Part 1 ITEM NO. ___________________________________________________________________ REPORT OF THE STRATEGIC DIRECTOR FOR SUSTAINABLE REGENERATION ___________________________________________________________________ TO THE LEAD MEMBER FOR PROPERTY ON 25 MAY 2010 ___________________________________________________________________ TITLE: REPLACEMENT WINDOWS AND ASSOCIATED WORKS AT SWINTON TOWN HALL, CIVIC CENTRE, CHORLEY RD, SWINTON M27 5BW ___________________________________________________________________ RECOMMENDATIONS: That the Lead Members for Property and Customer and Support Services: 1. Approve the target cost estimate of £352,157.06 from the partnering contractor Warden Construction Ltd 2. Approve the fees at £21,129.42 EXECUTIVE SUMMARY: The replacement of the existing timber framed windows in the Civic Centre with high ‘u’ value UPVC windows will reduce the Council’s carbon foot-print and reduce the ongoing maintenance cost. A budget quotation has been received for the carrying out of the above works and it is proposed that the quotation be accepted. ___________________________________________________________________ BACKGROUND DOCUMENTS: None (Available for public inspection) ___________________________________________________________________ KEY DECISION: YES ___________________________________________________________________ DETAILS: 1.0 BACKGROUND 1.1 This essential work to the exterior of this accommodation is part of the on going Backlog Maintenance Programme. 1.2 Replacement of timber Georgian sash windows to high “U” value UPVC will reduce the council’s carbon footprint and eliminating expensive maintenance in the external painting programme. D:\219514020.doc 1.3 The new windows will be identical in appearance and have been approved by the planning officer. 1.4 The associated works include over laying the asphalt roof, and replacement of glazed roof lights. In addition, whilst the building is being scaffolded it will be prudent and cost effective to undertake the cleaning of the building lime stone and features on the clock tower, paint rainwater goods and clear and repair parapet gutters. 2.0 PROPOSALS 2.1 A Budget quotation was sought from the following Company: Warden Construction Ltd, Preston. 2.2 It is proposed to exclude the replacement of the windows in the council chamber from this contract and undertake that work in association with the refurbishment the council chamber in order that any change in window design required by the refurbishment scheme can be accommodated. 2.3 The cost will be £352,157.06 plus fees of £21,129.42 giving a total of £373,286.48. 2.4 The total allocation in the programme for the windows roof and roof lights, including fees was £332,080. The extra cost will be managed within the delivery of the developing three year backlog maintenance programme. 3.0 FINANCIAL IMPLICATIONS 3.1 This cost will be funded from the Backlog Maintenance Programme 2009/10. 4.0 CONCLUSIONS 4.1 Acceptance of the quotation will allow the works to proceed within the projected/proposed timescale. ___________________________________________________________________ KEY COUNCIL POLICIES: Asset Management Strategy ___________________________________________________________________ EQUALITY IMPACT ASSESSMENT AND IMPLICATIONS: Provision of the highest quality office space is essential to allow the best office accommodation for staff. ___________________________________________________________________ ASSESSMENT OF RISK: Low ___________________________________________________________________ SOURCE OF FUNDING: Backlog Maintenance Programme 2009/10 ___________________________________________________________________ D:\219514020.doc LEGAL IMPLICATIONS – There are no legal implications. Procurement processes have been followed. ___________________________________________________________________ FINANCIAL IMPLICATIONS: Supplied by John Spink, extension 3230 Comments: Included within the Back Log Maintenance Programme for 2009/10 ___________________________________________________________________ OTHER DIRECTORATES CONSULTED: These works have been consulted on with a variety of different stakeholders including Development Control, Senior Council Officers and relevant Lead Members. ___________________________________________________________________ CONTACT OFFICER: D Lyon (Urban Vision) TEL. NO. 0161-779-4971 ___________________________________________________________________ WARD(S) TO WHICH REPORT RELATE(S): Swinton North Press Release.doc D:\219514020.doc