POM assgn : Shagun Select The Blank Question

advertisement
POM assgn : Shagun
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer
True/False
Question
Open purchase order
An ideal OC curve is never possible only with cent percent inspection.
Correct Answer False
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Table lubrication
Weekly
Six monthly
Draining and refilling of oil
reserviors of plunger pump
Yearly
Yearly
Parts lubricated with oil nipple
Daily
Weekly
Tools and slideways
two to three times a day
Daily
True/False
Question
The operator should not stop production if first piece is not approved by the inspector.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the production schedule in
a factory?
Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
True/False
Question
For p-chart, the central line of fraction defectives is determined by average percentage
defectives.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up production , Communicating
possible delays in delivery date commitment to sales department , Devising cures to
keep rate of production in line with schedule
Your Answer
Recording progress of work , Communicating possible delays in delivery date
commitment to sales department , Devising cures to keep rate of production in line with
schedule
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer After completion of operation
Your Answer
After completion of operation
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producing
company.
Correct Answer Inspection order
Your Answer
Move order
Multiple Choice Multiple Answer
Question
What are the benefits of reconditioning?
Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement spares
Your Answer
Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement spares
Multiple Choice Multiple Answer
Question
Which of the following processes or activities are denoted by using symbols while
recording in method study?
Correct Answer Transport , Delay , Storage
Your Answer
Transport , Rejection , Storage
Multiple Choice Single Answer
Question
Which is the zone beyond LTPD in case of Oc curve of a general plan?
Correct Answer Zone of rejection
Your Answer
Zone of rejection
True/False
Question
A properly designed sampling plan can control sampling errors and completely eliminate
them.
Correct Answer False
Your Answer
True
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified
through inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer
Shutdown Maintenance
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Correct Answer Environmental specifications
Your Answer
True/False
Question
Environmental specifications
Grouping of machines gives a lot of flexibility in loading and scheduling
Correct Answer True
Your Answer
True
True/False
Question
A lot declared rejected in sampling inspection should not be inspected 100% in any
case.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
True/False
Question
The plotting of activities - critical, non-critical and dummy activities- is strictly according
to their precedence relationship.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are activities of corrective maintenance?
Correct Answer Modifications and improvements , Overhauling , Emergency repairs
Your Answer
Modifications and improvements , Overhauling , Lubrication as per schedule
Multiple Choice Single Answer
Question
Following is not a function of PPC
Correct Answer Product Planning
Your Answer
Order Processing
Multiple Choice Multiple Answer
Question
Which of the following three methods used to select the qualified supplier?
Correct Answer By vendor plant surveys , By reputation , By experience
Your Answer
By vendor plant surveys , By the perofrmance of first lot , By experience
Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extent
desirable.
Correct Answer Quality control
Your Answer
Quality control
Match The Following
Question
Correct Answer
Your Answer
Pessimistic time
b
p
Expected time
Te
Te
Optimistic time
a
o
Most likely time
m
m
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer
Display boards , Job cards , Progress cards
Multiple Choice Single Answer
Question
One of the characterstic of layout is about the flow of material / personnel. In a good
layout the flow should be
Correct Answer Unidirectional
Your Answer
Unidirectional
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of the process in X bar-Rcontrol chart?
Correct Answer Biases in measurements , Recording done without actual measurements , Improper
selection of samples
Your Answer
Biases in measurements , Recording done without actual measurements , Improper
selection of samples
Multiple Choice Multiple Answer
Question
Operation Layout generally contains following information
Correct Answer Part Sketch , Standard Time , Jigs and fixtures
Your Answer
Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project which is composed as
series of connected arrows and circles to describe the interrelationship of the activities
involved?
Correct Answer Network
Your Answer
Flow chart
Multiple Choice Single Answer
Question
Where does the SPC exercises the control to prevent the occurances of defectives?
Correct Answer On manufacturing process
Your Answer
On manufacturing process
Multiple Choice Single Answer
Question
Which photographic technique is used to record path of motions of the members of the
body during method study?
Correct Answer Cyclograph
Your Answer
Pictograph
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal
to or better than AQL .
Correct Answer Rectangular
Your Answer
Bell
True/False
Question
In Gantt Chart, the horizontal lines devide vertical lines into sections which represents
either operations or work centres.
Correct Answer True
Your Answer
True
Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch department
to identify and draw correct reference.
Correct Answer Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
Capacity decisions have a direct influence on performance of production system in
respect of ________
Correct Answer Delivery performance
Your Answer
True/False
Question
Quality
Floor inspection promotes tendency of machines to drift out of limits and produce
defectives.
Correct Answer False
Your Answer
True/False
Question
False
A sampling plan which perfectly discriminates will have vertical OC curve.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer Operation
Your Answer
Manufacturing
Multiple Choice Multiple Answer
Question
Which are the different methods to record details of the existing method during method
study?
Correct Answer Charts , Diagrams , Templates or models
Your Answer
Control plans , Charts , Templates or models
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Correct Answer Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Gross requirement of products is determined on the basis of
Correct Answer Both forecast and pending orders
Your Answer
Past sales
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer
Acceptable quality level
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within
it's normal time?
Correct Answer Normal cost
Your Answer
Normal cost
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within
it's crashed time?
Correct Answer Crash cost
Your Answer
Total cost
Multiple Choice Single Answer
Question
What do you understand by the extent the products manufactured conforms to the laid
down design?
Correct Answer Quality of conformance
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up
Your Answer
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up