement Your Answer To complete the project in the least possible time , normal cost , To achieve uniformity in requirement Multiple Choice Single Answer To reduce project cost below it's of resources To reduce project cost below it's of resources Question Which is the next stage to the inspection based quality control in the historical development of quality management. Correct Answer Quality assurance Your Answer Total Quality management Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Low Productivity Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring True/False Question Inspection should be conducted on all incoming materials, semifinished items, bought out components, subcontract items prior to any operation, assembly. Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Predetermination of manufacturing requirements Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False Question A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer False Match The Following Question Correct Answer Your Answer Pessimistic time b b Expected time Te Te Optimistic time a a Most likely time m m True/False Question Breakdown is inversly proportional to the investment in W.I.P. Correct Answer False Your Answer True Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Your Answer Capacity Planning , Job Design , Production Planning Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method study? Correct Answer Monitoring and control , Performance appraisal , Audit on savings Your Answer True/False Question Monitoring and control , Performance appraisal , Audit on savings short cycle job should be studied for macroscopic motions. Correct Answer False Your Answer True Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer True/False Quality control system Question Inspection Order can be a verbal order Correct Answer True Your Answer False Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer introduction of new product Your Answer improve quality Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Progress cards , Network updating Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Normal cost Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Multiple Choice Single Answer Question What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties? Correct Answer Technical consideration Your Answer Economic consideration True/False Question In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. Correct Answer False Your Answer True Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Machine utilization Gantt Chart Production Scheduling Production Scheduling Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting Your Answer Brazing , Welding , Riveting Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Your Answer Skilled in all Manufacturing Processes Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Inspection order Multiple Choice Multiple Answer Question Which are the factors on which the structure of the transportation cost depends? Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment Your Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment Multiple Choice Single Answer Question Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit? Correct Answer Separate inspection room Your Answer Separate inspection room True/False Question In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres. Correct Answer True Your Answer True