What is indicated by the hugging points lying close to mean of the process in X bar-Rcontrol chart?
Correct Answer Recording done without actual measurements , Improper selection of samples , Biases
in measurements
Your Answer
Improper selection of samples , Biases in measurements , Recording done without
actual measurements
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer
Deifinite , Undesrstandable , Economically viable
Match The Following
Question
Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Reorder level
Symptom of ill planned
purchasing
Over ordering
Over ordering
Factor influencing material
planning
Lead time
Lead time
Net requirement of material under Stock on hand
MRP
Stock on hand
Multiple Choice Multiple Answer
Question
What are the benefits of inspection and quality control?
Correct Answer Adequate maintenance of quality , Ensures parts are within specified limits of accuracy ,
Gives economy in production through reduction of defective work
Your Answer
Adequate maintenance of quality , Ensures parts are within specified limits of accuracy ,
Gives economy in production through reduction of defective work
Select The Blank
Question
The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and
preventive
Correct Answer Preventive Maintenance
Your Answer
Preventive Maintenance
Multiple Choice Single Answer
Question
What do you mean by design modifications made to reduce time and effort required in
carrying out maintenance work ?
Correct Answer Design-in Maintenance
Your Answer
True/False
Question
Design-in Maintenance
Even in a small set up wherein maintenance of a machine is looked after by a mechanic
cum worker, he should report directly to the person responsible for the manufacturing
operations.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following technique makes three time estimates for each activity?
Correct Answer Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Select The Blank
Question
A set of activities to keep an equipment in the specified condition is called as ________.
Correct Answer Maintenance
Your Answer
Maintenance
Multiple Choice Multiple Answer
Question
Which of the following are characteristics of an operating characteristics curve?
Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level
Your Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Multiple Choice Multiple Answer
Question
Which three of the following are causes of continuous upward pattern of Xbar-R control
chart?
Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Your Answer
Wear of tool , Untrained operator , Abnormal rise in temperature
True/False
Question
Inspection should be conducted on all incoming materials, semifinished items, bought
out components, subcontract items prior to any operation, assembly.
Correct Answer True
Your Answer
True
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producing
company.
Correct Answer Inspection order
Your Answer
Inspection order
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer
Over ordering , under ordering , stockouts
True/False
Question
Since value of c can never be negativee, hence" if LCLp works out to be negative, it is
taken as zero."
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
What do you understand by the quality specified by the designer on behalf the
customer?
Correct Answer Quality of design
Your Answer
Quality of design
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
Time and Motion
True/False
Question
Maintenance function must be decentralised apart from a size of a manufacturing
organisation for it's better functioning.
Correct Answer False
Your Answer
False
True/False
Question
Repetitive movements between work stations which are difficult to be traced on string
diagrams can be conveniently shown on flow diagrams.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
Which method is used to trace especially those movements which are too fast for
human eye to pursue?
Correct Answer Cyclegraph
Your Answer
Cyclegraph
Match The Following
Question
Correct Answer
Your Answer
Template
Two dimensional cutouts
Two dimensional cutouts
REL chart
Degree of closeness
Degree of closeness
Flow diagram
Tracing movements
Tracing movements
Travel chart
Distance and frequency of
movements
Distance and frequency of
movements
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal
to or better than AQL .
Correct Answer Rectangular
Your Answer
Rectangular
Multiple Choice Single Answer
Question
What does the points falling outside the control limits indicate?
Correct Answer Presence of assignable causes
Your Answer
Presence of chance causes
Multiple Choice Multiple Answer
Question
Which information is recorded in an equipment card?
Correct Answer Date of commissioning , Equipment specifications , Name and address of manufacturer
Your Answer
Date of commissioning , Equipment specifications , Name and address of manufacturer
True/False
Question
Inspection should be avoided prior to long run of a manufacturing stage as it becomes
duplication of work and cost.
Correct Answer False
Your Answer
False
True/False
Question
Delay in completion of projects result in unwelcome additions to the fixed
manufacturing expenses.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer Production Planning
Your Answer
Production Planning
Multiple Choice Single Answer
Question
Which of the following policies is advisable in case of low product variety and large
volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer
Low Skilled Labour & Special Purpose Machines
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
Correct Answer 0.01 to 10%
Your Answer
0.01 to 10%
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer Dependent and independent
Your Answer
Dependent and independent
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated and new
trial control limits for the remaining points are computed.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer
Storage space , Machines , Material Handling Equipment
Multiple Choice Single Answer
Question
What is the location of upper control limit in the X bar-R control chart?
Correct Answer 3 standard deviations above central line
Your Answer
3 standard deviations above central line
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
True/False
Question
While numbering as per Fulkerson's rule, arrows emerging from the initial event are
deleted so as to create one or more initial events.
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
Why stores issue order should not be issued as soon as it is prepared?
Correct Answer Material may or may not be available at the time of preparation
Your Answer
Material may or may not be available at the time of preparation
Multiple Choice Single Answer
Question
Which characteristics are verified in cent percent sampling?
Correct Answer All important characteristics
Your Answer
Only characteristics related to performance
Select The Blank
Question
An ________ history card is the record of all repairs, replacements and engineering
changes carried out in the equipment during it's period of service.
Correct Answer Equipment history card
Your Answer
Equipment history card
Multiple Choice Multiple Answer
Question
Features of Cellular layout are
Correct Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped
in to cells
Your Answer
It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped
in to cells
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer
Poor Customer Service
Multiple Choice Multiple Answer
Question
Which of the following factors affect the quality control function?
Correct Answer Quality of workmanship , Production aids , Manufacturing facilities
Your Answer
Quality of workmanship , Competitive prices , Manufacturing facilities
Multiple Choice Multiple Answer
Question
Which of the following situations demand the economic consideration while selecting a
job for method study?
Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many
suggestions received for improvement from a department or section
Your Answer
Unorderly movement of men and materials , Excessive process defectives , Too many
suggestions received for improvement from a department or section
True/False
Question
Systematic maintenance system can completely eliminate the wear and tear of
machines.
Correct Answer False
Your Answer
False
Select The Blank
Question
Capacity decisions have a direct influence on performance of production system in
respect of ________
Correct Answer Delivery performance
Your Answer
Delivery performance
Select The Blank
Question
The ________ must ensure that the product satisfy the functional requirements of it's
usage.
Correct Answer Quality of design
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance