POM assgn : GS Kumars Multiple Choice Multiple Answer

advertisement
POM assgn : GS Kumars
Multiple Choice Multiple Answer
Question Why graphical method of recording is preferred over the descriptive method during method
study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing ,
Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which of the following are examples of consumption of physical effort during recording for
method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Select The Blank
Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.
Correct Answer Specifications
Your Answer Specifications
Select The Blank
Question The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooling for most economic
production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layout
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single Answer
Question What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?
Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer Operation
Your Answer Production
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Minimum movement
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation
Multiple Choice Single Answer
Question Management often fails to realize the importance of efficient layout due to following reason
Correct Answer losses resulting from poor layout are not directly shown in the financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial statements
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer Factory
Your Answer Factory
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single Answer
Question How does the control chart of statistical quality control helps the operating personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage
defectives.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Critical examination
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling