POM assgn : Parmeet True/False Question Objective of Work Study is to improve Productivity Correct Answer True Your Answer True True/False Question After goods have been manufactured, route sheets and operation layouts should not be collected back. Correct Answer False Your Answer False Multiple Choice Single Answer Question How is the probability of acceptance in case of Acceptable Quality Level (AQL )? Correct Answer Very high Your Answer Very high True/False Question For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives. Correct Answer False Your Answer False Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Time Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Highly Skilled Your Answer Highly Skilled Multiple Choice Multiple Answer Question Which are the general principles underlying probability aspects of project planning? Correct Answer Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Your Answer Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications Match The Following Question Correct Answer Your Answer Bottom compartment of control board Bunch of work orders arranged in Bunch of work orders arranged in a a sequence in which they are to sequence in which they are to be be processed. processed. Control board Pictorial view of machine loading activity Pictorial view of machine loading activity Top compartment of control board Work order of item currently being worked on the machine Work order of item currently being worked on the machine Middle compartment of control board Work order of item to be processed next on the machine Work order of item to be processed next on the machine Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One Multiple Choice Single Answer Question Which is the right time to prepare stores issue order? Correct Answer When route sheet is ready Your Answer When route sheet is ready Multiple Choice Single Answer Question What is the reason of excessive friction between parts? Correct Answer Improper or lack of lubrication Your Answer True/False Question Improper or lack of lubrication Cellular layout is based on the concept of Group Technology Correct Answer True Your Answer True Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Thick Line , Red Line , Double Line Your Answer Thick Line , Double Line True/False Question The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Shop order Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Single Answer Question Inherent Safety' is one of the principle of good layout. In context of layout, this can be achieved by the following Correct Answer Clear gangway, location of material and material handling system Your Answer Safety training Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact Multiple Choice Single Answer Question How much time does the dummy activity take? Correct Answer Zero Time Your Answer Zero Time Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question What does tail of an arrow represent? Correct Answer Start of an activity Your Answer Start of an activity Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are the most suitable cases where we can use CPA as effective technique of scheduling? Correct Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. Your Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer True/False Question Forwarding note The steeper the OC curve, the better is the discrimination between good and bad lots. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing? Correct Answer Visual Testing , Eddy current , Magnetic flow detectors Your Answer Visual Testing , Eddy current , Magnetic flow detectors Multiple Choice Multiple Answer Question Which are the different types of flow process charts used for method study? Correct Answer Equipment type , Man type , Material type Your Answer Equipment type , Man type , Material type Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Cyclograph Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time True/False Question Use of accurate measuring instruments and better supervision for inspectors is not possible in case of floor inspection as compared to centralised inspection system. Correct Answer True Your Answer True True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements True/False Question Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting customer demand Correct Answer False Your Answer True/False Question True All activities lying on the non-critical paths must have total float and free float. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following method can be adopted to overcome the problem of rushing up a job for it's timely completion? Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting Your Answer Use of optimum speeds and feeds , Subcontracting , Job splitting Multiple Choice Single Answer Question Which of the following data is unnecessary for scheduling process? Correct Answer Cost breakup of products Your Answer Cost breakup of products Multiple Choice Multiple Answer Question Which of the following are the major steps of making of the X bar-R control chart? Correct Answer Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart Your Answer Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart