POM assgn : Seema Select The Blank Question The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies. Correct Reconditioning Answer Your Answer Overhauling Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Work measurement Answer Your Answer Work measurement Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity Multiple Choice Single Answer Question What is the location of lower control limit in the X bar-R control chart? Correct Answer Your Answer 3 standard deviations below central line 2 standard deviations below central line Match The Following Question Correct Answer Your Answer Factor Analysis Method to evaluate layouts Technique for evolving and analysis of layouts Minimization of production delays Objective of good layout Principles of good layout Maximum visibility Principles of good layout Layout analysis Scale model Layout analysis Method to evaluate layouts Multiple Choice Single Answer Question What is the name of the document on which details of the process are recorded by the symbols and charting conventions? Correct Chart Answer Your Answer Chart Multiple Choice Single Answer Question Which kind of inspection is followed in case of process layout? Correct Answer Your Answer First off inspection Cent percent inspection Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Deviation from normal sound , Excessive Vibration , Leakage of a gas Answer Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas True/False Question Correct Answer Your Answer Process Sheets for parts in batch production are not maintained as standard process sheet False True Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Forwarding note Answer Your Answer Move order Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Your Answer Maintenance Maintenance Multiple Choice Multiple Answer Question What are the advantages of three dimensional models? Correct Answer Your Answer Overhead facilities can be shown , Can be shifted easily and quickly , Even non-technical person can use it Overhead facilities can be shown , Economical , Can be shifted easily and quickly Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Condition monitoring Answer Your Answer Preventive maintenance Multiple Choice Single Answer Question What do you understand by the selection of the job for the method study on the basis of money saving potential of the job? Correct Economic consideration Answer Your Answer Economic consideration Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Delivery performance Answer Your Answer Quality Multiple Choice Multiple Answer Question Which of the following are the objectives of a good maintenance system? Correct Answer Your Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability Match The Following Question Correct Answer Your Answer First off inspection First piece produced after tool change First piece produced after tool change Critical operation inspection After whose no rework is possible Last operation Patrolling inspection Inspection at the place of actual production Inspection at the place of actual production Key operation inspection Costlier operation After whose no rework is possible True/False Question Correct Answer Your Answer In case of backward pass computation, the latest event time of a tail event equals to the latest event time of the succeeding ( Head ) event minus duration of the activity converging to the head event.. True True Multiple Choice Multiple Answer Question Which of the following factors affect the quality control function? Correct Answer Your Answer Quality of workmanship , Production aids , Manufacturing facilities Quality of workmanship , Production aids , Manufacturing facilities Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer True/False Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set Question Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Cent percent inspection does not mean inspection of component for 100% quality characteristics. True True Cellular layout is based on the concept of Group Technology True True A lot declared rejected in sampling inspection should not be inspected 100% in any case. False False Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Concurrent activities Answer Your Answer Concurrent activities True/False Question Correct Answer Your Answer Recording of movement is not necessary in case of method study in any form. False False Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Shutdown Maintenance Answer Your Answer Shutdown Maintenance Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct easier Answer Your Answer easier True/False Question In case of backward pass computation, the latest event time of the burst event equals the smallest of the difference between the latest event time of the head event less duration of the activity converging on the head event. Correct Answer Your Answer True True Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Unexpected Answer Your Answer Unexpected Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Your Answer Brazing , Welding , Riveting Brazing , Welding , Riveting Multiple Choice Multiple Answer Question Which kind of natural delays and interruptions are considered during estimation of activity time? Correct Shop efficiency , Breakdowns , Absenteeism Answer Your Answer Shop efficiency , Breakdowns , Absenteeism Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Your Answer True/False Question Correct Answer Your Answer Identify the presence of an assignable cause before it develops Identify the presence of an assignable cause before it develops Inspection Order can be a verbal order True True Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Your Answer Over ordering , under ordering , stockouts Over ordering , under ordering , stockouts Multiple Choice Single Answer Question Inherent Safety' is one of the principle of good layout. In context of layout, this can be achieved by the following Correct Answer Your Answer Clear gangway, location of material and material handling system Proper plant location Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Multiple Choice Multiple Answer Question Which are the general principles underlying probability aspects of project planning? Correct Answer Your Answer Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into three equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct One Answer Your Answer 0.5 True/False Question Correct Answer Your Answer Grouping of machines gives a lot of flexibility in loading and scheduling True True Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Tolerance Answer Your Answer Tolerance Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Your Answer Tight Tight Multiple Choice Multiple Answer Question Correct Answer Your Answer Which are the first three steps of Critical Path Analysis technique? Activity relationships , Activity identification , Network construction Activity relationships , Activity identification , Network construction Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Acceptable quality level Answer Your Answer Lot Tolerance Percentage Defective Multiple Choice Single Answer Question What do you understand by the critical analysis of existing jobs to develop easier and effective method? Correct Method study Answer Your Answer Method study Multiple Choice Multiple Answer Question Which utilities are considered as infrastructural requirements? Correct Answer Your Answer True/False Question Correct Answer Your Answer Disposal of waste , Power , Water Power , Labour , Water During set up of X bar-R control chart, control limts should be practically revised from time to time as additional data is accumulated. True False Multiple Choice Single Answer Question What do you understand by identification of defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives? Correct Preventive function Answer Your Answer Preventive function