LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity True/False Question Skill of labour force in a product type layout is usually higher than in the process type of layout Correct Answer False Your Answer True Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer easier True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer False Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer introduction of new product Your Answer introduction of new product Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Your Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer True Multiple Choice Single Answer Question Data from Process Sheet can be used to Correct Answer Prepare load and schedule charts Your Answer Monitor progress of work Multiple Choice Single Answer Question How should a dummy activity be represented in a network? Correct Answer By dotted line Your Answer By dotted line Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications True/False Question A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer False Match The Following Question Correct Answer Your Answer Scheduling of interrelated Critical Path Analysis activities of small projects with consideration of uncertainty of duration of activities. Critical Path Analysis Two machines & processing Johnson's Two Machine time depends on sequence of Algorithm job loading Critical Ratio Scheduling Sufficient orders and Index Method resonable choice of machines Johnson's Two Machine Algorithm Time relationship between when a product is required and when it can be made Time series Critical Ratio Scheduling available True/False Question Systematic maintenance system can completely eliminate the wear and tear of machines. Correct Answer False Your Answer False Multiple Choice Single Answer Question Providing flexibility in plant layout means Correct Answer Layout can be changed without much cost if required Your Answer Machine allocation can be changed easily True/False Question Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which information is recorded in an equipment card? Correct Answer Date of commissioning , Equipment specifications , Name and address of manufacturer Your Answer Price of an equipment , Equipment specifications , Name and address of manufacturer Multiple Choice Multiple Answer Question Which of the following method can be adopted to overcome the problem of rushing up a job for it's timely completion? Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting Your Answer Use of optimum speeds and feeds , Subcontracting , Job splitting Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph Your Answer Micromotion study , Cyclegraph , Chronocyclegraph Multiple Choice Multiple Answer Question Which are the sources of information to update the progress card daily? Correct Answer Detachable ticket , Daily production report , Job Card Your Answer Detachable ticket , Daily production report , Job Card Multiple Choice Single Answer Question What do you understand by the critical analysis of existing jobs to develop easier and effective method? Correct Answer Method study Your Answer Method study Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Shortest processing time , Minimum movement Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question Dispatching function is not a part of Production Planning Correct Answer True Your Answer False Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function Your Answer Acceptance function , Preventive function , Assurance function True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer True Match The Following Question Draining and refilling of oil reserviors of plunger pump Correct Answer Your Answer Yearly Yearly Parts lubricated with oil nipple Daily Daily Tools and slideways two to three times a day two to three times a day Table lubrication Weekly Weekly Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Positioning , Unloading , Drilling True/False Question Labour turnover rate is higher in case of rural area as compared to urban area. Correct Answer False Your Answer True Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note Multiple Choice Single Answer Question What does CPA stand for? Correct Answer Critical Path Analysis Your Answer Critical Path Analysis Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP Your Answer Exponential smoothing Multiple Choice Single Answer Question What is the name of the document on which details of the process are recorded by the symbols and charting conventions? Correct Answer Chart Your Answer Flowsheet Multiple Choice Multiple Answer Question Which are the general principles underlying probability aspects of project planning? Correct Answer Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Your Answer Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Multiple Choice Multiple Answer Question Gross requirement of finished product is determined on the basis of following Correct Answer Forecasted sales , Pending sales order , Management decision to stock Your Answer Pending sales order , Management decision to stock , Gross Market requirement Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working True/False Question An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Cost specifications , Material specifications , Dimensional specifications Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question Which chart sets out the sequence of flow of work of a product, or any part of it through the section or department or a factory by recording the events under review using appropriate symbols? Correct Answer Flow process chart Your Answer Operation process chart Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement Your Answer Work measurement Multiple Choice Multiple Answer Question Which three of the following options can be used to reduce the duration of activity during project crashing? Correct Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Your Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Cyclograph