POM assgn : Shagun True/False Question It pays in the long run to inform the customer regarding expected delays in the deliveries. Correct Answer True Your Answer True Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Delivery Dates Your Answer True/False Order Quantity , Delivery Dates , Plant layout Question Availability of training schools, colleges and management institutes reduces the company's internal training needs. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Lime stone Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Production Scheduling Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Charting technique Match The Following Question Correct Answer Your Answer Fixation of inventory level Reorder level Stock on hand Symptom of ill planned purchasing Over ordering Over ordering Factor influencing material planning Lead time Lead time Net requirement of material under Stock on hand MRP Price of material Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest of activities along each path. , Enumerate all paths in the activities on each path. Your Answer Compare the durations of all paths to identify the longest of activities along each path. , Enumerate all paths in the activities on each path. path. , Sum up the durations network and list down path. , Sum up the durations network and list down Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question Tool breakage has got nearly zero chances in case of eventual breakdown. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Total float , Independent float , Free float Your Answer Total float , Dependent float , Free float Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Overhauling Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time ) Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time ) Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time True/False Question In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small. Correct Answer False Your Answer True Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer labourious Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Predetermination of manufacturing requirements Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Reduces chances of rejections Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Reduced salvage value of machine Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Performance specifications Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines Your Answer Overloading of machines Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the waiting time and thereby reduce production losses Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Operation , Inspection , Production True/False Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer True/False Preventive Maintenance Question The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. Correct Answer False Your Answer False Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Quality True/False Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Your Answer True Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Idle wages Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Order procurement Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis? Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection Your Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection True/False Question Shop order is one of the subsidiary order Correct Answer True Your Answer True Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Lot Tolerance Percentage Defective True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences , Productivity of labour