SALFORD CITY COUNCIL PLANNING & BUILDING CONTROL SERVICES SUMMARY OF BEST VALUE REVIEW OF THE PLANNING & BUILDING CONTROL SERVICE April 2003 c:\rpt\cf\2 IEP 2 1. Introduction 1.1 The Planning and Building Control function provided by Salford City Council is made up of three distinct services:- Development Control Building Control Development Planning These services are located in two sections of the Planning and Building Control division of the Development Services Directorate (Development Control and Building Control being brought together in one section). 1.2 Each of the three services has been subject to a separate Best Value Review, and an Improvement Plan has been produced for each service against which performance can be monitored and measured. 1.3 The purpose of this summary report is to provide an overview of the function as a whole, and particularly to highlight the operational linkages between the 3 services and the way in which the improvement measures set out in the Improvement Plan assist the overall performance of Planning and Building Control in Salford. 2. Local and National Context 2.1 Salford City Council’s role as Local Planning Authority for its area is to enhance and safeguard the use of land and the built environment by ensuring all developments are carried out in the public interest, which involves a wide range of statutory and community consultation. This is undertaken in two principal ways:- through the preparation of the development plan (UDP) through the implementation of land use policies through the development control process 2.2 Both the preparation of the development plan and development control are statutory requirements on local authorities enacted by the Town and Country Planning Act 1990. The Government has published a Planning Bill which is likely to become an Act in 2003, operable from April 2004, which will have major implications for the Planning service. The implications of the changes proposed to the Planning system will only be fully understood when the Government has published detailed guidance following the publication of the Act. 2.3 Decisions on Planning applications are taken, having regard to material planning considerations, by elected members on the Planning Regulatory Panel or by officers with delegated powers. They are constrained in a quasi judicial context by a range of central government regulations, policy and advice and must always make decisions in accordance with Section 54A of the Town and Country 3 Planning Act which requires that decisions must be made in accordance with the Unitary Development Plan unless material circumstances indicate otherwise. 2.4 The Unitary Development Plan and its review are subject to Cabinet overview and Council decision, with the Environmental Scrutiny Committee playing an important role. The formal linkage made through the Planning Bill between the Statutory Community Plan and the Statutory Local Development Framework (the successor to the UDP) places increasing emphasis on the Development Plan’s role in providing a spatial expression of the Community Plan's vision for the City. 2.5 The continuing extent and scope of the regeneration agenda in Salford – highlighted most recently by the Central Salford/Housing Market Renewal Pathfinder initiative – means that there is extensive pressure on the Planning service from non-statutory requirements. Planning plays a key role, working with others, in drawing up strategies and plans and securing the delivery of physical regeneration projects. 2.6 The performance of the planning system nationally has been a concern of Government for some time and there has been an evolution of performance targets over the years centred largely on development control but with the Plan making function now also having a performance target against which it will be measured. The Government has identified that the planning system is underresourced at a national level, and for the period 2003/04 – 2005/06 is making available the Planning Delivery Grant to ensure improved performance against set targets. 2.7 Salford’s role in terms of Building Control is to ensure the health and safety of people in and around buildings, with building work assessed at both the design and construction phases. The fee element of the statutory service – the provision of the building regulation service – is subject to direct private sector competition, and the existence of private sector “approved inspectors” means this is a true competitive market. For this reason excellent customer response times are vital. A number of Statutory services (inspections of licenced premises, dangerous buildings and structures, safety, security and reinstatement of derelict buildings, control of demolition) are non-fee earning and do not operate in this competitive environment. 2.8 The regeneration agenda has a major impact on Building Control, in particular in terms of dealing with derelict buildings and controlling demolition in areas of low housing market demand and where substantial land use change is underway. This is a key ‘quality of life’ issue for many people The longer a building is either insecure or awaiting demolition the greater the opportunity for crime, potential injury and misery for local residents. Action identified in the review to deal with this issue links to ‘a safer Salford’, a fundamental corporate pledge. 3. Aims of the Service 3.1 The City Council’s mission is:“To create the best possible quality of life for the people of Salford”. 4 To achieve this the Council has made 6 pledges to the people of Salford, in terms of:- Better Education for all Quality Homes for all A Clean and Healthy City A Safer Salford Stronger Communities Supporting young people The way in which Development Control, Building Control and Development Planning support the pledges is set out in the detailed reports for each service. The general Aims of the overall Planning and Building Control service are to ensure that :1. Policy making is: - coherent and consistent rooted in the Community Plan about securing sustainable development ‘joined up’ strategically with policy development elsewhere forward looking and not over-reactive to short-term pressures. 2. Planning decisions are made having due regard to the development plan, national and local policy guidance, and any other national planning considerations. 3. The service ‘adds value’ to development in the City and delivers a quality of outcomes. 4. All building work is carried out in accordance with current regulations and standards with the goal of producing a safe, healthy and economic built environment for building users, owners and the community as a whole. 5. Customers are provided with a high quality, responsive and efficient service, that supports and promotes beneficial development and which ensures that the outcomes are fair and equitable. 6. Modern information technology is used to help deliver the service in a way that benefits all users. 7. The service responds to changing needs and situations, providing significant, measurable and continuing improvement of the service in accordance with national and local performance indicators. 5 4. Service Provision 4.1 The Planning and Building Control division is one of four divisions in the Development Services Directorate (the other three being Engineering, Property and Development and Business Services). 4.2 There are currently 55 staff (including administrative staff and trainees) in the division, comprising of:Development Control Building Control Development Planning - 15.0 FTE 14.5 FTE 25.5 FTE 4.3 The detailed reports provide an analysis of the costs of each of the three services. 4.4 In recent years the overall service has seen a significant reduction in staff resources, reflecting severe budgetary pressures affecting the City Council more generally. Against this background the service has managed to respond to an increase in planning applications and at the same time improve performance significantly, and is dealing effectively with a heavy workload in Development Planning and Building Control. These major efficiencies and cost savings have been achieved through considerable changes to working practices. 4.5 It has been recognised that there is a need to deal more effectively with short term problems (e.g. staff vacancies, staff illness) which can cause performance to “dip” – such a dip between June 2001 and June 2002 reduced the Planning Delivery Grant available to Salford in 2003/04. Additional staffing will be required to deal with a significant Housing Market Renewal/Central Salford Programme during 2003/04 – 2005/06, and to meet the requirements of introducing the Local Land and Property Gazeteer (to be managed from the Information team in Development Planning). The process of UDP Review is currently being undertaken on a limited resource base, and this will need further support if we are to meet the requirements of BVP1 200 and adopt the new Plan by 2006. The Planning Delivery Grant resource of £75,000 for 2003/04 will be required in large part to support the UDP Review process. It is also important that Development Control staffing resources are adequate to deal with the new BVPI targets for Development Control performance, and that the staffing resource is adequate to deal with a busy Building Control workload. 5. Terms of Reference 5.1 The terms of reference for the Best Value Review of the three services were established by the Environmental Scrutiny Committee on 17th September 2001 (and subsequently modified for Building Control). The general terms of reference for the whole service are to :- 6 1. 5.2 Ensure that the Planning and Building Control service reflects best value and in general :- Promotes and involves members in a health check on current services in comparison with other providers and customer requirements - Determines the most economic, effective and equitable method of delivery reflecting service improvements and costs that embraces the democratic process and aids a reduction in crime - Produces an action plan for implementation 2. Determine customer perception of the range of services provided, encouraging involvement, accessibility and incorporating customer feedback to improve the way we undertake service delivery. 3. Identify and review the services linkages with other parts of the Council to facilitate structural cohesion and communication between partners. 4. Evaluate the impact of staffing and information technology resources on the service’s capacity to meet deadlines and achieve optimum efficiency in order to improve responsiveness and the timely provision of advice. Specific terms of reference for each of the individual elements of the service are also set down as:Development Control 1. Identify how to build upon the improvement in the speed of processing planning applications and further improve the quality of development. 2. Identify means for the measurement of “adding value” to development for which planning permission is granted in order to assess improvement in the quality of outcome. 3. Evaluate whether the current approach to planning enforcement is efficient, effective, economic and equitable. 4. Assess whether entering into a partnership with the GMGU would be cost effective, improve the quality of the outcome and improve customer service. 5. Evaluate whether the current decision making arrangements can be changed to improve the accessibility of agents, applicants and the public and whether the arrangements to ensure probity are acceptable? 7 Building Control 1. Provide the highest quality service within the income recovered through competitive charges, taking account of the legal requirement to recover service costs over 3 years, for the Building Regulations element of the service. Improving the quality and safety of all buildings in Salford. 2. Assess how best to improve the speed of processing building regulation applications without compromising the quality of the service as a whole. Optimise the use of existing resources and identify additional resources, skills etc required to improve efficiency. 3. The adoption of the DTLR “Performance Standards” and regional performance indicators together with appropriate monitoring systems. 4. Ascertain whether the service is competitive with private sector Approved Inspectors for building regulations applications and identify improvement measures to make the service even more competitive. 5. Ascertain whether customers and stakeholders (internal and external to the authority) are fully aware of the objectives and benefits of the service. 6. Evaluate whether partnering with other bodies for the plan assessment process is an appropriate development. Structural calculations are already assessed by private sector consultants in order to improve short term capacity. 7. Ascertain measures to best achieve the City Council’s requirements for the securing of buildings and reducing potential crime. 8. Improve engagement with customers and ascertain whether they are satisfied that the service being delivered. Is it delivered in the most efficient, effective and economic way? Realign the service, cost effectively, in accordance with their requirements. Development Planning: 1. Ascertain the efficiency and competitiveness of the service with a view to improving cost and quality compared to others 2. Consider the cessation or curtailment of non-statutory services to redirect, where possible, resources to services with a greater priority 3. To ensure that the City is a place where a balanced social mix of people want to live. 8 6. Review Process 6.1 When the Terms of Reference for the Planning and Building Control Service were established in September 2001, this was on the basis that all three services would be reviewed in the same timescale. 6.2 Subsequently, the decision was made to accelerate the Development Control and Building Control reviews within the City Council’s overall programme of reviews, as substantial progress had been made in the Service Improvement Plans for these services in advance of the CPA inspection. Following the collection and analysis of data, vision and challenge sessions and reports to a Member Scrutiny Panel and Cabinet, it was therefore envisaged that the services would be ready for inspection by the Autumn of 2002. On that basis the requirements and improvement plans for the two services were completed by October 2002. However, the Inspectorate indicated that they would not be able to inspect in that timescale because of the pressures of the Comprehensive Performance Assessment process nationally, and following CPA further indicated that they would wish to inspect all three services together. 6.3 The individual reports set out in detail the process for the review of each of the 3 Services, including also resources applied, timescales, approaches to challenge and staff participation. The approach has been thorough without being overbureaucratic, and we have attempted to ensure that the process leads to the improved management of performance and to an enhanced improvement culture within the Services. 7. The Four “C’s” 7.1 Each of the three services has been examined in the context of work on the Four “C’s” – consultation, comparison, competition and challenge. The outcome of the main findings is summarised below. Summary of the Consultation Findings 7.2 The three services achieve high levels of satisfaction from users. 7.3 The key issues for Development Control appear to be about good communication with all users, increasing accessibility to the office, speed of determination of planning applications, and Panel procedures and how decisions are arrived at. The focus of the Development Control review on customers (with 13 specific recommendations in the Improvement Plan and another 11 improvements achieved during the course of the review) reflects a comprehensive response to these issues. 9 7.4 For Building Control, a clear message arising from consultation was the need to improve the response times for new applications, and a range of measures have been and are being implemented to tackle this key area. Communication (linked to promotion of the service) is also identified as a key area by customers, and there is a clear need to assist them by better integrating Development Control and Building Control services. Consultation has highlighted the importance Building Control makes to Corporate pledges such as “a safer Salford“, and a number of recommendations relate to this area. 7.5 The few areas of criticism of Development Planning related to the capacity of the service and the effects of demands on the service exceeding the resources available, potentially leading to reduced responsiveness and progress delays caused by competing priorities. It was also clear that communicating the roles of the team, and explaining functions and processes would be very helpful to customers. Summary of Comparison Findings 7.6 Comparative data for Development Control at a national and regional level is readily available as the service has been measured against a number of key performance indicators for a number of years. For Building Control there are no such indicators, and the review has in particular focussed on benchmarking work across Greater Manchester. Similarly there is little reliable comparative information available for much of the Development Planning Service, and some work on best practice has been initiated to “plug” this gap. 7.7 The comparative date for Development Control shows that in a relatively short space of time Salford’s performance in terms of speed of processing planning applications has improved dramatically, whilst we also have one of the lowest levels of planning cost per head of population. Few appeals against decisions are lost, and the UDP has been consistently adhered to for many years. Weak areas identified from the comparative exercise, and addressed by the improvement plan, includes the need to increase levels of delegation to officers whilst ensuring that high customer satisfaction levels are maintained. 7.8 The comparative data available for Building Control shows it performing well in a range of areas. Weaker service areas tackled on the improvement plan include: improving plan assessment rates; rationalising inspection regimes; improving performance management systems; monitoring key performance indicators; and prioritising the service internally and externally to optimise service benefits. 7.9 For Development Planning, policies, strategies and programmes have been established to maintain and improve on current performance and to initiate work on best practice. The service has provided a very valuable and responsive service, but reducing staffing levels (to meet budgetary requirements) have created problems of prioritisation. The need to focus on core work priorities is 10 essential, without damaging a long-standing “can do”, customer focussed culture. This is being addressed through more formalised work commissioning and work programming procedures. Summary of the Competition findings 7.10 The City Council’s policy on procurement is clear:“It is essential that all our services provide the best value for money, within the resources available to us. We will continue to be outward looking and to provide services through a mixed economy. We ensure that we know how well we perform by benchmarking our services with other public, private, voluntary and independent sector providers. Where improvements to services are needed Improvement Plans establish clear performance targets and timescales and these milestones are monitored to ensure that improvements are realised. A robust options appraisal considers all options for service delivery, including partnerships, co-operatives and competition, in order to maximise service improvement and may conclude that in-house teams cannot achieve the desired level of improvement. Where we do conclude that the in-house organisation has the potential to improve, clear performance targets and timescales will be set and monitored to ensure that the desired outcomes are realised: if they are not then the City Council will explore alternatives. We are committed to supporting good in-house provision and giving services the opportunity to improve, but the needs of users are our paramount concern”. 7.11 The review of Development Control has examined the market for the service it provides, and found that the external market is not well developed and fragmented. A variety of options for the provision of the service have been examined and retention in-house is identified as the most practical option given the current (and improving) performance. However, the review has led to a decision to form a partnering arrangement between the service and a facilities management company to improve document flow. The use of consultants or other external agencies will be approached on a needs basis, where capacity issues arise which could impact on performance. 7.12 The Building Control service operates within a highly competitive market, and changes in legislation dating back to 1985 have progressively introduced private sector competition and the concept of the “Approved Inspector”. This means that Building Control customers already have a choice in that they can use the services of either Salford Building Control or private sector approved inspectors. In looking further at procurement options the service has identified a number of future improvements including the establishment of a “Re-thinking Demolition” partnership, the development of a Protocol on dealing with demolitions with United Utilities, improved local marketing of the Building Control service, and potential partnerships to improve the delivery of statutory services. 7.13 The Development Planning service currently operates on a “mixed economy” basis, with the use of both AGMA joint units and private sector consultants in support of the in-house team. Market testing shows the service to be competitive 11 on cost compared to consultants. However, notwithstanding their expense, the review has identified that the use of consultants can bring great benefits by virtue of the specialist skills and commercial perspectives they can bring. The improvement plan identifies that the service needs to be more structured about the use of consultants to maximise efficiency/effectiveness benefits. The inhouse team also needs to improve efficiency and effectiveness by adopting more structured business practices. 7.14 The wider Directorate is moving to form a strategic partnership with the private sector. The suggested approach is a Joint Venture Company into which all Directorate staff would be seconded. The benefits to the Planning and Building Control service are likely to be in terms of investment and assistance with capacity. An OJEC notice will be published in May 2003, with the JVC set up in the latter part of 2004. It will be a requirement that such a partnership delivers key performance targets and the improvements set out in this review. Summary of the Challenge Findings 7.15 All three services have been rigorously challenged, and this has resulted in an extensive range of improvement measures, some of which are already implemented or on the way to implementation. Critical friends from other local authorities and the private sector have been involved in the process, as have staff who after all have the major stake in an improving service. 7.16 The challenge has been broad and has included:- should the City Council provide the service the suitability for procurement change our customer focus the quality of the service our efficiency and effectiveness 7.17 The result is we believe three improvement plans which will ensure that we remain focussed on statutory and corporate priorities, and that our services continue to be well regarded by our customers. The outcome of the improvement plans are summarised below. 8. Improvement Plans 8.1 The individual Service Improvement Plans for Development Control, Building Control and Development Planning set out areas for improvement, improvement targets and short, medium and long term action points for each of these areas. The detailed recommendations set out in the 3 improvement plans are listed in Appendix 1 to this report, using the headings below. 8.2 This report summarises the areas for improvement, and in particular highlights the cross-linkages between the three services where these exist. 12 Plan Making 8.3 The Development Planning SIP identifies the need to ensure that the service meets the requirements of BVPI 200 from April 2003, which in Salford’s case means having a replacement Plan adopted within 3 years. Having an up-to-date plan in place is critical to the effective operation of Development Control, as section 54a of the Town and Country Planning Act states that decisions on planning applications must be in accordance with the Development Plan unless material considerations indicate otherwise. 8.4 The revised UDP was placed on first deposit in February 2003, having been informed by community views through the previous Area Plans process. We are on track to have an adopted Plan in place by 2006 although there is a need for key technical work to be undertaken in 2003/04 to support this process. This will need to be funded from a range of sources, including potentially Salford’s Planning Delivery grant of £75,000. Previously developed land 8.5 The Development Planning SIP identifies the need to ensure that Salford’s performance in developing new homes on previously developed land (BVPI 106) remains in the top quartile. The continuation of Salford’s good performance on BVPI 106 is dependent upon the policy context provided by the Development Plan (within national and regional guidance) and effective implementation through Development Control. 8.6 Recently published Regional Planning Guidance provides Salford with a 90% target for housing development on previously developed land. Our performance in 2002 was 97% of new housing on such sites. Effective implementation of Policies, Plans and Strategies Quality of Outcomes/Added Value 8.7 It is important to ensure that the City Council’s planning policies continue to be successfully implemented through the Development Control process, and that the Development Planning service maker an effective contribution to this. This is an area for improvement in both the Development Planning SIP and (under the heading “Quality of outcomes/Added Value”) in the Development Control SIP. 8.8 To assist the implementation of policy during the course of the review we have produced SPG for House Extensions, Tree Protection, Crime and Security, and Telecommunications, and guidance for Planning Obligations in Chapel Street. We have also successfully introduced the process of Planning Panel member reviews of decisions. 13 Processing Planning Applications 8.9 The Development Control SIP identifies the need to demonstrate an efficient and customer focussed organisation through improvements against government targets on the time taken in determining planning applications (BVPI 109 a,b,c). The Development Planning SIP recognises the need to support these efforts. Increasing the percentage of applications determined by officers (BVPI 188) will be important in giving Elected Members more time to decide major and controversial applications. 8.10 As part of the review process we have produced and implemented a QA assured process review in Development Control, and have received a document flow report from partners Oce FM, with a view to moving to a digitally based service. The numbers of planning applications received between 2001/02 and 2002/03 increased by 16.2% (from 1559 to 1812). The number of applications determined increased by 20% (from 1286 to 1547). With a static staff establishment our performance on the “speed indicators” has continued to improve, indicating continuing staff performance, focus and efficiency. During 2002/03 58.7% of major applications were determined in 13 weeks (target 60%), 68.10% of minor applications in 8 weeks (target 65%) and 82.00% of “other “ applications (target 80%). Plan Checking 8.11 For Building Control there is a need to improve response times to plan checking, whilst maintaining and improving a customer focussed quality service. 8.12 The taking on of agency staff, and a range of other measures, has seen our performance on plan checking improve and the backlog greatly reduced. The initial plan check rate, for 2002, was approximately 25% within 3 weeks of submission, for 2003, this figure is currently in excess of 60%. Transparency, Probity, Fairness and Consistency in Decision making 8.13 The Development Control SIP identifies the need for a range of measures to maintain transparency, probity, fairness and consistency in the decision making process relating to the determination of planning applications. The statutory regulations and guidelines for the production of Development Plans are intended to ensure similar objectives for the process of decision making. The intention in the Planning Bill to introduce a requirement for the preparation of a statutory “Statement of Community Involvement” to reflect both plan making and development control will need to be reflected in the Development Planning SIP at a future date. 14 8.14 A range of measures have been implemented during the review, including:- - Planning and Transportation Panel Quality Assured to improve public reassurance of probity and fairness of hearing. Annual member training Review of decisions by members Implementation of District Audit Action Plan following their review into the decision making framework for planning decisions, probity issues, management arrangements and legality. Adopted Local Code of Conduct for Members and officers revised and posted on web-site and staff/members trained. Reasons given for all planning application decisions. A range of other measures to improve the reporting of planning applications to the Panel are being examined. Focus on what matters A Safer Salford 8.15 The Planning service – and especially Development Planning – is a responsive service which plays a leading role in serving the physical regeneration of the City, and is affected by corporate priorities. The impacts of these on the work programme have to be effectively managed and delivered, and this is reflected in the Development Planning SIP. The Building Control SIP also reflects the impact of corporate priorities in recognising the need to improve its contribution to a “Safer Salford”. 8.16 A number of vacant posts in Development Planning have been filled in the last year, assisting difficult capacity problems. If the section is to contribute effectively to the delivery of the Central Salford/Housing Market Renewal Framework and other major initiatives then additional capacity will be required, and the appropriate resource has been identified. This work will also require a further scaling up of Building Control’s support to “Safer Salford”. Improving performance management and monitoring systems 8.17 The Development Planning and Building Control SIP’s identify improved performance management/monitoring systems as key areas for improvement. For Development Planning the need to develop a clear and deliverable work programme based around agreed clear priorities, and managed effectively, is essential to focussing on what matters. (See 8.13 above). Development Control has been more advanced in formal performance management and monitoring, with a range of action points intended to further maintain and improve performance identified in its SIP. 8.18 A number of measures have been implemented in Development Control to improve performance management – creating a small applications processing team, adopting an enforcement concordat and charter increasing the number of enforcement staff and focussing staff on performance and government targets. 15 The introduction of a national performance target for plan making (BVP1 200) in 2003/04 will sharpen the performance focus in this area of activity. Significant improvements in ICT in Development Control and Building Control in 2002/03 will also assist overall performance. Market Share in Building Control 8.19 The Building Control service is distinct from the two Planning services, in that it operates in a truly competitive environment. A key area for improvement for this service, which is not reflected elsewhere, is the need to maintain and improve market share and the self-financing of the Building Regulations Service to minimise service costs to Salford citizens. 8.20 A number of improvements have been implemented through the review to help maintain and improve market share, including:- a marketing implementation plan customer consultation/customer database partnership arrangements (Interserve Ltd, Acorn Construction, Fisk and Associates) Developing User Panel Developing web-site Fee alignment with other GM Authorities Weekend inspections Service Information brochures Customer Focus 8.21 All three services identify customer care and customer relations and improved service accessibility as being an important area for improvement. The range of measures covered is extensive. The reception area in the Civic Centre is the service’s “front door”, particularly for Development Control and Building Control, and continues to be improved. The move to e-government means that putting good information on the Web is increasingly important. The extended opening hours for Development Control has been a success. There is a need to provide more information for all services, including for Black/ethnic minority/non-English speaking customers. 8.22 The successful Development Team approach and its future improvement is an element of each services’ SIP, reflecting its role in providing a “one stop shop” for pre-application discussions in relation to major developments. 8.23 During the period of the review a number of measures have been introduced, all of which are designed to improve the service to our customers. These include:- a web site with all planning applications available for viewing (this site is now one of the City Council’s most popular) the UDP and the revised UDP available for viewing on the web site 16 - a loop system and electronic doors installed at reception late night opening for the DC service established the “Development Team” approach established as a one-stop-shop for applicants a Customer Charter produced leaflets produced in minority languages, reception staff having access to “Language Line”. Staff Resource Management 8.24 The effective management of our staff – our key resource – is an area for each SIP. For Development Planning the key is “focussing on what matters” and linking this to improved performance management systems, and in particular a clear and deliverable work programme. There is a balance to be achieved between the staff resources available and the Directorate and Corporate priorities which the section is being asked to lead on and contribute towards. For Development Control the key to maintaining performance in time taken to determine planning applications is ensuring adequate staffing levels and a flexible structure, and focussing staff on key improvements. For Building Control the need to create more staff flexibility in order to address fluctuating workload demands is one of a range of staff resource management measures identified. For Development Planning the development of an agreed work programme will require adequate staffing levels and the further development of a performance culture. 8.25 The overall service has seen a significant reduction in staffing in recent years, in all three areas. From an overall establishment of 84 staff in 1998/99 (including administrative support) the number of staff now stands at 55 in post. The reduction in Development Planning has been most dramatic, with 42 staff in 1998/99 reducing to 21 in 2001/02 rising to 25.5 in 2003/04. In all three services we have had to become much more performance focussed and efficient. The City Council still wants the services to maintain the “can do” and responsive culture that has served the Authority so well in the past. This will require increasingly effective management and prioritisation of work, including some difficult decisions about areas of work, which cannot be given high priority. 9. Achievement 9.1 The Planning and Building Control service has a proud record of achievement which includes: An adopted UDP which has provided a robust framework for Development Control. The Area Plans, which have engaged local communities in the planning of their areas and are informing corporate strategies and plans. Award winning physical regeneration schemes (Salford Quays, Eccles Town Centre, Chapel Street). 17 The development of GIS and information systems to support planning and regeneration work. An effective Development Control service, with greatly improved performance. A customer-focused Building Control service, which strongly supports the ‘Safer Salford’ initiative. 10. Monitoring 10.1 The Best Value process itself has stimulated improvement within the service, and improvements on targets are being made. These include:- 10.2 The speed of determining planning applications is improving, with minor and ‘other’ planning applications achieving or nearly achieving 2002/03 targets. The speed of determining major applications has improved significantly. Delegation to officers has also improved, and will see further improvement in 2003/04. The pilot exercise late night opening of the office/reception seems to have proved a success, welcomed by customers and usage will continue to be monitored. More information is now being made available including minority groups and through the Web. The percentage of enforcement cases resolved in 13 weeks has exceeded the 2002/03 target so far this year. The Development Team approach has been established. Response times to plan checking for Building Control are improving. A more responsive and customer focussed service to deal with demolition, security and dangers has been established. The revised UDP (1st deposit) has been published. The service has contributed to the emerging Housing Market Renewal programme, and there is a commitment to fund an increase in staff capacity to deal with this greatly expanding area of work. A full progress report on the implementation of improvements to Development Control and Building Control Services was reported to the Environmental Scrutiny Committee on 17th February 2003. The Development Planning service report and improvement plan presents the improvements achieved through the review process. Report on progress on the implementation of improvement plans will be made on a quarterly basis. 18 11. Conclusion 11.1 The Best Value assessment and the formalisation of Service Improvement Plans has helped the Planning and Building Control Service at Salford City Council to : compare itself with other services across the country; assess whether the existing service is best placed to provide the service, and whether “competitors” can play a part in its provision; consult customers on their views and requirements of the service; and fundamentally challenge how the service is provided, and how we might improve that service for its users. 11.2 We believe the Service Improvement Plans are thorough and robust, but there is no doubt that they will need to be kept under review as we move forward. The background against which the service operates is evolving rapidly: 11.3 - the Planning Bill, and the prospective 2003 Town and Country Planning Act, will place new requirements on us. - the City Council’s changing structure, including the Development Services Directorate prospectively moving into a Strategic Partnership with a private sector company in 2004, will provide a new context for the delivery of our services. - the regeneration agenda, particularly with the ‘Central Salford’ and Housing Market Renewal Initiatives, is broadening and deepening, and with the service having a leading role in land use planning and physical regeneration this has as yet uncertain consequences for our service. With these changes in mind, we intend to drive forward with improving the service’s performance, making sure that these service improvements are relevant and necessary to our clients and the users and customers of our services, and kept under continual review. APPENDIX 1 Recommendations The reviews of the three service areas have resulted in a range of recommended improvement measures, which are set out below under the headings used in this summary report. The review process itself – and indeed the “performance culture” of the overall service – has resulted in a range of improvements already achieved which are summarised in the three service reports and improvement plans. Additionally, and bearing in mind that the Development Control and Building Control Reviews were completed in September 2002, a number of the recommendations below have been implemented. (Note: the reference numbers below relate to those in each of the three Service Improvement Plans). Plan Making Development Control R 26 Produce new SPG and review existing following review of UDP Development Planning DP 1.1 Undertake key technical work to support UDP at inquiry DP 1.2 Prioritise revised draft UDP to adoption by April 2006 Previously Developed Land Development Planning DP 2.1 Improve monitoring systems DP 2.2 Brownfield land management action plans DP 2.3 Actively bring forward brownfield sites for development Effective Implementation of Policies, Plans and Strategies Quality of Outcomes/Added Value Development Control R19 Proactive compliance checking R20 Adopt SPG for Telecommunications R21 Introduce member review of decisions R24 Review existing SPG from Hot Food uses R25 Commission GMGU to monitor major minerals and waste development and ensure compliance with conditions Development Planning DP3.1 Appropriate policy advice to applicants for p/p in pre-application discussions DP3.2 More written advice for prospective developers/improve policy guidance DP3.3 Ensure planning policy continues to be relevant and up to date c:\rpt\cf\2 IEP 2 Processing Planning Applications Development Control R1 Implement Oce process review to move to a digitally based service R2 Extend the use of GIS to speed processes up and improve quality, including:R22 - accuracy of data reliability and consistency of data comparison of multiple data sets Produce planning checklist to improve quality of submission of planning applications Plan Checking (Building Control) Building Control R1 Address existing backlog of applications, in order to ease the introduction of new working methods and focus attention on achieving new targets. R2 - Improving plan checking speed and quality in response to customer demands. The adoption of the DETR Building Control Performance Standards (BCPS) in relation to plan checking will provide a base line for speed and the quality of service. R3 - Revise inspection regimes, reducing numbers but improving quality, this will allow an increase in plan checking capacity. Develop and operate new inspection regimes in line with BCPS. R4 - Devolve staff recruitment to section manager in order to ensure staff resources are maintained and targets can be achieved. R5 - Formalise working partnership arrangements with the Greater Manchester District Surveyors Association in order to improve plan checking capacity and speed up response times. R6 - Create more staff flexibility within the service in order to address fluctuating workload demands. Workload should be considered an office problem, not an individuals. R7 - Investigate effectiveness of national partnering schemes with major developers to ensure that this work can be undertaken successfully without adversely impacting on local services. R8 - Improve and monitor working practices and arrangements in conformity with DETR Building Control Performance Standards, ensuring that overall 3 service quality is maintained and improved whilst addressing the plan checking issue. R9 - Expand the use of home working to improve efficiency and increase time available for plan checking and inspections. R10 - Develop training structure to ensure staff are kept informed of changing technical issues and the business/organisational environment. R11 - Develop a performance culture within the section to ensure a strong focus is maintained on improving plan checking speed without losing other quality features. R12 - Enhance the effectiveness of IT usage within the section, in order to optimise capacity and assist in the improvement of performance management. Transparency, Probity, Fairness and Consistency in Decision Making Development Control R27 - Revise Local Code of Conduct for Members and officers dealing with planning matters in light of new publicised national and LGA guidance. R28 - Produce QA procedure for Planning and Transportation Panel. R29 - Produce policy on achieving a responsive dialogue with local people rather than just consultation. Focus on what matters/A Safer Salford Building Control R13 - Improve efficiency and effectiveness of the demolition process in order to minimise nuisance to Salford citizens and improve the local environment. R14 - Improve the efficiency and effectiveness of dangerous structures service in order to ensure “a safer Salford”. R15 - Improve efficiency of licensing service in order to ensure “a safer Salford”. Development Planning DP4.1 - Community Plan Living Environment Forum to be developed as a Strategic Development Partnership. DP4.2 - Prepare Derelict Land Strategy. 4 DP4.3 - Improve mechanisms for coordination of work with Chief Executive’s Economic Development. DP4.4 - Integrate LA21 into the Community Plan. Improve Performance Management and monitoring systems Development Control R4 - Further develop the performance culture and focus staff on key improvements. Building Control R28 - Develop an improved performance monitoring system in order to ensure a cost effective service and maximise efficiency. Development Planning DP5.1 - Develop a clear and deliverable work programme. DP5.2 - Improve the management of requests for new work. DP5.3 - Ensure key priorities and proposed work outcomes accurately reflect Directorate’s Service Plan. DP5.4 - Undertake process mapping for key work. DP5.5 - Streamline monitoring of performance indicators. DP5.6 - Secure improvements to the way in which consultants are used. DP5.7 - Learn from best practice from around the country. DP5.8 - Improve the induction of new staff. DP5.9 - Develop a standard approval for project management. DP5.10 - Implement benchmarking with family authorities. Market Share in Building Control Building Control R16 - Focus service on local customer demands. Produce an outline marketing strategy for the service to target local customers, specific demands and potential partners, review on an annual basis. 5 R17 - Develop and promote the benefits of the web site beyond statutory guidance to further engage customers. R18 - Align fees with all other Greater Manchester Authorities, in order to provide a uniform local approach. R19 - Produce a promotional brochure to encourage new business. Customer Focus Development Control R5 - Modernise how the City Council consults with regular users to secure further and more efficient transactions. R8 - Improve access to service. R9 - Extend opening hours Thursdays from 8.00 a.m. – 7.00 p.m. R10 - Improve web site. R11 - Improve access by Black and ethnic minority groups. R12 - Improve reception by implementing reception access action plans. R13 - Publish service standards and information on planning applications on web site and poster in reception. R14 - Introduce Duty Officer system. R15 - Submit charter mark bid to maintain continual improvement on customer issues. R16 - Implement Peer Review Group 4 for strategy. R17 - Develop strategy for access to services in a Contact Centre and One Stop Shop. R18 - Publicise the Development Team approach. R29 - Produce policy on achieving a responsive dialogue with local people rather than just consultation. Building Control R20 - Produce brochures and other forms of media to publicise service standards. R21 - Introduce Development Team Approach (DTA). 6 R22 - Produce leaflets in other languages promoting the service. R23 - Improve planning counter by working to action plan. R24 - Produce clearer application forms and reduce the number required. R25 - Extend services and information available on the Web Site. R26 - Publish standards and PI’s on web site and promotional poster within reception. R27 - Bid for a Charter mark for the service. This will demonstrate a customer focussed service and lead to further improvements. Development Planning DP6.1 - Provide written information on the service. DP6.2 - Improve cover arrangements in office. DP6.3 - Ensure that those speaking/reading languages other than English are able to access the service. Staff Resource Management Development Control R3 - Ensure adequate staffing levels. R4 - Develop performance culture, focus staff on key improvements. Building Control R4 - Devolve staff recruitment to section manager – in order to ensure staff resources are maintained and targets can be achieved. R6 - Create more staff flexibility in order to address fluctuating workload demands. R9 - Expand the use of home working. R10 - Develop a training structure. R11 - Develop a performance culture to ensure a strong focus is maintained in improving plan checking speed without losing other quality features. 7 Development Planning DP4.5 - DP5.13 - Ensure adequate staffing levels to deliver agreed work programme. Develop the performance culture within the section