LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question Flow process charts do record movements as well as visual pictures. Correct Answer False Your Answer False True/False Question The OC curve is based on the assumption that if the lot is large in comparison to the sample, the probabilities of the OC curve will follow a poisson distribution. Correct Answer False Your Answer True Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Work order , Purchase order Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Preventive maintenance Match The Following Question Correct Answer Scheduling of interrelated Critical Path Analysis activities of small projects with consideration of uncertainty of duration of Your Answer Critical Path Analysis activities. Two machines & Johnson's Two Machine processing time depends Algorithm on sequence of job loading Johnson's Two Machine Algorithm Sufficient orders and resonable choice of machines Index Method Index Method Time relationship between Critical Ratio Scheduling when a product is required and when it can be made available Time series Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer easier Match The Following Question Correct Answer Your Answer When to inspect Stages of inspection Specification What to inspect Specification Standard How to inspect Inspection devices Tools & Jigs How much to inspect Sampling or cent percent Stages of inspection inspection Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Rectangular Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Preparation of material estimates Your Answer Preparation of material estimates Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost True/False Question In case of X bar-R charts, statistical limits are calculated from averages of samples of n (4,5,…) instead of single sample of large size to reduce the spread of natural variability. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Fixed position layout , Virtually zero manufacturing cycle time Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Low Productivity Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Your Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity True/False Question Shape od an OC curve is a function of sample size and the acceptance number. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Predictive Maintenance , Shutdown Maintenance True/False Question For p-chart, "Inspection by variables" is much faster than "Inspection by attributes" Correct Answer False Your Answer True Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Partial True/False Question Cent percent inspection is a must if the inspection is of destructive nature. Correct Answer False Your Answer False True/False Question Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." Correct Answer False Your Answer True Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Standard deviation Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material Your Answer Production schedule , Commercial standards , Assembly and testing instructions Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies Your Answer Method Study True/False Question An ideal OC curve is never possible only with cent percent inspection. Correct Answer False Your Answer False Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Producer's risk Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working True/False Question The operator should not stop production if first piece is not approved by the inspector. Correct Answer False Your Answer False Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Conversion Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Thick Line , Red Line , Double Line Your Answer Dotted line Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Control board Multiple Choice Single Answer Question What do you understand by PERT ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of conformance , Purpose of product , Quality of design Your Answer Purpose of product , Process specifications , Quality of design Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk Multiple Choice Single Answer Question What do you mean by the project duration for which the total cost is minimum? Correct Answer Optimum duration Your Answer Optimum duration True/False Question Originating process of raw material influence Process Planning Correct Answer True Your Answer True