LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Sampling inspection is best suited when cost of inspection is
much higher than the loss arising from the acceptance of a
defective part.
Correct Answer True
Your Answer
True
Select The Blank
Question
The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic
inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer
Preventive Maintenance
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer
Poor Customer Service
True/False
Question
Breakdown is inversly proportional to the investment in W.I.P.
Correct Answer False
Your Answer
False
Select The Blank
Question
The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactory
as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
True/False
Question
Inspection Order can be a verbal order
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?
Correct Answer Normal cost
Your Answer
Normal cost
Multiple Choice Single Answer
Question
Following is not a function of PPC
Correct Answer Product Planning
Your Answer
Product Planning
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
Time and Motion
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.
Correct Answer 0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Maintenance function must be decentralised apart from a size of
a manufacturing organisation for it's better functioning.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project
Production?
Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Your Answer
Highly mechanised material handling
Select The Blank
Question
The ________ is a set of tools and techniques by which products
are made to comply with the specifications at minimum cost to
the firm.
Correct Answer Quality control system
Your Answer
Production system
Multiple Choice Single Answer
Question
What do you understand by the extent the products
manufactured conforms to the laid down design?
Correct Answer Quality of conformance
Your Answer
Quality of conformance
Multiple Choice Multiple Answer
Question
Which of the following observations are expected from the
preventive maintenance person?
Correct Answer Wrong allignments , Overheating defects , Excessive play
Your Answer
Wrong allignments , Overheating defects , Excessive play
Select The Blank
Question
The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.
Correct Answer Specifications
Your Answer
Specifications
Multiple Choice Single Answer
Question
How industry has responded to the fact of existence of inherant
variability of the manufacturing process?
Correct Answer Inclusion of certain tolerance on the basic dimensions in the
drawing
Your Answer
Inclusion of certain tolerance on the basic dimensions in the
drawing
Select The Blank
Question
The ________ is specified to indicate the maximum permissible
variability in the dimensions product or parts.
Correct Answer Tolerance
Your Answer
Tolerance
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
Capacity decisions have a direct influence on performance of
production system in respect of ________
Correct Answer Delivery performance
Your Answer
Delivery performance
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by
the sampling plan.
Correct Answer Consumer's risk
Your Answer
Consumer's risk
Multiple Choice Multiple Answer
Question
Which of the following schedules are recommended to prepare
and follow as a part of preventive maintenance system?
Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule
, Lubrication schedule
Your Answer
Preventive inspection schedule , Cleaning and upkeep schedule
, Lubrication schedule
Multiple Choice Multiple Answer
Question
Which are the three distinct parts of the chart?
Correct Answer Summary , Introduction , Body
Your Answer
True/False
Summary , Introduction , Analysis
Question
F W Taylor devised a system for classifying motions into basic
divisions called Therbligs
Correct Answer False
Your Answer
False
True/False
Question
A properly designed sampling plan can control sampling errors
and completely eliminate them.
Correct Answer False
Your Answer
False
True/False
Question
Since value of p can never be positive, hence" if LCLp works out
to be positive, it is taken as zero."
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some maintenance
related characteristics by making use of human senses, when
equipment is in operation?
Correct Answer Extrernal inspection
Your Answer
Daily inspection
Multiple Choice Multiple Answer
Question
Which of the following information is available in summary of part
in a chart during methods study?
Correct Answer Frequency of each symbol , Total time for each symbol , Total
distance travelled by the object
Your Answer
Frequency of each symbol , Total time for each symbol , Present
and proposed method
Multiple Choice Single Answer
Question
Which kind of labour force is required in case of Jobbing
Production?
Correct Answer Highly Skilled
Your Answer
True/False
Question
Semiskilled
In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upper
and lower statistical limits are worked out and inserted into a
chart.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are the different methods to record details of the existing
method during method study?
Correct Answer Charts , Diagrams , Templates or models
Your Answer
Charts , Diagrams , Templates or models
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing
the production schedule in a factory?
Correct Answer Errors in drawings , Delay in receipt of material from vendor ,
Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor ,
Excessive absenteeism
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
Product layout is suitable when
Correct Answer Products have reasonable stable demand
Your Answer
Products are not required in large quantities
Multiple Choice Single Answer
Question
Following is one of the tasks of Production Control
Correct Answer Actual issue of forms and documents
Your Answer
Actual issue of forms and documents
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer
Necessity
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer
Reducing handling costs
True/False
Question
A lot declared rejected in sampling inspection should not be
inspected 100% in any case.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which information is recorded in an equipment card?
Correct Answer Date of commissioning , Equipment specifications , Name and
address of manufacturer
Your Answer
Equipment specifications
Multiple Choice Multiple Answer
Question
Which of the following are illustrations of inspection?
Correct Answer Physical count of incoming material against the quantity
mentioned in delivery challan , A dimensional check with
measuring instrument , Visual check of burrs and finish
Your Answer
Physical count of incoming material against the quantity
mentioned in delivery challan , A dimensional check with
measuring instrument , Visual check of burrs and finish
Multiple Choice Multiple Answer
Question
What is the basic minimum requirement for those who are
responsible for the quality of design?
Correct Answer In depth knowledge about alternative materials and
manufacturing processes , access to latest technology and
production process adopted by industries in the developed
market , Continuous effort in product development
Your Answer
In depth knowledge about alternative materials and
manufacturing processes , access to latest technology and
production process adopted by industries in the developed
market , Continuous effort in product development
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during
recording of method study?
Correct Answer Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines for
their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines for
their turn
True/False
Question
Regular lubrication with carefully selected lubricants is an
essential factor in the maintenance of high grade machine tools
working under continuous load.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Following is not an input information for Process Planning
Correct Answer Inventory level
Your Answer
Drawings
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than
3% defectives have the probability of acceptance of ________.
Correct Answer One
Your Answer
One
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory is
called
Correct Answer MRP
Your Answer
CPM
Download