POM assgn : Naresh True/False Question Objective of Work Study is to improve Productivity Correct Answer True Your Answer True Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Flow Process chart Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing? Correct Answer Visual Testing , Eddy current , Magnetic flow detectors Your Answer Stress testing , Visual Testing , Magnetic flow detectors Multiple Choice Single Answer Question What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties? Correct Answer Technical consideration Your Answer Manufacturing consideration True/False Question After goods have been manufactured, route sheets and operation layouts should not be collected back. Correct Answer False Your Answer False True/False Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Infinite resources are available to carry out the activity , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Multiple Choice Multiple Answer Question Which are the distinguished features of TQM ? Correct Answer Covers all kinds of industries , Gradual removal of interdepartmental barriers , Continuous improvement Your Answer Covers all kinds of industries , Continuous improvement , Corrective function Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Cost specifications , Material specifications , Performance specifications Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer True/False Question Control board Site selection should also take into account topography and soil structure of the land. Correct Answer True Your Answer True Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Rectangular Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM Multiple Choice Single Answer Question What is the purpose of squares used in progress chart? Correct Answer To record the progress of work for each operation Your Answer To record the progress of work for each operation Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment specification sheet Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Single Answer Question What do you understand by the properties which are difficult to measure quantitatively but usually measured by the comarision and then classification into acceptable or unacceptable? Correct Answer Attributes Your Answer Specifications Multiple Choice Single Answer Question What is the relation between duration of an activity and length of an arrow? Correct Answer No relation Your Answer True/False Question No relation Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Operation , Inspection , Production Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart? Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt Multiple Choice Single Answer Question How is the probability of acceptance in case of Acceptable Quality Level (AQL )? Correct Answer Very high Your Answer Very high Multiple Choice Multiple Answer Question Which of the following factors related to the labour and wages are considered while deciding the plant location? Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations Your Answer Prevailing wage pattern , Productivity of labour , Industrial relations Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective in AQL is equal to LPTD Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Inspection order True/False Question Quality can not be inspected into a product, it must be manufactured into it by the supplier. Correct Answer True Your Answer False Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk True/False Question A properly designed sampling plan can control sampling errors and completely eliminate them. Correct Answer False Your Answer True Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer At the start of the operation Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-Rcontrol chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Defect in materials , Improper selection of samples Multiple Choice Single Answer Question Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ? Correct Answer Graphical approach Your Answer Graphical approach True/False Question Kanban system is essentially a computer based system for production scheduling and control Correct Answer False Your Answer True True/False Question The earliest start time of an activity equals earliest time for the event from which activity arrow originates. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following situations demand the technical consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Your Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer True/False Question Drawing Theoretical capacity equals number of normal working hours of that machine. Correct Answer True Your Answer True Match The Following Question Correct Answer Your Answer Change in chemical characteristic Chemical reaction Chemical reaction Consumption of effort Posting a ledger Posting a ledger Information given Giving directions or instructions Giving directions or instructions Subtraction Removal of worn-out part from a machine Removal of worn-out part from a machine Multiple Choice Multiple Answer Question Which are the factors on which the structure of the transportation cost depends? Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment Your Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control