POM assgn : Naresh True/False Multiple Choice Single Answer Question

advertisement
POM assgn : Naresh
True/False
Question
Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by the chart on which the major activities and entry points of
materials are recorded to have graphic view of operations and inspections involved in
the process?
Correct Answer Operation process chart
Your Answer
Flow Process chart
Multiple Choice Multiple Answer
Question
Which of the following are types of non-destructive testing?
Correct Answer Visual Testing , Eddy current , Magnetic flow detectors
Your Answer
Stress testing , Visual Testing , Magnetic flow detectors
Multiple Choice Single Answer
Question
What do you mean by the selection of the job for the method study on the basis of
manufacturing difficulties?
Correct Answer Technical consideration
Your Answer
Manufacturing consideration
True/False
Question
After goods have been manufactured, route sheets and operation layouts should not be
collected back.
Correct Answer False
Your Answer
False
True/False
Question
Expediting action is necessary if the delays and interruptions are abnormal and hence
any subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible for the completion of an
activity , Infinite resources are available to carry out the activity , Activity time may
assume that just the normal quantity of resources required to carry out the activity are
available.
Multiple Choice Multiple Answer
Question
Which are the distinguished features of TQM ?
Correct Answer Covers all kinds of industries , Gradual removal of interdepartmental barriers ,
Continuous improvement
Your Answer
Covers all kinds of industries , Continuous improvement , Corrective function
Multiple Choice Multiple Answer
Question
How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer
Cost specifications , Material specifications , Performance specifications
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer
Hiring capacity
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular machine by change of route
of some of the jobs or by diverting work to other machine.
Correct Answer Control board
Your Answer
True/False
Question
Control board
Site selection should also take into account topography and soil structure of the land.
Correct Answer True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer
Above the arrow
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal
to or better than AQL .
Correct Answer Rectangular
Your Answer
Rectangular
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer PERT & CPM
Your Answer
PERT & CPM
Multiple Choice Single Answer
Question
What is the purpose of squares used in progress chart?
Correct Answer To record the progress of work for each operation
Your Answer
To record the progress of work for each operation
Select The Blank
Question
An ________ history card is the record of all repairs, replacements and engineering
changes carried out in the equipment during it's period of service.
Correct Answer Equipment history card
Your Answer
Equipment specification sheet
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified
through inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer
Shutdown Maintenance
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
What do you understand by the properties which are difficult to measure quantitatively
but usually measured by the comarision and then classification into acceptable or
unacceptable?
Correct Answer Attributes
Your Answer
Specifications
Multiple Choice Single Answer
Question
What is the relation between duration of an activity and length of an arrow?
Correct Answer No relation
Your Answer
True/False
Question
No relation
Independent float either affects the float of preceding activities or that of succeeding
activities.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following activities are used while recording for method study?
Correct Answer Delay , Operation , Inspection
Your Answer
Operation , Inspection , Production
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within
it's crashed time?
Correct Answer Crash cost
Your Answer
Crash cost
Multiple Choice Multiple Answer
Question
Which three of the following are causes of continuous upward pattern of Xbar-R control
chart?
Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Your Answer
Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Multiple Choice Single Answer
Question
How is the probability of acceptance in case of Acceptable Quality Level (AQL )?
Correct Answer Very high
Your Answer
Very high
Multiple Choice Multiple Answer
Question
Which of the following factors related to the labour and wages are considered while
deciding the plant location?
Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Your Answer
Prevailing wage pattern , Productivity of labour , Industrial relations
Multiple Choice Single Answer
Question
Which of the following is the criteria for the percentage defectives in the zone of the
indecision?
Correct Answer Lots having the percentage defective more than AQL but less than LPTD
Your Answer
Lots having the percentage defective in AQL is equal to LPTD
Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch department
to identify and draw correct reference.
Correct Answer Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producing
company.
Correct Answer Inspection order
Your Answer
Inspection order
True/False
Question
Quality can not be inspected into a product, it must be manufactured into it by the
supplier.
Correct Answer True
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
True/False
Question
A properly designed sampling plan can control sampling errors and completely eliminate
them.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer After completion of operation
Your Answer
At the start of the operation
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of the process in X bar-Rcontrol chart?
Correct Answer Biases in measurements , Recording done without actual measurements , Improper
selection of samples
Your Answer
Biases in measurements , Defect in materials , Improper selection of samples
Multiple Choice Single Answer
Question
Which is the alternative way of indicating the load other than numerical way, in case of
Gantt chart ?
Correct Answer Graphical approach
Your Answer
Graphical approach
True/False
Question
Kanban system is essentially a computer based system for production scheduling and
control
Correct Answer False
Your Answer
True
True/False
Question
The earliest start time of an activity equals earliest time for the event from which
activity arrow originates.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following situations demand the technical consideration while selecting a
job for method study?
Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors
for relaxation in allowed time because of variations in materials and tool performance ,
Jobs in which too many man-hours are spend in checking and rechecking work
Your Answer
Jobs having inconsistent quality , Operations inviting frequent requests from supervisors
for relaxation in allowed time because of variations in materials and tool performance ,
Jobs in which too many man-hours are spend in checking and rechecking work
Select The Blank
Question
The ________ is specified to indicate the maximum permissible variability in the
dimensions product or parts.
Correct Answer Tolerance
Your Answer
True/False
Question
Drawing
Theoretical capacity equals number of normal working hours of that machine.
Correct Answer True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Change in chemical characteristic Chemical reaction
Chemical reaction
Consumption of effort
Posting a ledger
Posting a ledger
Information given
Giving directions or instructions
Giving directions or instructions
Subtraction
Removal of worn-out part from a
machine
Removal of worn-out part from a
machine
Multiple Choice Multiple Answer
Question
Which are the factors on which the structure of the transportation cost depends?
Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment
Your Answer
Average distance of shipment , Characteristics of the commodity , Medium of shipment
Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extent
desirable.
Correct Answer Quality control
Your Answer
Quality control