POM assgn Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Development and selection Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Design-in Maintenance Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Down time cost True/False Question A network should employ only those dummy activities which are absolutely necessary. Correct Answer True Your Answer True Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer True/False Question Maintenance Correct Answer While making X bar-R-chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet. True Your Answer False Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer True/False Quality of inspection Question Correct Answer Even if any activity on the critical path is delayed, project completes on the scheduled time. False Your Answer False Multiple Choice Single Answer Question Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ? Correct Answer Graphical approach Your Answer Symbolic pproach Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Stores issue order Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer True/False Question Condition monitoring Diversified labour is adequately available in rural area as compared to urban area. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following cases indicated that the operation has occurred? Correct Answer Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools Your Answer Movement of components to assembly section , A worker's trip to grinder to sharpen the tools , Tools kept in rack of tool crib Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Your Answer Set up variability Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question Product layout is suitable when Correct Answer Products have reasonable stable demand Your Answer Products are not required in large quantities Multiple Choice Multiple Answer Question Which of the following charts are used for the recording of data during the method study? Correct Answer Operation process chart , Multiple activity chart , Flow process chart Your Answer True/False Question Operation process chart , Multiple activity chart , Flow process chart The operator should not stop production if first piece is not approved by the inspector. Correct Answer False Your Answer False Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer introduction of new product Your Answer introduction of new product Multiple Choice Single Answer Question What do you mean by a single event which represents the joint completion of more than one activities? Correct Answer Merge event Your Answer True/False Merge event Question Correct Answer The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. True Your Answer True Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Fulkerson's Rule Your Answer Juran's Rule True/False Question Correct Answer In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. True Your Answer True True/False Question All activities lying on the non-critical paths must have total float and free float. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Fixed position layout Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Multiple Choice Single Answer Question How industry has responded to the fact of existence of inherant variability of the manufacturing process? Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Job cards , Progress cards , Network updating True/False Question Correct Answer In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. False Your Answer True Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Cracks , Burrs , Texture Your Answer Cracks , Burrs , Texture Match The Following Question Correct Answer Your Answer Scheduling Device Strings Strings Interruption for machine utilisation Preventive maintenance Preventive maintenance Input for scheduling Overlapping of operations Critical Path Analysis Technique of scheduling Critical Path Analysis JIT Multiple Choice Multiple Answer Question Which are the three distinct parts of the chart? Correct Answer Summary , Introduction , Body Your Answer Summary , Introduction , Analysis Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer Flow of material , Equipment utilization , Working condition Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Acceptable quality level Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material Your Answer Commercial standards , Assembly and testing instructions , Bill of material Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Flow chart True/False Question Latest finishing date is the latest event time of the tail event. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk