Part 1 Item 4 ______________________________________________________________ REPORT OF THE LEAD MEMBERS FOR HOUSING AND FOR PLANNING ______________________________________________________________ TO: REGENERATION INITIATIVES CABINET WORKING GROUP ON 1st OCTOBER 2007 ORDSALL AND LANGWORTHY LOCAL EXECUTIVE ON 2ND OCTOBER 2007 ORDSALL AND LANGWORTHY COMMUNITY COMMITTEE ON 6TH NOVEMBER 2007 ______________________________________________________________ TITLE: ORDSALL DEVELOPMENT FRAMEWORK: PROGRESS REVIEW ______________________________________________________________ RECOMMENDATIONS: That the report be noted. ______________________________________________________________ EXECUTIVE SUMMARY: It is approaching three years since the Development Framework for Ordsall was endorsed as the basis for future regeneration work in the area. The report records the progress made to date on implementing the Framework, identifies threats and new opportunities that may affect future work checks that the Framework principles remain valid. ______________________________________________________________ BACKGROUND DOCUMENTS: ______________________________________________________________ ASSESSMENT OF RISK: Medium. Delivery of the regeneration programme is dependant on the market success of the proposed new development. ______________________________________________________________ SOURCE OF FUNDING: The capital income from proposed sales plus section 106 monies will pay for the proposed infrastructure works. ______________________________________________________________ LEGAL IMPLICATIONS: Reviewed by Michelle O’Reilly. ______________________________________________________________ FINANCIAL IMPLICATIONS: Reviewed by Peter Butterworth. Appropriate revenue funding will need to be identified to adequately maintain the enhanced facilities to be maintained by the council; the costs have yet to be identified and will be reported in due course. 1 COMMUNICATION IMPLICATIONS: There is frequent feedback to local residents through Community Forum and newsletters. LPC Living take the lead in promoting the area to prospective new residents. VALUE FOR MONEY IMPLICATIONS: N/A PROPERTY: Implications for the council’s service property will need to be included in relevant Service Property Strategies and the corporate Asset Management Plan ______________________________________________________________ HUMAN RESOURCES: N/A ______________________________________________________________ CONTACT OFFICERS: Barry Whitmarsh, Housing and Planning Directorate. 793 3645 Ross Spanner, Neighbourhood Manager. 603 4090 Christine Duffin, Salix Homes. 779 8991 Phil Holden, Urban Vision Partnership. 779 6069 Simon Ashdown, LPC Living. 872 2622 Jonathan Drake, LPC Living. 786 8468 ______________________________________________________________ WARD TO WHICH REPORT RELATES: Ordsall ______________________________________________________________ KEY COUNCIL POLICIES: Enhancing Life in Salford Giving residents in the city a choice of quality housing to meet their needs Promoting sustainability through appropriate development, conservation and improvement of the city’s environment Creating Prosperity in Salford Promoting the city as a location of choice for people and investment Maximising public and private investment to regenerate the city ______________________________________________________________ 2 ORDSALL DEVELOPMENT FRAMEWORK PROGRESS REVIEW 1 INTRODUCTION 1.1 It is approaching three years since the Development Framework for Ordsall was endorsed as the basis for future regeneration work in the area. 1.2 The purpose of this report is to record the progress made to date on implementing the Framework, identify threats and new opportunities that may affect future work and to check that the Framework principles remain valid. 2 BACKGROUND 2.1 In March 2003, the city council entered into a partnership with developer Legendary Property Company (LPC), to develop proposals for the regeneration of the Ordsall estate, based on the redevelopment of vacant and underused land in council ownership. 2.2 The Development Framework for Ordsall was prepared by BPTW architects, on behalf of the council and LPC. BPTW carried out survey and consultation work, including a walking audit of the estate. An exhibition of their ideas for the area was held in April 2004, at Ordsall Hall. Over 300 people attended the exhibition and 40 people completed and returned questionnaires. The proposals generally received overwhelming support. 2.3 Ordsall Langworthy Community Committee and the council cabinet formally endorsed the Framework in October and November 2004. 2.4 The framework set out proposals for the use of vacant land in the area and for improvements to roads and footpaths, parks and open spaces and community facilities. The document was not intended to be a blueprint for the development of any particular site. It proposed a number of environmental and infrastructure improvements that would benefit the estate, identifies sites suitable for development, set out key principles to guide development and illustrated possible building footprints. 2.5 In summary, the key proposals were: Environmental and infrastructure improvements throughout the estate. New development on currently vacant land. New development to create natural surveillance to new and existing streets. Improve ease of access through estate. New primary school and children’s centre. New retail centre on Trafford Road. o o o o o o 3 o New community facilities. o New houses and apartments, with an emphasis on family housing and affordability to existing Ordsall residents. o Longer-term opportunity for mixed development on Ordsall Riverside. 2.6 Key Issues The reports to community committee and cabinet in 2004 identified five key issues that would affect the success of the Framework. 2.7 The number of new dwellings to be built and their type and tenure, needed further discussion. In 2004, there were around 2,000 dwellings in the Ordsall estate, most of which were social rented. Planning permission had recently been granted for over 1,000 new apartments, on Trafford Road and Ordsall Lane, which were expected to be for private sale. 2.8 The development framework did not specify a proposed number of new dwellings. BPTW considered that up to 1,300 new properties could potentially be accommodated within the estate; however this figure would only be achieved if all the available sites were developed and a high proportion of apartments built. In practice, the number of new dwellings was expected to be lower: between 500 and 800, including as many affordable family houses as practical. This figure excluded LPC Living’s Quay 5 development, which had already received planning permission. 2.9 The framework concentrated on the main Ordsall estate, but also illustrated the potential for mixed-use redevelopment of the existing industrial and commercial area on Ordsall Riverside, and creation of a new footbridge over the Canal to the Cornbrook Metrolink stop. However, development of this area was seen as a lower priority than completing regeneration of the existing estate. 2.10 The framework plan indicated several alternative locations for public services, such as health and community facilities. The site for a new primary school was decided. However, further work was needed to determine the scale of other community buildings needed to serve the growing population of the estate and of Salford Quays. Once the scale of service provision was decided, it was recognised that there would need to be further debate with service providers and residents on the location of facilities. Potential tensions were recognised between the benefits of co-locating services (for example, on a community campus centred around the school and proposed Trafford Road shops) and the benefits of dispersing services across the estate. 2.11 The size and location of play areas and open spaces would need careful consideration. The framework illustrated a level of provision that is consistent with the council’s emerging open space strategy. However, some play areas were shown located very close to existing dwellings, which could cause neighbour nuisance. It was noted that 4 existing residents might argue for the retention of some of the areas of open space shown as being developed. 2.12 2.13 The proposal to open up a new east-west road between Trafford Road and Ordsall Lane and to improve the existing north-south pedestrian route needed careful design in detail. It is important that they do not become used for rat-running, encourage fast traffic or create insecure escape routes from crime scenes. The Partnership Agreement and Infrastructure Budget The formal legal agreement between the city council and LPC Living was completed in May 2006. 19 potential sites were identified for development within the area, ranging from small infill sites to substantial proposals on the Radclyffe, St Clements, Hulton Street and Ordsall District centre sites. 2.14 The agreement gives LPC Living the exclusive right to submit development proposals for these sites for a fixed period, with a deadline in May 2011. Development of approved schemes could continue for several years after 2011. 2.15 The council are committed to reinvesting capital receipts in the Ordsall area. It was estimated, at that time, that potential receipts from these sites, including anticipated section 106 monies could realise an investment fund for infrastructure works totalling £7.615 Million. This total included both anticipated S106 contributions from partnership projects and a proportion of contributions from other developers’ schemes in the surrounding area. Current forecasts are set out at paragraph 3.28. 2.16 An indicative programme of infrastructure works was identified, with the majority of funds allocated to: Highways works: specifically the East- West vehicle route and the North –South pedestrian link. Public open space improvements and environmental enhancement Contribution to the costs of constructing the new primary school and children’s centre Acquisition of land and premises to secure development sites. o o o o 3 PROGRESS TO DATE Consultations 3.1 Following the original consultation on the emerging Framework, in April 2004, the council and LPC have jointly held six further consultation events, regarding implementation of individual aspects of the Framework: o Options for sites in South Ordsall -July 2005. o Proposals for development of vacant site at Hulton Street – December 2005. 5 o Draft proposals for Radclyffe School and District centre sites, health service issues and aspirations for public services – October 2006. o Proposals for development of site at Robert Hall Street – April 2007. o Design workshop on refurbishment of Monmouth Park –June 2007. o Proposals for the conversion of St Ignatius Church to housing and development of the adjacent Croft site –July 2007. 3.2 There have also been consultations regarding the Masterplan for Ordsall Park. 3.3 Attendance at the individual events has been varied, only 17 people attending the Hulton Street event. Various attempts have been made to maximise participation at subsequent events, including the use of a mobile consultation run by Ordsall Community Arts. This has proved successful with 261 people visiting the October 2006 event. 3.4 Overall, the various consultation events have indicated a broad level of support to the individual proposals. Only one proposal has attracted significant local opposition: a proposal to redevelop the site of former shops on Paris Avenue with low cost housing (and that opposition was not identified by the South Ordsall consultation event); development options for that site have been deferred for further consultation. 3.5 Consultation will continue to be held as and when individual projects are being considered. 3.6 Development Progress Quay 5: Predating the Development Agreement, and launched in January 2005, Quay 5, consists of 231 one and two bedroom city style apartments. The scheme sold out within 6 weeks of the launch. Aimed at First Time Buyers, prices started at £79,950 and included a secure car parking space and a concierge service. The design of the scheme introduced a totally new style to Ordsall showing it as a place on the move upwards. 3.7 Primrose Hill Community Primary School and Children’s Centre: Outline planning permission for a new primary school and children’s centre, to replace the existing Radclyffe and St Clements’s Schools and the family centre, was granted in December 2004. The building is nearing completion and will open in September 2007. 3.8 Radclyffe Mews: Planning permission for development of the former Chetham Close flats and day nursery sites was granted in September 2006. Located overlooking the Grade 1 listed Ordsall Hall, it is anticipated that this development of 34 new homes will be completed in the autumn of 2007. Consisting of three 2 bed apartments and thirty one 2 and 3 bed townhouses, the development was sold off-plan in just 8 weeks at the end of 2006 primarily to residents who lived or worked in the M5 postcode area. 6 3.9 Prices for a 2 bed apartment started at £99,000, for a 2 bed townhouse £117,950 and for a 3 bed townhouse £136,950. 3.10 Hulton St: Planning permission for development of the neglected open space and sites of Collingburn Court and Park House, north of Ordsall Park, was granted in April 2007. Construction of this scheme is expected to start in late September 2007. When completed, it will include 260 new homes as well as a tree-lined boulevards and a new square. It is located overlooking Ordsall Park and it is hoped will encourage more people to use this important green space. 3.11 The development will be built in five phases and will consist of a mixture 1,2 and 3 bed apartments and 3 and 4 bed townhouses. The design is very contemporary and the completed scheme will be unique within Ordsall providing a benchmark for all future schemes to follow. 3.12 Robert Hall Street: LPC are currently finalising proposals for the redevelopment of the site of the existing Family Centre and adjacent vacant site, following the consultation event in April 2007. Subject to approval of the Development Proposal Notice and planning consent, this proposed development will introduce 22 new family homes onto land currently considered an eyesore and magnet for anti-social behaviour. It will also help to introduce traffic calming measures to Robert Hall Street as well as providing new frontage to this section of the road. 3.13 St Ignatius Church: LPC have carried out feasibility studies on the conversion of the redundant church and rectory into dwellings. Neither building is in council ownership. However, such a scheme is not financially viable in isolation and consideration is being given to also developing the neighbouring croft, which is in council ownership, to cross-fund works to the church, which is an important local landmark. Public consultation on the proposals is currently being carried out. 3.14 Radclyffe School Site: The next large site to be developed is due to be the former site of Radclyffe School. The Framework identifies this as the site for new retail facilities, replacing the run down District Centre. Following the consultation event in October 2006, LPC are developing detailed proposals for a scheme including shops and residential accommodation. The school closed at the end of the summer term and arrangements are currently being made to demolish the redundant buildings. It is anticipated that development proposals will be submitted to the council later this year with the target of starting redevelopment in summer 2008. 3.15 Remaining Council–owned Sites: There are two other large sites scheduled for redevelopment: the sites of the existing District Centre and St Clements School. LPC are currently carrying out stakeholder consultation and feasibility studies for these sites. The district centre site is the agreed preferred location for a new community hub, 7 replacing the existing health centre and library, and would also include new housing, as well as retaining the British Legion. The St Clements’s School site would be redeveloped for housing. 3.16 The District Centre remains of poor appearance and detracts from the appearance of the area. LPC intend submitting an outline planning application for its redevelopment later this year, in order to demonstrate commitment to its redevelopment. However, submission of a Development Proposal Notice to the council for a detailed scheme will not happen until there has been further public consultation. 3.17 There are also several smaller redevelopment sites across the estate, with no firm programme for consultation and design development. 3.18 Development by Third Parties: The scale of development implemented under the Development Agreement is small compared to the scale of recent development in the area by other developers. Apartment developments have recently been completed, or are nearing completion, at the Quays campus site on Trafford Road and on sites on Ordsall Lane. 3.19 Updated Framework Drawing: The original Framework drawing has been amended to reflect new developments completed, underway and committed. A copy is attached. 3.20 Infrastructure Progress The main commitments to the partnership infrastructure budget so far are a contribution of £2.3 million to the cost of the new primary school and highway works, to a value of some £2.6 million, associated with the housing developments at Taylorson Street and Hulton Street. 3.21 Improved Through Routes: The agreed highway works include the first phases of works to enhance the north-south pedestrian and cycle route through the estate, currently under construction, and to create a potential new east-west vehicular route, to be constructed as part of the Hulton Street development. 3.22 Mini sweeper: One of the conclusions from the first consultation in 1994 conducted by the Salford City Council and LPC Living partnership was the concern by local residents over the amount of litter on the estate. The result was the funding through the Development Framework of an extra street sweeper, known locally as the ‘Ordsall Litter Bug.’ 3.23 Earlier this year, children from the three primary schools were invited to create a design for this street sweeper and the result is now seen every Monday, Wednesday and Friday helping to keep the streets of Ordsall clean. Councillor Maureen Lee said of this initiative: “This is a great example of how environmentally conscious young people can be at the heart of a regeneration initiative. It also shows tremendous creativity 8 and the striking litter bug design brings real character to our street cleaning activity.” 3.24 This is just the start of a campaign to help clean up the streets of Ordsall. The ‘bug’ is to be used to spearhead a campaign to make Ordsall a litter free zone. Under the banner ‘Have you caught the litter bug?’ a series of initiatives are planned later this year to encourage local residents and children to minimise the amount of litter on the streets of Ordsall. 3.25 Other Works: The infrastructure budget has also contributed to the improvement of Regent Square Park and the River Irwell Walkway. The former Longford Church has been acquired and demolished to facilitate redevelopment of the District Centre site. 3.26 Future Infrastructure Works: As discussed below, the abnormal costs of remediating contamination on the Hulton Street site significantly reduced anticipated income, to the extent that implementation of the scheme requires cross-subsidy from other sites. 3.27 The current forecast is that the investment fund available for infrastructure works will be at least £7.0 Million. 3.28 Approximately £5.0 Million is effectively committed to date, relating to acquisitions, the contribution to the costs of the new Primary School, Regent Square Park improvements, highway works related to the two approved housing schemes and the mini sweeper. 3.29 The remaining priorities are further acquisitions, highway works, play areas and public open space improvements. It is currently anticipated that these remain affordable. 3.30 It is possible that the funds available will be higher than currently forecast, although this will depend on future market conditions and cannot be relied upon. 3.31 3.32 Use of Local Labour LPC have been in discussions with the Salford Construction Partnership in an attempt to maximise the benefits of local labour employment to all parties, especially the local residents. It is considered that, with the focus of regeneration in and around the Ordsall Ward, local residents are potentially missing out on opportunities to benefit from this, and LPC and SCP are keen to promote employment and training opportunities for the longer term, that are transferable to each new development. The costs associated with this are going to be injected by LPC (and other developers) direct, without affecting the individual developments, with costs estimated at being 1% of construction turnover per development. 9 4 4.1 REVIEW OF KEY ISSUES Number of New Dwellings The number of dwellings in the Ordsall estate has now increased to around 2,350, with the completion of apartment developments along Ordsall Lane and at Quays Campus (Quay 5, Lambas Court and Saltra). 4.2 There are an additional 1,100 apartments either under construction or with planning permission along Ordsall Lane and at Quays Campus, progressed outside the Partnership Agreement. 4.3 Planning permission has, so far, been granted for 290 dwellings on schemes within the Partnership Agreement (Radclyffe Mews and Hulton Street, providing 130 family houses and 160 apartments). 4.4 The current forecast: is that a total of 800 -1,000 new dwellings will be built under the Partnership Agreement (500 - 600 family houses and 400 - 500 apartments). 4.5 The total number of dwellings in Ordsall (including the estate and Riverside) is therefore forecast to rise to 4,450. This total does not allow for the grant of permission for any further dwellings outside the Partnership Agreement, which is most likely to happen at Ordsall Riverside, discussed below. 4.6 Ordsall Riverside The regeneration of the Ordsall Riverside Corridor has become a higher priority than envisaged in 2004. This is because of both sustained developer interest and its identification as a strategic priority by Central Salford Urban Regeneration Company. 4.7 The URC and council have commissioned consultants, Urban Initiatives, to prepare a masterplan for the Corridor. 4.8 The aim is create a mixed-use area that acts as a waterfront to the Ordsall estate and takes advantage of the Irwell City Park opportunities. The importance of the bridge link to Cornbrook is reiterated. The consultants suggest that the area could accommodate over 3,000 further dwellings. This is likely to predominantly be apartments, although over 600 family houses would be included. 4.9 The masterplan is to be used as the basis for a planning guidance document and there will, through consultation on that document, be scope for revision to these proposals. It is anticipated that the draft Planning Guidance will be published for consultation in January/February 2008. Formal adoption is anticipated in July 2008. 10 4.10 4.11 Although there is currently strong developer interest in some sites within the Corridor, the prospects for seeing such large-scale development are long term and less certain, compared to implementation of schemes under the Partnership Agreement. Affordable Housing The HMR team’s preliminary analysis of housing need and demand concludes that the Ordsall neighbourhood housing market supply is unbalanced and disproportionately weighted to terraced and flat property types, in addition to the social rented tenure. The low value and low turnover properties are occupied by a high number of families with a low income. 4.12 The analysis also indicates a need for affordable family housing for owner occupation within Ordsall. The affordability gap between Ordsall and Salford residents, as in much of the North West, is growing and is limiting opportunities for these people. The average house price in Ordsall is £102,016. However, this compares to £185,238 in the adjacent Salford Quays area and £146,346 in the Chapel Street areas. 4.13 The differences in property values when compared to income levels can be seen to create an affordability gap for residents of Ordsall and Salford. The average household income in Ordsall is £21,210, which equates to an affordability ratio of 5. The average household income in Salford is £30,400, which equates to an affordability ratio of 3. 4.14 The Framework recognised the need to provide a greater housing choice for both local people and new residents alike and emphasises the need to develop a mixed and balanced community that ensure a better social mix, by avoiding the creation of large areas of similar housing. 4.15 One of the original main aims of the Partnership was to address the imbalance in tenure and increase the level of home ownership in the area to bring it closer to National and Regional levels. The initial priority for provision of affordable housing was accordingly to assist in reducing the disparity between high and low value properties by providing opportunities for those families who wish to become home owners but may struggle economically without the support of a shared ownership model. 4.16 The Hulton Street scheme provides 52 affordable homes under an equity share model, which offers residents the opportunity to purchase the new properties at 75% of the value, with the remaining 25% payable after 10 years. 4.17 Discussions on the content of remaining phases of development have attempted to identify appropriate methods of introducing more of an affordable housing element into the development 11 4.18 LPC Living is able to extend the equity share model provided at Hulton Street to later phases. This model has the advantage of requiring no subsidy. 4.19 Other shared equity models, which offer a greater range of solutions that may be attractive to residents in the area, are also being explored. 4.20 Products on offer from Registered Social Landlords (RSLs) include lower ranges of equity share purchased via a mortgage (35% - 50%), with a rental charge of 2.75% on the remaining unsold equity. Additional benefits to the RSL model include: Recycling of funds to create affordable housing in the future Increased accessibility to a larger catchment population Opportunities for homeowners to increase their ownership share. 4.21 In order to give the broadest possible choice to residents it is preferable that a combination of the two models is brought forward. 4.22 Discussions are ongoing with RSL partners and the Housing Corporation to bid for additional resources through the Affordable Housing Programme. The impact of a successful bid will increase the range of affordable housing solutions in the area, providing increased opportunities for those wishing to purchase where the LPC Living equity share model may be unattainable. However, bids for these resources will be judged alongside other competing affordable housing priorities across the city. 4.23 However, demand for social rented accommodation in this area, as in other parts of the city, has significantly increased since the Framework was prepared. Consultation with local residents suggests that people also have a loyalty to the area and would like to remain in Ordsall, but with opportunities to own their own properties through affordable family housing. However, there is also a growing concern that many local families will not benefit from low cost ownership options and that demand for additional social rented accommodation should also be met. 4.24 Although the area is currently dominated by social rented housing and one of the main aims of the Partnership is to address this imbalance of tenure and increase the level of homeownership in the area to bring it closer to National and Regional levels, it is important that opportunities to balance the provision of the right type of social rented property across the area are not missed. 4.25 The Partnership will need to maintain an awareness of the aim to create balanced, mixed and sustainable communities. This will entail careful consideration of future regeneration activity to ensure a balance of tenure, including the possibility of increased levels of social rented housing. 12 4.26 Consideration also needs to be taken in the context of the growing housing markets in the area, which are dominated by high value privately owned or rented apartments. There is the need to reassess the tenure mix in these developments to consider additional provision of affordable social rented property types to rebalance the market across the whole of the area. 4.27 However, the provision of either shared equity or social rented housing through RSL models require subsidy, even if funding were secured from the Housing Corporation. Under current projections, such subsidy is not affordable within the infrastructure budget, which is allocated to key highway and open space improvements and the primary school. The Partnership will endeavour to investigate other opportunities and different funding streams to achieve more affordable housing. 4.28 o o o o o o o o o o o 4.29 o o o o o o o Public Services In 2004, the following public services were accommodated in the estate: Health Centre Library Primary Schools Youth Centre Family centre Fit City Humphrey Booth day centre Salford Lads’ Club British Legion Places of Worship Ordsall Community Arts Since then, there has been significant investment in public services, with plans for further investment in progress. The voluntary sector Community Café on Tatton Street has opened. The former neighbourhood office has been remodelled and extended to accommodate a playgroup, Surestart offices and community meeting rooms, in addition to the library and Ordsall Community Arts. Primrose Hill Community Primary School and Children’s Centre is under construction, due to open in September 2007, replacing 2 of the 3 existing schools. The successful lottery bid for Ordsall Hall includes provision for a community meeting room. Outline planning permission has been granted for the Oasis Salford Academy on Trafford Road. Agreement has been reached, in principle, for the provision of a fitness suite at Fit City to be funded through a third party S106 agreement. Salford Primary Care Trust is in the process of reviewing its Strategic Service Development Plans, which will outline future proposals for the next tranche of LIFT schemes. This strategy is planned to be completed by the end of September 2007 and will provide the future priorities for developments in Salford. Following public consultation, it 13 has been agreed, in principle, that Ordsall has a high health need and that, if approved in September, a community hub would be developed on a site in the vicinity of the existing district centre, close to the geographical centre of the estate, but easily accessible from Trafford Road. It is anticipated that the hub would contain health, library and public information facilities. Details of the functional content of a proposed centre will be worked upon in more detail and will be based upon service need both from a health perspective and the council services. 4.30 A review of the needs of the future population of the area carried out by service providers in 2005 identified some gaps in current provision in the area. However, it was anticipated that these would all be met by the provision of the Primrose Hill Children’s centre and the proposed community hub. 4.31 The only other identified need for investment in new premises related to the youth service. The youth service occupies the former Sea Cadets premises on Ordsall Lane. This was intended as a temporary solution following the demolition of the purpose-built youth centre at Quays Campus. The layout of the building is poor; it is incapable of meeting DDA requirements, some areas are inaccessible on health and safety grounds and staff supervision is difficult. The building’s position, in between the junction of two busy access roads and directly opposite a senior citizens residential facility, has also added to the inappropriateness of the facility. For these reasons, capacity of the building is limited to 30 people per session and the longer-term operation of the service from this building must be in question. Although Ordsall also benefits from the asset of the Lads’ Club, it is clearly desirable that fit-for-purpose premises replace the existing youth centre. The Youth Service has constantly maintained that there is a need for the original centre to be replaced with a similar building, but that such a replacement will have a major investment implication. The service is at present conducting a facility review and is completing a move towards a locality based delivery approach. Both of these are nearing completion and should be finished by September 2007. However, it is uncertain whether a replacement building in Ordsall will emerge as a priority in the service premises strategy. In the absence of any brief setting out site/building requirements, it is difficult to set aside a site or consider any other options for future development of a new youth centre. Given the anticipated rate of new development, the option of identifying a new site will soon be exhausted. If a site for a replacement youth facility is to be safeguarded, there is, therefore, an urgent need to identify site/building requirements and funding. 4.32 The consultation exercised carried out in October 2006 revealed no significant demand for any particular community facilities other than those currently existing or planned. Indeed, some concern was expressed that there was an excess of community meeting space in the area, adversely affecting the business plan of the Community Café. 14 4.33 Play Areas and Open Spaces Ordsall Park is seen as the main focus for most open space activity in the area. Once the new houses on the Hulton Street site have been occupied, the current lack of casual surveillance across the Park will be remedied, helping protect any subsequent investment. Environment Directorate has prepared a Masterplan for the Park, under the “Parks for People” strategy. 4.34 The estimated cost of implementing the masterplan is estimated as £2 million and funding has yet to be identified. The partnership infrastructure budget makes no allowance for a contribution to this project, although S106 contributions are anticipated from developments in neighbouring areas, particularly Salford Quays, which can potentially make a significant contribution to the costs. 4.35 The original Framework suggested that part of Monmouth Park should be developed for housing. Subsequent local consultation revealed support for retention and enhancement of the Park. Detailed plans are currently being drafted, following a successful workshop event involving local residents in the design. It is anticipated that refurbishment will be carried in spring 2008. 4.36 New play equipment and environmental improvements have been completed at Regent Square Park. 4.37 The original framework identified 5 potential sites for new local equipped play areas LEAPs). None have yet been installed, although plans for a new play area are included within the Ordsall Park Masterplan and consultation on a proposed play area in the grounds of the neighbourhood building is due later this year. 4.38 The other 3 identified sites are all very close to existing houses. One, in South Ordsall, has already been subject of local consultation and has been dropped in view of neighbour objections. It is unlikely that planning permission could be secured for any of these 3 sites in the face of neighbour objections. Given the built-up nature of the area, there are no alternative sites, sufficiently distant from houses, suitable for provision of LEAPs, to the standards set out in the Greenspace strategy. 4.39 In view of the anticipated difficulties of delivering play facilities through the sites identified in the masterplan, the Partnership will work to identify a range of alternative opportunities, including the use of street scale and public realm infrastructure. This could include less formal areas of open space, small-scale play facilities and landscape areas. This will also help to address local aspirations as described in section 6 below. 15 4.40 East West Road The proposal to create a through vehicular route across the estate has not yet been the subject of detailed consultation and there is a risk of objection, particularly from neighbouring residents. 4.41 The new access to the Hulton Street development is designed to form the first phase of the east-west route, although the design also works as a free-standing access. Implementation of this new road will demonstrate the standard of traffic calming proposed along the new route. 4.42 Proposals for completion of the through route are to be developed and consulted upon as part of plans for St Clements School site. 5 THREATS AND OPPORTUNITIES 5.1 Over the last three years, there have been several changes in circumstances, with potential implications for the regeneration of the area, which could not have predicted. 5.2 New Development Proposals Although Salford Quays has been well established for many years, the development of mediacity:uk and the arrival of the BBC is a new factor that will have unpredictable impacts on the demand for housing in Ordsall, local employment opportunities and accessibility. 5.3 The proposed development of the Oasis Academy high school was not anticipated three years ago. It will significantly improve local educational opportunities and offer additional community facilities. It will significantly improve the attractions of Ordsall as place to live for families and so assist the marketing of new houses. 5.4 The new school site does not allow for the on-site provision of playing fields. Consideration is being given to a combination of shared use of pitches in Ordsall Park, with access to dedicated, shared detached school provision elsewhere in the city. However, use of the redundant site of St Clements’ Primary School as a dedicated school playing field is also being considered. 5.5 Moreover, the open space at St Clements School is protected under education legislation. Even if not required by the Academy, DfES approval to its disposal is unlikely. Consideration is being given to exchanging the protection to another site, outside Ordsall, but until this is confirmed, there is a risk that redevelopment of the St Clements School site will be prevented, reducing the number of new houses developed. 16 5.6 Contamination It was always anticipated that, on previously-developed inner-city sites, redevelopment would require mitigation of some contamination. However, detailed site investigations at both South Ordsall and Hulton Street revealed unacceptable contamination hot spots. 5.7 An initial discovery of low levels of chemicals in a number of soil samples was found during routine site investigations on land in South Ordsall; these were in the main hydrocarbons, arsenic and metals. Similar results were found at Hulton Street. It is unknown as to how exactly these came to be in the soil, although they may be as a result of in-fill of soil after the war and prior to the redevelopment of the area in the 70’s. Bonfires and burning of stolen cars may also be a factor. 5.8 The site investigations in South Ordsall were initiated shortly after investigations at the Radclyffe Mews site showed elevated levels of arsenic, metals and hydrocarbons. This contamination was remediated as part of the development of the site and, at the same time, LPC arranged remediation of the communal garden to the rear of the cottage flats on Paris Avenue. 5.9 The design of the Hulton Street scheme was significantly constrained by the need to avoid removal of contaminated land. Even so, the net cost was significant, as outlined above, making the scheme unviable without cross-subsidy. 5.10 Contamination at Hulton Street was found to be contained within the development site, with no risk to neighbouring dwellings. However, the results in South Ordsall identified potential contamination within existing housing areas. Advice was sought from the Health Protection Agency, who advised that such levels posed no cause for concern in the immediate future, suggesting precautionary guidance in the interim, until results of the further site investigations were known. A successful and comprehensive consultation exercise took place in the area during March. 5.11 Further site investigations in a 50m zone around Paris Avenue/Gledhill Avenue flats were carried out towards the end of April and a report is due from the consultants in the next few weeks. Any future implications are unknown until results become available. 5.12 Initial site investigations on other proposed development sites have, as expected, revealed contamination, but not at the levels found on the first sites. The financial projections quoted above make some allowance for likely remediation costs. However, there is a risk that detailed site investigations will revealed further hotspots, which would affect the viability of individual schemes and reduce the funds available to the infrastructure account. 17 5.13 Market Appraisal Implementation of the Framework is entirely dependant on the successful private sector development of new housing. The success of the partnership is therefore at risk from a downturn in market confidence. The speed of sales at Quay 5 and Radclyffe Mews has been very encouraging. However, with recent interest rate rises the market is believed to be nearing it’s peak. 5.14 LPC view this as a risk; but remain confident that, with the target market of first time buyers and homes for local people with housing under £200,000, the new properties remain of interest and within reach; it will be the higher value properties that will be affected in the first instance. Developments such as Hulton Square are already generating interest, before any marketing has taken place, with some 225 people already registered for a brochure and price list. 5.15 Another factor that offers some confidence to LPC is that the housing market surrounding the Framework area is currently being developed predominantly with high value apartments; Radclyffe Mews, Hulton Square, and the future developments through the Framework are the only schemes in the area that will yield any “more traditional” types of dwelling. The sales achieved at Radclyffe Mews suggest there is a high demand for family style dwellings. 6 LOCAL OPINION 6.1 Ordsall Community Forum was invited to review the Framework at its meeting on 17 April 2007. Forum members responded to three basic questions: o Is the Framework still the right vision for Ordsall? o Has the Framework been implemented successfully so far? o Should we re-think our priorities? 6.2 The Forum’s response was positive on all three questions. The consensus was that the Framework remains the right vision for Ordsall and that it had been implemented successfully so far. The approach to implementing the Framework is valued, leading to good levels of consultation. It is felt that the approach demonstrates the Council’s commitment to involving local residents and that it listens to their concerns. The conclusion was that there was no need to re-think priorities. 6.3 Other issues which emerged during the discussion on 17 April were: o An enthusiasm for more green space or retaining existing green space. New green space ought to include areas that are of general amenity and not necessarily formal spaces and play areas etc. o Concern about any large increase in local population. This includes developments in other parts of Ordsall, for example, along the 18 o o o o o 6.4 o o o o o Riverside, and not specifically partnership developments on the main Ordsall estate. Arising from concern with population increase is the likelihood of significantly more children living in the area and whether local services will be improved as a result, for example, can youth services and the youth centre be expanded? Also there is concern about the potential for an increase in traffic flow or congestion problems, in particular on Ordsall Lane and Trafford Road, and associated air quality issues. The general observation, made at the Forum many times, that the area is poorly served by public transport, was made again. Public transport would need to improve to cope with new demand from new residents and to help minimise traffic problems. Further car parking problems were also suggested. Maximum car parking standards could lead to more on-street parking and that family housing should be able to accommodate enough family cars so as not to create access problems for service vehicles. Car parking is an existing local issue, particularly on football match days. The Forum also asked about efforts which will be made to integrate new communities, both within and around the main estate, with established communities in Ordsall. These issues will be addressed, either through implementation of the Framework or by other council initiatives: A net loss in open space for new housing development is a key strand of the framework, with neglected and underused open space replaced by smaller amounts of higher quality open space. However, the need to also retain appropriately located areas of informal open space is recognised and opportunities will be considered as each remaining site comes forward for detailed consideration. A significant increase in population, to support a greater range of services, was also a key strand of the Framework and it is considered that this is still appropriate. However, the cumulative effect of all development and regeneration activity in Ordsall and surrounding areas of Central Salford on the character and amenity of the area will need to be considered. This will be addressed in partnership with the URC. The impact of the planned increase in population, and the anticipated growth in numbers of children will be addressed by the service reviews of individual directorates, including the current Youth Services premises review. Issues of increasing traffic congestion, loss of air quality and the paucity of public transport, are not unique to Ordsall and need to be addressed at a larger scale. Work is underway to address these issues, both across Central Salford and across Greater Manchester, for example through the Greater Manchester Transport Plan and the Transport Innovation Fund. The impact of national and local policy to restrict provision of parking facilities on on-street parking congestion is not unique to Ordsall. Urban Vision Partnership’s traffic management team will continue to 19 monitor and address any specific problems, including the specific local issue of match day parking. o The Framework seeks to physically integrate existing and new residents and different tenures, through layout and design. However, complementary community support to help manage such rapid transformation is also needed. The existing neighbourhood management service has the key role in this work and the URC are developing proposals to give further support to communities such as Ordsall. Agencies such as the Community Café, SAYO (Sport and Arts for Youth in Ordsall) and Ordsall Community Arts, whose funding is uncertain, can also play a key role. o The Ordsall/Langworthy Community Committee recently agreed work to integrate new and established communities as a priority to be included in the Community Action Plan 2008-2009. 7 CONCLUSIONS AND KEY ISSUES 7.1 The Ordsall Development Framework is still considered to still be the appropriate basis for continuing the regeneration of Ordsall. The first housing schemes developed through the partnership with LPC Living have successfully secured planning permission, and appear to be welcomed by local residents and to be commercially attractive to new residents. 7.2 It is anticipated that the partnership in Ordsall will successfully provide the type of accommodation and appropriate neighbourhood settings and facilities that will help to attract families to live in Salford, so helping achieve key council priorities. 7.3 Implementation of the framework is at an early stage, but the pace of development is picking up. Decisions in respect of the few key large sites will be taken over the next few months. 7.4 It is anticipated that council approval to detailed proposals for all the sites will be completed before the development agreement with LPC Living expires in May 2011. However, should that not be the case, no reason is seen why the agreement period should not be extended: the partnership is working well and any slippage is likely to be attributable to external pressures. 7.5 The infrastructure budget is forecast to be in balance. However, it must be noted that current forecasts of income do not allow for any subsidy to provide affordable housing, new public buildings, or to contribute to Ordsall Park. 7.6 The equity share model developed by LPC can ensure that 20% of all new dwellings are available as affordable housing, but reliance on this single model across the whole framework area may not present an affordable solution to many residents. Although bids for additional resources through the Affordable Housing Programme are being 20 prepared these bids will be competing alongside other affordable housing priorities across the city. The Partnership will also bid for other sources of funding to increase the range of affordable housing solutions for residents in the area, such as through the Governments First Time Buyers Initiative. Greater diversity in housing tenure would also be preferable but, given the high proportion of social rented stock already in the area, the concentration on providing new owneroccupied property is considered acceptable at this time. 7.7 The scale and speed of the repopulation of Ordsall is, at one level, encouraging. However, as identified by the Community Forum, this presents potential difficulties of integrating new and old communities. The timely provision of community services, including new buildings, will be vital if regeneration is to be sustainable. Agencies such as the Community Café, SAYO (Sport and Arts for Youth in Ordsall) and Ordsall Community Arts, whose funding is uncertain, can also play a key role. 7.8 Provision of a new community hub, including enhanced health facilities, is a key and urgent priority to meet the needs of existing residents and to help make the area attractive to new families, as well as facilitating the redevelopment of the unattractive district centre site. Discussions with the PCT are progressing well in respect of the identification of a potential site. Subject to the final outcome of the PCT’s Strategic Service Development Plans, detailed proposals will be drawn up to capture the full requirements of the community. As with other LIFT projects in Salford, procurement is carried out through a national NHS procurement process with our local LIFT Co and will be subject to affordability limits set within the PCT and the Council. 7.9 Provision of a new youth centre is also a priority for Ordsall Community Forum, but it is uncertain whether this will emerge as a priority in the emerging citywide service strategy. Unless a commitment to a replacement facility is made and site/building requirements identified very soon, opportunities to locate such a facility will be exhausted. 7.10 Provision of a variety of quality open spaces is essential to creating a sustainable community. Given the built-up nature of the area, there will be difficulties in meeting all the standards sought in the Greenspace Strategy and further work is needed to identify alternative ways of providing open space. 7.11 Issues of increasing traffic congestion, loss of air quality and the paucity of public transport, as identified by the Community Forum, are not unique to Ordsall and need to be addressed across Central Salford as a whole. Failure to address these issues will also undermine the success of the Framework. DEREK ANTROBUS PETER CONNOR 21 Lead Member for Planning Lead Member for Housing AUGUST 2007 22