POM assgn Multiple Choice Single Answer Question

advertisement
POM assgn
Multiple Choice Single Answer
Question
Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of
improved methods?
Correct Answer Critical examination
Your Answer
Development and selection
Select The Blank
Question
The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and
preventive
Correct Answer Preventive Maintenance
Your Answer
Design-in Maintenance
Select The Blank
Question
The term ________ emplies the foregone profit due to inability of company to produce.
Correct Answer
Opportunity cost
Your Answer
Down time cost
True/False
Question
A network should employ only those dummy activities which are absolutely necessary.
Correct Answer
True
Your Answer
True
Select The Blank
Question
A set of activities to keep an equipment in the specified condition is called as
________.
Correct Answer Maintenance
Your Answer
True/False
Question
Maintenance
Correct Answer
While making X bar-R-chart, values of X bar and R are recoded samplewise either on
the extreme right of the individual measurements on the data sheet or in a separate
sheet.
True
Your Answer
False
Select The Blank
Question
The ________ must ensure that the product satisfy the functional requirements of it's
usage.
Correct Answer Quality of design
Your Answer
True/False
Quality of inspection
Question
Correct Answer
Even if any activity on the critical path is delayed, project completes on the scheduled
time.
False
Your Answer
False
Multiple Choice Single Answer
Question
Which is the alternative way of indicating the load other than numerical way, in case of
Gantt chart ?
Correct Answer Graphical approach
Your Answer
Symbolic pproach
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
Correct Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Overlapping of operations , Effective Capacity per work centre , Performance standards
Your Answer
Overlapping of operations , Effective Capacity per work centre , Performance standards
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the
producing company.
Correct Answer Inspection order
Your Answer
Stores issue order
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer
True/False
Question
Condition monitoring
Diversified labour is adequately available in rural area as compared to urban area.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following cases indicated that the operation has occurred?
Correct Answer
Movement of components to assembly section , Raw material movement , A worker's
trip to grinder to sharpen the tools
Your Answer
Movement of components to assembly section , A worker's trip to grinder to sharpen
the tools , Tools kept in rack of tool crib
Multiple Choice Single Answer
Question
What is the reason of fluctuations, if the control chart evaluates that the process is in a
state of statistical control?
Correct Answer Random variability
Your Answer
Set up variability
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
Product layout is suitable when
Correct Answer
Products have reasonable stable demand
Your Answer
Products are not required in large quantities
Multiple Choice Multiple Answer
Question
Which of the following charts are used for the recording of data during the method
study?
Correct Answer Operation process chart , Multiple activity chart , Flow process chart
Your Answer
True/False
Question
Operation process chart , Multiple activity chart , Flow process chart
The operator should not stop production if first piece is not approved by the inspector.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Need for change in layout can occur due to following reason
Correct Answer
introduction of new product
Your Answer
introduction of new product
Multiple Choice Single Answer
Question
What do you mean by a single event which represents the joint completion of more
than one activities?
Correct Answer Merge event
Your Answer
True/False
Merge event
Question
Correct Answer
The control chart for number of defectives is more convenient to make than control
chart for fraction defectives sincethe fugure of number of defectives units can be
directly taken from the inspection report.
True
Your Answer
True
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Juran's Rule
True/False
Question
Correct Answer
In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.
True
Your Answer
True
True/False
Question
All activities lying on the non-critical paths must have total float and free float.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Fixed position layout
Select The Blank
Question
The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.
Correct Answer Specifications
Your Answer
Specifications
Multiple Choice Single Answer
Question
How industry has responded to the fact of existence of inherant variability of the
manufacturing process?
Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing
Your Answer
Inclusion of certain tolerance on the basic dimensions in the drawing
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Job cards , Progress cards , Network updating
True/False
Question
Correct Answer
In case of backward pass computation, the latest event time of the end event equals to
the earliest event time minus duration of that activity.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple Answer
Question
Which of the following are examples of attributes?
Correct Answer
Cracks , Burrs , Texture
Your Answer
Cracks , Burrs , Texture
Match The Following
Question
Correct Answer
Your Answer
Scheduling Device
Strings
Strings
Interruption for machine
utilisation
Preventive maintenance
Preventive maintenance
Input for scheduling
Overlapping of operations
Critical Path Analysis
Technique of scheduling
Critical Path Analysis
JIT
Multiple Choice Multiple Answer
Question
Which are the three distinct parts of the chart?
Correct Answer
Summary , Introduction , Body
Your Answer
Summary , Introduction , Analysis
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Multiple Choice Multiple Answer
Question
Following are the commonly used factors considered for evaluation of layout in factor
analysis method
Correct Answer Flow of material , Equipment utilization , Working condition
Your Answer
Flow of material , Equipment utilization , Working condition
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large number of parts
Your Answer
product is very heavy involving assembly of large number of parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Acceptable quality level
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer
Commercial standards , Assembly and testing instructions , Bill of material
Multiple Choice Single Answer
Question
Process Engineer does not get sufficient time for designing tooling for most economic
production run when
Correct Answer Delivery time is less
Your Answer
Delivery time is less
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project which is composed as
series of connected arrows and circles to describe the interrelationship of the activities
involved?
Correct Answer
Network
Your Answer
Flow chart
True/False
Question
Latest finishing date is the latest event time of the tail event.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer Factory
Your Answer
Factory
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer
Consumer's risk
Your Answer
Consumer's risk
Download