Part 1 ____________________________________________________________ REPORT OF THE STRATEGIC DIRECTOR FOR SUSTAINABLE REGENERATION ______________________________________________________________ TO THE LEAD MEMBER FOR HOUSING ON FOR INFORMAL ON 2ND DECEMBER 2008 FOR FORMAL ON 16TH DECEMBER 2008 ______________________________________________________________ TITLE:The Salford Home Improvement Agency (HIA) proposed Enquiry Waiting List Management and Priority Points Policy ______________________________________________________________ RECOMMENDATIONS: That Lead Member for Housing: 1. Notes the content of this revised Report 2. Approves the revised Home Improvement Agency proposed Enquiry Waiting List Management and Priority Points Policy ______________________________________________________________ EXECUTIVE SUMMARY: The Home Improvement Agency has been in operation in Salford since April 2001. The Home Improvement Agency remit within Commissioning & Projects Team, Sustainable Regeneration Directorate is to enable older/disabled and vulnerable residents of Salford to remain living independently in the home of their choice, improving their quality of life. There has been a high demand for the service, which has resulted in a waiting list of enquiries from vulnerable residents who are home-owners or private tenants that require repairs/adaptations or improvement works to be carried out to their property. The type of financial assistance that was available through Salford City Council was by way of the previous Home Repairs Assistance. These enquiries were received prior to the adoption of Salford City Council Private Sector Housing Assistance Policy in January 2006 (Amended). 1/27 This report seeks Lead Member approval to integrate the proposed Enquiry Waiting List Management & Priority Points Policy (see attached Annex B and C) into the HIA, Home Improvement Assistance Process, previously approved by Salford City Council Audit department on 20 th July 2007. This will ensure a robust and transparent process when the Home Improvement Agency is dealing with enquiries for assistance ______________________________________________________________ BACKGROUND DOCUMENTS: Supporting People Strategy 2005-2010 Salford Housing Strategy Salford Affordable Warmth Strategy Private Sector Housing Assistance Policy 2006 (Amended) Regulatory Reform (Housing Assistance) (England & Wales) Order 2002 Audit Report ______________________________________________________________ ASSESSMENT OF RISK: Low – The HIA in line with the Private Sector Housing Assistance Policy currently offers advice on financial assistance to private sector residents (home-owners and private tenants) and has experience in this area of the delivery of HIA services. The service is highly valued by residents and colleagues, which can create an increased demand for the service. By approving the proposed Enquiry Waiting List Management Process will enable the HIA to ensure that management of the enquiries is legally compliant in line with the Private Sector Housing Assistance policy 2006 (Amended). An Equality Impact Assessment has been carried out on this new process. (Annex D). The consequence of not adopting this process would be that priority cases where there is an impact on health would result in the HIA being heavily criticised. ______________________________________________________________ SOURCE OF FUNDING: Housing Capital Programme – Private Sector Community Health & Social Care Supporting People ______________________________________________________________ 2/27 ______________________________________________________________ LEGAL IMPLICATIONS: The HIA is monitored through a Service Level Agreement with Supporting People and complies with the requirements of the Supporting People programme. Contact details: Nicky Smith 0161 793 3083 ____________________________________________________________ FINANCIAL IMPLICATIONS: The HIA is responsible for the delivery of a total capital budget of £400k in the current financial year. The HIA proposed Enquiry Waiting List Management Process seeks to maximise use of the existing resources available through the Housing Capital Programme and does not require any additional resources. Contact details: Nigel Dickens 0161 793 2585 ______________________________________________________________ COMMUNICATION IMPLICATIONS: Following Lead Member approval this report and appendices will be published on the Home Improvement Agency web site and a communications plan will be put in place to inform potential customers of the enquiry process. VALUE FOR MONEY IMPLICATIONS: There are benefits for Clients, Salford City Council and Partners (Statutory & Voluntary) as the HIA will be able to respond in a timely manner to all enquiries avoiding admission into care and delaying hospital discharge. CLIENT IMPLICATIONS: Not Applicable as service is directly provided by Salford City Council. PROPERTY: Not Applicable. ______________________________________________________________ 3/27 ______________________________________________________________ HUMAN RESOURCES: The work of the HIA in delivering its responsibilities is fully reflected in both team and individual work plans that are actively managed in line with the performance management framework. ______________________________________________________________ CONTACT OFFICER: Sandra Mardell – Principal Officer, (HIA) Commissioning & Projects Team, Sustainable Regeneration - 0161 793 2898. ___________________________________________________________ WARD(S) TO WHICH REPORT RELATE(S): All Wards. ____________________________________________________________ KEY COUNCIL POLICIES: The work of the Home Improvement Agency (Commissioning & Projects Team) cuts across key Council Policies, including the Housing Strategy, WellBeing Strategy, Supporting People Strategy, Crime and Disorder Strategy, Human Resources Strategy, Affordable Warmth Strategy, Private Sector Housing Assistance Policy, Community Health and Social Care, Housing for People as they Grow Older and Partners in Agreement, Equality & Diversity. ______________________________________________________________ DETAILS: 1. Background 1.1 Salford City Council’s HIA was established in April 2001 to enable residents of Salford to remain living independently in the home and community of their choice, improving their quality of life. 1.2 The aims and objectives of the HIA are to ensure resident’s properties are safe, dry, warm, have improved home security & safety, potential health risks and risk of hospital readmission are reduced. Maximising income and improved energy efficiency make cost savings to client. 1.3 The HIA has the ability to access funding to pay for repairs/adaptations/improvements from charitable organisations, serviceman’s charities, current/past employment charities and health related charities as well as through Salford City Council Private Sector Housing Assistance Policy. 4/27 1.4 The HIA administers £400k from the Housing Capital Fund to deliver financial assistance in line with the 2006 (Amended) Private Sector Housing Assistance Policy. 1.5 As there has been a high demand for the service, there is a need to prioritise the workload of the agency to enable the HIA to deliver an immediate responsive service. 2. Current Situation 2.1 The HIA currently has a “historic” waiting list for financial assistance for repairs/adaptations or improvements to their property which is being addressed by the newly appointed Project Officer (Assessor/Caseworker). 2.2 In addition the HIA receives annually 200+ enquiries for financial assistance and advice for repairs/adaptations and improvements. With current staffing resources it is envisaged that by reducing the “historic” waiting list, will increase demand for the current financial options that are available. 2.3 The HIA has a written, audited, process for delivery of the Private Sector Housing Assistance policy (Home Improvement Assistance) but requires the addition of a robust and transparent process for managing the potential demand for the service. 2.4 Analysis was carried out to identify reasons why there is such a high demand for the service, concluding that, due to an ageing population there is the inability to carry out repairs, fixed weekly incomes and reducing savings or no savings. 2.5 The preferred option for managing the demand for the service was to establish a priority points system. (Annex A). 2.6 The process for managing the demand is set out in the document attached, which outlines the “timescales, rules including points system, emergencies and exceptions”. (Annex B). 2.7 Where the enquiry/referrals are over and above the resources for the HIA to deal with, the prioritisation criteria will be used to enable a robust and transparent process for managing the workload. (Annex C). 2.8 Following the Lead Member informal briefing in September 08 the waiting list, priority policy has been amended to take into account that the policy should be clearer and easier to understand for our customers. An information sheet has also been included which will be given out to all the HIA customers. 2.9 An Equality Impact Assessment has been carried out on this process (Annex D) and the system was tested on 10 cases (Annex E). 5/27 3. Conclusion 3.1 Salford HIA provides an important service against a national agenda, delivering local outcomes for the most vulnerable/disabled and hard to reach residents within our community. 3.2 The proposed process reflects best practice in enquiry list management. It will ensure that the Home Improvement Agency service targets the Home Improvement Assistance to the most vulnerable groups, addressing needs to enable them to remain in their home with greater dignity, safe, warm, dry and secure in their community. 6/27 Annex A Option 1 Description: Write to all people on the current waiting list who has enquired for assistance in the past seven years stating that the Home Improvement Agency is closing the list and they will have to write in and re-apply. How could it work? This would completely remove the historic waiting list enabling the Home Improvement Agency to have a new start with all enquiries. The Officer/Assessor could visit all new enquiries. Disadvantages: Not good customer service Complaints could increase Inadequate staff resources to deal with all the phone calls that this would generate Negative publicity Advantages: No waiting list No longer fire fighting Meet Supporting People funding and customer service standards targets on first enquiry to first visit This option can be improved by: Contact people on waiting list by phone instead of writing to explain situation which would improve customer service 7/27 8/27 Annex A Option 2 Description: Develop a bespoke priority points system for Salford City Council Home Improvement Agency to cover all older/vulnerable/disabled people taking into account types of repairs that may be a health and safety issue. How could it work? This would ensure a fair and transparent option for delivery of a quality service. Disadvantages: Points allocation may not be correct May not reduce complaints initially Advantages: Treat everyone fairly Improve service delivery Reduce number of complaints Reach targets for funders Transparent system Good customer service Good use of resources, revenue and capital Meets strategic priorities Agency can work on being proactive instead of reactive This option can be improved by: Regular consultation and evaluation 9/27 Annex A Option 3 Description: Adopt a priority points system that has been drawn up by another Local Authority Grants Department specifically for the different types of grant assistance that they offer. How could it work? It could possibly work as it has already been tried and tested and avoids “ reinventing the wheel”. Disadvantages: Not Salford City Council priorities Exclude some groups Not be fair and equal and in line with Salford City Council Equality & Diversity policy Does not meet Salford local needs Does not include all work areas Advantages: This option can be improved by: Don’t have to re-invent the wheel Quick and easy to implement Has been tried and tested Could amend to include all groups 10/27 Annex A After working through the four stages for all three Options as identified above it appeared that Option 2 would be the best option to take forward. To enable a decision to be made a matrix was completed to determine which option would best solve the problem. Decision Matrix Criteria Fair and Transparent Meets Targets Good Customer Service Reduction in Complaints Address Decent Homes & Target Resources Includes all groups Total: Weighting Option 11 Option 22 Option 33 40% 40% 40% 20% 5% 5% 5% 5% 10% 0% 10% 10% 10% 1% 8% 8% 15% 0% 15% 15% 20% 20% 20% 20% 100% 66% 98% 78% The criteria and weighting I have used in the decision matrix is in order of importance when looking at solving the problem of the waiting list. This is in line with Salford City Council’s: Equality & Diversity policy ) Supporting People ) Housing Strategy ) Customer Charter ) The results highlight that Option 2 has the highest score and is the preferred option. 1 To write to all people who are on the waiting list, who have enquired for assistance in the past seven years, that they will have to re-apply 2 Develop a priority points system to cover all groups taking into account types of repairs that may be a health and safety issue 3 Adopt a priority points system that has been drawn up by another Local Authority or Home Improvement Agency 11/27 Annex B SALFORD HOME IMPROVEMENT AGENCY WAITING LIST MANAGEMENT And PRIORITY POINTS POLICY NOVEMBER 2008 12/27 Annex B WAITING LIST MANAGEMENT There are times of the year when the response to enquiries/referrals may not be as quick as other times of the year, e.g. when a member of staff is on annual leave or a member of staff is not well or there is an increase in the number of enquiries being received. In these cases it is important that a full explanation is given to the customer. It is also possible there will be times when there is a demand for the Project Officer/Technical Service or a Project Officer/Caseworker visit or Project Officer/Caseworker attention that exceeds what can reasonably be done within the normal timescales with the staff resources available. In these circumstances a waiting list will be set up to ensure a fair and equal system is operated. 1. Timescales 1.1 The normal timescale from receiving an enquiry for the service and a first visit by the Assessor is twelve weeks from first contact with the Home Improvement Agency; this is in line with the Home Improvement Agency Customer Service Standards. 1.2 The Priority Points Policy is to be used to prioritise high priority cases to ensure they are dealt with promptly, where demand exceeds resources using these principles. 2. Waiting List Rules 2.1 All enquirers must be advised at the time of enquiry if there is a waiting list and an approximate time of when they can expect to receive the Home Improvement Agency service. 2.2 All enquirers for the service will receive an acknowledgement letter detailing their enquiry reference number within 7 working days of the date of enquiry. The acknowledgement letter will also confirm the timescale for receiving the service. 2.3 All enquirers will be advised in the acknowledgement letter that should their circumstances4 change or Salford City Council circumstances5 change enquirers will be encouraged to notify the Home Improvement Agency of these changes. 4 Client circumstances could be related to their health, financial or living conditions Salford City Council circumstances could be related to the types of financial assistance that may be available, changes to policy or changes to the service offered by the Home Improvement Agency 5 13/27 Annex B 2.4 All enquirers will be advised in the acknowledgement letter that if they have been entered on the waiting list they will receive correspondence on a quarterly basis advising of the current situation. 2.5 All enquirers for the Home Improvement Agency service will be recorded in date order on Foundations database and cases will be allocated to the Assessor to arrange an initial visit in date order, however, there may be exceptions, these exceptions are detailed below. 3. Exceptions 3.1 In some circumstances with regard to 1.1, it may be appropriate to allocate a case direct to the Caseworker following the home visit initial assessment by the Assessor. Requests to advance enquiries will only be done following re-calculation of the Points as detailed below in the Priority Points Policy, because of the individual’s circumstances. PRIORITY POINTS POLICY Where the Home Improvement Agency enquiries for assistance is over and above the resources for the Home Improvement Agency to deal with and to ensure the process is fair and equitable, we will set up a waiting list and allocate points to determine the applicant’s position. The Health & Safety, wellbeing and the needs of the enquirer, including any dependents, will be taken into account together with the length of time since the initial enquiry was taken. The number of points will then be categorised as red, amber or green, red being high priority. The category will be noted on the enquiry with additional points being automatically added monthly to the total whilst the enquiry remains on the list. This means that even an enquiry that was originally designated as low priority (green), will over a period of time rise to the top of the list. 14/27 Annex B For the purpose of the waiting list we will allocate the following points (only one set of points can be allocated per category) to determine the enquirer’s position from one, more than one, or all of the following criteria:1) Health Criteria 1:1 1.2: 1.3: Delayed Hospital Discharge (where property required attention e.g. heating/ repair works to prevent re-admission to hospital OR if heating/repair works are not carried out would have direct affect on health, delaying discharge from hospital Palliative Care Dependent with Health Issues 2) Work Criteria 2.1: 2.2: 2.3: 2.4: 2.5: 2.6: 2.7: Points Awarded 150 150 150 Points Awarded Property that is unfit for human habitation lacks basic amenities and affects the health, safety and wellbeing of the occupants (e.g. wiring, gas, no heating, no hot water) 250 Property where occupant is at risk from doorstep crime, burglary (e.g. seriously defective doors/and windows) 100 Disrepair, not dangerous but directly impacts on the health, comfort, safety & wellbeing of the occupants (e.g. dampness, timber rot and infestation) 100 Disrepair affecting the health, safety and wellbeing of the occupants (e.g. roof repairs) 80 Disrepair to the external structure of the property, not dangerous but not directly affecting the occupants health, safety and well being (e.g. structural problems, boundary walls) 60 Minor disrepair work not directly affecting occupants (e.g. door/window replacement) 20 Non-essential desirable work (e.g. cosmetic, modernisation) 0 15/27 Annex B 3) Age Criteria Points Awarded Adults 85 + 75 – 84 60 – 74 Under 60 100 80 60 30 Children 0 – 10 years (youngest child) 0 – 12 months 1-3 3–6 6 – 10 4) Income Criteria 4.1: 4.2: 4.3: 4.4: 4.5: 4.6: 4.7: Disability Living Allowance/Attendance Allowance Incapacity Benefit Income Support Pension Credit Working Families Tax Credit Council Tax Benefit or Local Housing Allowance Child Tax Credit 5) Other Factors 100 80 50 30 Points Awarded 100 100 100 80 40 20 20 up to 150 (Following Case Conference with Principal Officer and 2 Project Officers) Please explain why you are awarding extra points _______________________________________________ _______________________________________________ _______________________________________________ _______________________________________________ _______________________________________________ 16/27 Annex B 6) Length of time on Waiting List For each month since completion of original enquiry (this will be reviewed on a 3 monthly basis). Points Awarded 1 Points Awarded 1: Health 2: Work 3: Age 4: Income 5: Other 6: Time on Waiting List Total Points 7) Categories RED – over 500 points If you receive 500 points or over, this means that you are high priority and will receive a visit from the first available Project Officer within 3 working days (working days are Monday to Friday) from the date of your enquiry. AMBER - 300-500 points If you receive between 300 to 499 points, this means that you are medium priority and will receive a visit by the Project Officer/Assessor within 12 weeks from your date of enquiry. GREEN - up to 300 points If you receive up to 299 points, this means that you are low priority and will be advised at the time of enquiry that it is unlikely that you will receive a visit within the normal timescale of twelve weeks. You will be advised in writing that should your circumstances6 change or Salford City Council circumstances7 change that either party will be informed and that you will receive correspondence on a three monthly basis advising of the current situation. 6 Client circumstances could be related to their health, financial or living conditions Salford City Council circumstances could be related to the types of financial assistance that may be available, changes to policy or changes to the service offered by the Home Improvement Agency 7 17/27 Annex B 8) Summary This process provides our enquirers with:- - upon initial enquiry to the Home Improvement Agency they are within a moving process not just included on a stagnant list - a system that is auditable, transparent, easily understandable and completely fair - the length of time they are required to wait for assistance in relation to other enquiries on the list, is specific to their individual needs - the system can be tailored to meet local priorities - a system that will review all enquiries on a quarterly basis 18/27 Annex C SALFORD HOME IMPROVEMENT AGENCY (HIA) CUSTOMER ENQUIRY INFORMATION LEAFLET When you contact the HIA you will be advised at the time of enquiry if there is a waiting list and an approximate time when you can expect to receive the HIA service. This will be confirmed in writing detailing your enquiry reference number within 7 working days of the date of your enquiry and will also confirm the timescale for receiving the service. The normal timescale from receiving an enquiry for the service and a first visit by the Assessor is twelve weeks from first contact with the HIA There are times of the year when the response to your enquiry may not be as quick as other times of the year, e.g. when a member of staff is on annual leave, a member of staff is not well or there is an increase in the number of enquiries being received. If you do not receive a visit within the normal timescale of 12 weeks you will receive correspondence advising you of the current situation. This could mean that if the HIA receives a sudden increase of high priority cases this may affect your position. Also if your own circumstances change, if you contact the HIA we will review your position. Where the HIA enquiries for assistance is over and above the resources for the HIA to deal with and to ensure the process is fair and equitable, we will set up a waiting list and allocate points to determine the applicant’s position. This process ensures that from your initial enquiry to the HIA you are within a moving process not just included on a stagnant list. It is a system that is auditable, transparent, easily understandable and completely fair and that all enquiries will be reviewed on a quarterly basis You can obtain a full copy of the HIA Waiting List Management and Priority Points Policy from the HIA team. Contact details:Telephone: 0161 793 2896 E:mail: home-improvement.agency@salford.gov.uk 19/27 Annex D EIA Proforma People responsible assessment for the Rhys Wynne Sandra Mardell Housing and Planning Directorate Name of service, strategy, policy to be assessed Date of assessment Please provide a brief description of the service, strategy, policy or the proposed change to the service, strategy, policy Enquiry/ Referral Priority Points System Aug 08 To provide a transparent system detailing how enquiries will be dealt with if the waiting list is over and above the resources for the Home Improvement Agency to deal with. Priority ratings will be given in line with this to ensure an objective and fair prioritisation system. What factors, forces could contribute or detract from the outcome e.g. change in legislation, resources What are the aims of the service, To ensure that the most vulnerable people are given strategy, policy priority to access to the Home Improvement Agency service. Please list the main stakeholders, Stakeholders beneficiaries in terms of the recipients of the policy, strategy or Customers of the HIA the target group of the policy e.g. Home Improvement Agency tenants, partner agencies Salford Council ( C,H&SC, Housing and Planning and Environment ) PCT Beneficiaries Home Improvement Agency customers will benefit from agreed and transparent criteria with which to decide priority for assistance, and will benefit from a reduced waiting time before their problem is addressed. Home Improvement Agency will benefit from a tool that clearly prioritises the waiting list. The targeting of resources toward the upkeep and adaptation of the homes of vulnerable people could also benefit the following groups: The customers would 20/27 benefit from an increased ability to remain in their homes in the community for longer. Residents of the City would benefit from the increase in the availability of decent homes and a contribution to a robust housing market. The PCT would benefit from the reduction of admissions due to "slips, trips and falls" and the Community, Health and Social Care Department would benefit from an increased ability to enable the discharge of patients ,when they are ready, to appropriately repaired or adapted properties. Stage 1 Data analysis Please list any baseline, monitoring Census Data data you have e.g. census data, HIA Monitoring Data for people accessing the service local ward data, tenant profiles prior to the implementation of the policy Do you have equality monitoring Policy is new and has not been implemented as yet so this data on access to services related to information is unavailable at this time. the policy, strategy? If no, please go to STAGE 2 EIA Please list any relevant access to services data you have When comparing the baseline data with your access to services data are there any groups that are over or under represented? Please list. Do you have equality monitoring data on outcomes for different groups – this will link with the aims of your strategy, service, policy. If no, please go to STAGE 2 EIA Please list any relevant outcomes data you have When comparing the baseline data with your outcomes data are there any groups that are over or under represented? Please list. Have you identified any adverse impact from the data analysis for any group(s) Can this adverse impact be justified? e.g. having a women’s refuge for victims of domestic abuse may be justified 21/27 Stage 1 Action plan Please list any differential or un justified adverse impact identified and actions to rectify impact e.g. targeted consultation with groups under represented Issue identified Action Lead Time Outcome Annex D Stage 2 EIA – targeted consultation Please list all targeted consultation Panel of Service Users groups Older People People with Disabilities/Learning Difficulties People from LGBT community ( feedback due in September 08 ) What reasons has your consultation identified for any differential impact (e.g. under representation when accessing services) Please list all e.g. lack of information is community languages What reasons has your consultation identified for any adverse impact (e.g. in terms of outcomes for different groups) Please list all Is there a possibility that the strategy, policy may be damaging relations between different groups? Consultation with the above groups has not identified any problems as yet. However feedback from other groups awaited and policy will be monitored and reviewed after six month and consulted upon again following this. Please see previous answer Nothing has been identified, however this policy will be monitored and reviewed after 6 months to direct consultation. Stage 2 Action Plan Please list issues identified from targeted consultation and actions to rectify differential and adverse impact Issue identified Action Lead Time Outcome Baseline Monitor for six Rhys Feb 09 Identify any information months Wynne adverse impact unavailable as caused by the policy not policy through implemented as comparison with yet existing service user info. 22/27 Please ensure you have provided as much evidence as possible to support the responses you have given Additional comments Three focus groups of service users were initially formed and their feedback was used to inform the prioritisation process. With regards to equality impact due to lack of baseline monitoring information as policy has not been implemented as yet, we plan to monitor policies effect for six months, and then review the data comparing with monitoring information we have for service users prior to policy implementation . Following on from the analysis of this comparison, we would use this to identify any adverse impact and would consult with targeted groups representing any adversely effected diversity strand. Signed: Rhys Wynne (Completing officers) Signed: S. Mardell (Lead officer) Date: 28th August 2008 Publishing your completed EIA Once complete you must publish the results of your EIA, it is also important to share any best practice identified and to celebrate positive changes in strategy or service delivery that have occurred because of the EIA process. To publish your EIA please send a copy to the performance team Andrew.binnie@salford.gov.uk . They will ensure your EIA is published on the intranet and the internet. 23/27 Annex E SUMMARY OF TEST CASES Salford Home Improvement Agency was tested on 10 actual cases, results are:Test Case 1 The property has no heating; the occupants have no health problems, ages 75-84 and in receipt of Council Tax Benefit Points Criteria Health Work Age Income Other Length of time on waiting list TOTAL Points 0 150 80 20 0 1 251 Category Colour Green As this property had no heating a case conference was held resulting in increasing the work criteria 2:1 to 250 points which would put the enquiry into the Amber category and would receive a visit from the Assessor. From the visit, additional points could be awarded which would take the enquiry into the Red category Test Case 2 This property has a heating system that is working but intermittently, occupants are under 60, disabled and in receipt of incapacity benefit Points Criteria Health Work Age Income Other Length of time on waiting list TOTAL Points 0 100 30 100 0 1 231 Category Colour Green As the heating is working a referral would be made to Warm Front for a grant towards installing a new central heating boiler. At the time of enquiry the occupant would be told that if the boiler completely stopped working to contact the office and the points would be re-calculated which would result in a visit by the Assessor 24/27 Annex E Test Case 3 Property required new windows, occupants had a dependent with health issues, age 60-74 and in receipt of Attendance Allowance Points Criteria Health Work Age Income Other Length of time on waiting list TOTAL Points 150 20 60 100 0 0 331 Category Colour Amber This enquiry would receive a visit from the Assessor but may be advised that they would be put on a waiting list, but given a timescale for when their enquiry would be progressed Test Case 4 Minor disrepair to property, occupants have a child under 3, no health problems or benefits Points Criteria Health Work Age Income Other Length of time on waiting list TOTAL Points 8 20 80 0 0 0 100 Category Colour Green This enquiry would not receive a visit and would be advised that they would be put on a waiting list, but given a timescale for when their enquiry would be progressed Test Case 5 Property has no heating or hot water, occupant is terminally ill, under 60 with a prognosis of 12 months Points Criteria Health Work Age Income Other Length of time on waiting list TOTAL Points 150 250 30 100 150 0 530 Category Colour Red 25/27 This enquiry would be passed directly to the Project Officer (Caseworker) for immediate action Annex E Test Case 6 Property has no heating, occupant has a dependent with health issues, a child 6-10 yrs and in receipt of Disability Living Allowance Points Criteria Health Work Age Income Other Length of time on waiting list TOTAL Points 150 250 30 100 0 0 530 Category Colour Red This enquiry would be passed directly to the Project Officer (Caseworker) for immediate action Test Case 7 Property has oil fired heating system and occupant unable to afford the fuel so would like the system changing to gas, occupant has dependent with health issues, age 85 +, in receipt of Attendance Allowance Points Criteria Health Work Age Income Other Length of time on waiting list TOTAL Points 150 0 100 100 0 60 410 Category Colour Amber Points awarded, prior to the visit by the Assessor was 410. Following the visit and case conference, the points were re-calculated on fuel poverty ground also the occupant had mobility problems, therefore, the maximum 150 points were awarded in the “Other Factors” Test Case 8 This enquiry was because the main roof to the property was leaking, the occupant has a terminal illness, age 60-74 in receipt of Attendance Allowance Points Criteria Health Work Age Income Other Points 150 80 60 100 0 Category Colour 26/27 Length of time on waiting list TOTAL 0 390 Amber Annex E This enquiry would receive a visit by the Assessor, followed by case conference and awarding the maximum “Other Factors” points of 150, would move into Red, passing to Project Officer, Caseworker, for immediate action Test Case 9 There is no heating or electric to this property, the occupants have no health issues, ages 60-74. Points Criteria Health Work Age Income Other Length of time on waiting list TOTAL Points 0 250 60 0 0 0 310 Category Colour Amber This enquiry would receive a visit by the Assessor, where part of the assessment would be to look at benefits. This occupant was not in receipt of the correct benefits but after a successful application would be awarded 150 points for income Test Case 10 New windows/doors required, occupants had dependent with health issues, ages 6074 in receipt of Attendance Allowance Points Criteria Health Work Age Income Other Length of time on waiting list TOTAL Points 150 100 60 100 0 0 410 Category Colour Amber This enquiry would receive a visit by the Assessor, however, dependent on the assessment the occupant would be advised that they would be put on a waiting list, but given a timescale for when their enquiry would be progressed 27/27