POM assgn : Shagun Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer True/False Question Open purchase order An ideal OC curve is never possible only with cent percent inspection. Correct Answer False Your Answer True Match The Following Question Correct Answer Your Answer Table lubrication Weekly Six monthly Draining and refilling of oil reserviors of plunger pump Yearly Yearly Parts lubricated with oil nipple Daily Weekly Tools and slideways two to three times a day Daily True/False Question The operator should not stop production if first piece is not approved by the inspector. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Move order Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by using symbols while recording in method study? Correct Answer Transport , Delay , Storage Your Answer Transport , Rejection , Storage Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection Your Answer Zone of rejection True/False Question A properly designed sampling plan can control sampling errors and completely eliminate them. Correct Answer False Your Answer True Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer True/False Question Environmental specifications Grouping of machines gives a lot of flexibility in loading and scheduling Correct Answer True Your Answer True True/False Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Economically viable True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Modifications and improvements , Overhauling , Emergency repairs Your Answer Modifications and improvements , Overhauling , Lubrication as per schedule Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Product Planning Your Answer Order Processing Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By experience Your Answer By vendor plant surveys , By the perofrmance of first lot , By experience Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control Match The Following Question Correct Answer Your Answer Pessimistic time b p Expected time Te Te Optimistic time a o Most likely time m m Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Job cards , Progress cards Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-Rcontrol chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Part Sketch , Standard Time , Jigs and fixtures Your Answer Sequence of operations , Standard Time , Jigs and fixtures Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Flow chart Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On manufacturing process Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Pictograph Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Bell True/False Question In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres. Correct Answer True Your Answer True Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer True/False Question Quality Floor inspection promotes tendency of machines to drift out of limits and produce defectives. Correct Answer False Your Answer True/False Question False A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer True Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Control plans , Charts , Templates or models Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Both forecast and pending orders Your Answer Past sales Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Acceptable quality level Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Total cost Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of design Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up