LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
The ________ must ensure that the product satisfy the
functional requirements of it's usage.
Correct Answer Quality of design
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which of the following information is available in
summary of part in a chart during methods study?
Correct Answer Frequency of each symbol , Total time for each symbol ,
Total distance travelled by the object
Your Answer
Frequency of each symbol , Total time for each symbol
True/False
Question
The event numbers as far as possible reflect the logical
relationships of the activities.
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
Which varaible is taken along the ordinate or Y axis?
Correct Answer Quality
Your Answer
Quality
Multiple Choice Multiple Answer
Question
Which of the following schedules are recommended to
prepare and follow as a part of preventive maintenance
system?
Correct Answer Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication schedule
Your Answer
Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication schedule
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some
maintenance related characteristics by making use of
human senses, when equipment is in operation?
Correct Answer Extrernal inspection
Your Answer
Extrernal inspection
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a
network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer
Thick Line , Red Line , Double Line
Multiple Choice Multiple Answer
Question
What are the benefits of overhauling?
Correct Answer It increases useful life of an equipment and it's parts ,
Advance planning allows to attend equipment without
disturbing the production programme , Advance planning
allows to prepare and keep ready the list of replacement
spares
Your Answer
It increases useful life of an equipment and it's parts ,
Advance planning allows to attend equipment without
disturbing the production programme , Advance planning
allows to prepare and keep ready the list of replacement
spares
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Line Layout
Product Layout
Line Layout
Shop layout
Process Layout
Functional Layout
Functional Layout
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while
selecting or rejecting a particular site from legislation and
taxation point of view?
Correct Answer Labour laws , Building codes , Policies regarding issue of
licences
Your Answer
Labour laws , Building codes , Policies regarding issue of
licences
Select The Blank
Question
The ________ is the maximum percentage defective that
for the purpose of sampling inspection can be considered
satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Multiple Answer
Question
Major contributors in the development of Control Charts,
Sampling plan are
Correct Answer F H Dodge , H G Roming , Walter Schewhart
Your Answer
F H Dodge , H G Roming , Walter Schewhart
True/False
Question
Skill of labour force in a product type layout is usually
higher than in the process type of layout
Correct Answer False
Your Answer
True
True/False
Question
Repetitive movements between work stations which are
difficult to be traced on string diagrams can be
conveniently shown on flow diagrams.
Correct Answer False
Your Answer
True
Select The Blank
Question
The ________ is necessary when the job requires
detailed of one or more of the job characteristics with the
help of special equipment which is not available at the
producing company.
Correct Answer Inspection order
Your Answer
Job card
Multiple Choice Multiple Answer
Question
Which of the following cases can be referred as operation
in method study recording?
Correct Answer Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristic
Your Answer
Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristic
Select The Blank
Question
The ________ is the maintenance work initiated on a
result of knowledge of the condition of an item from
routine or continuous checking.
Correct Answer Condition monitoring
Your Answer
Overhauling
True/False
Question
All activities lying on the non-critical paths must have total
float and free float.
Correct Answer False
Your Answer
False
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
Method
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity Cc
Cc
Normal time of an
activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an
activity
Cn
Cn
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled
and unskilled labour can be available , Plant expansion is
easier due to less or no restriction for building and
construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled
and unskilled labour can be available , Plant expansion is
easier due to less or no restriction for building and
construction
True/False
Question
In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated,
upper and lower statistical limits are worked out and
inserted into a chart.
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
Which of the following is the criteria for the percentage
defectives in the zone of the indecision?
Correct Answer Lots having the percentage defective more than AQL but
less than LPTD
Your Answer
Lots having the percentage defective less than AQL but
more than LPTD
Select The Blank
Question
The easiest way to bring the delayed job within the
promised delivery time by using extra shift or weekly
holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost
required to complete an activity within it's crashed time?
Correct Answer Crash cost
Your Answer
Crash cost
Multiple Choice Single Answer
Question
In case of Batch Production which kind of labour is
expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer
Semiskilled
Multiple Choice Multiple Answer
Question
Which three of the following are causes of continuous
upward pattern of Xbar-R control chart?
Correct Answer Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
Your Answer
Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
True/False
Question
Root cause of most of the breakdowns is failure of the
lubrication system.
Correct Answer True
Your Answer
True
True/False
Question
It is not necessary to know spare time available on the
non-critical path to allow a little delay for noncritical
activity.
Correct Answer False
Your Answer
False
True/False
Question
MRP software generates time periodwise requiremetn of
subassemblies
Correct Answer True
Your Answer
True
True/False
Question
In case of two handed process chart, the simultaneous
activities of both hands are recorded opposite to each
other on the chart.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by CPM?
Correct Answer Critical Path Method
Your Answer
Critical Path Method
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work
centre , Performance standards
Your Answer
Overlapping of operations , Effective Capacity per work
centre , Performance standards
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer
Over ordering , under ordering , stockouts
Multiple Choice Single Answer
Question
What do you mean by the verification of object against
predetermined standards of quality or quantity or both?
Correct Answer Inspection
Your Answer
Inspection
Multiple Choice Multiple Answer
Question
What are the advantages of templates over diagrams?
Correct Answer Can be conveniently moved on the graph paper , Less
laborious , Saves time
Your Answer
Can be conveniently moved on the graph paper , Less
laborious , Unskilled person can do and analyze it
True/False
Question
It would not affect the project completion time if noncritical activities take little loner time than planned.
Correct Answer True
Your Answer
True
Select The Blank
Question
The ________ is the probability that a good lot will be
rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose
of making any product/s is called
Correct Answer Factory
Your Answer
Factory
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that
accpets all the lots with quality equal to or better than
AQL .
Correct Answer Rectangular
Your Answer
Bell
Multiple Choice Single Answer
Question
Which is the right time to prepare stores issue order?
Correct Answer When route sheet is ready
Your Answer
When route sheet is ready
Multiple Choice Single Answer
Question
Which element of a network represents a task which has
got a definite beginning and definite end?
Correct Answer Activity
Your Answer
Activity
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some defects
in moving parts, internal cracks, and others , when
machine is under preplanned shutdown?
Correct Answer Internal inspection
Your Answer
Internal inspection
Select The Blank
Question
Production Planning is a centralised activity which
includes functions such as ________
Correct Answer Scheduling
Your Answer
Dispatching
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect
the quality of end product are regulated to the extent
desirable.
Correct Answer Quality control
Your Answer
Quality control
Select The Blank
Question
Goods after final inspection should accompany
________to enable dispatch department to identify and
draw correct reference.
Correct Answer Forwarding note
Your Answer
Forwarding note
Multiple Choice Single Answer
Question
Who has introduced the useful concept of control chart in
1931?
Correct Answer Walter Shewhart
Your Answer
Walter Shewhart
Download