Striving for Excellence

advertisement
Striving for Excellence
INTRODUCTION
Saket Projects Limited is a public limited multifunctionary organization established in 1995 with
access to Technical Management and other allied
services to the customers.
The activity areas include:
- Energy Management
- Event Management
- Industrial & Construction Publications
- Manufacturing Pharma Formulations
- Water Management
Striving for Excellence
Energy Management Division
Saket has played a pivotal role in establishing huge energy
saving in large number of industries with the help of highly
skilled
manpower
backed
up
by
state-of-the-art
microprocessor based instruments.

We were first to get the recognition as Approved Energy
Auditors from the Commissioner of Electricity, Government of
Gujarat. This was followed by –

Accreditation as an Energy Auditor by the Bureau of Energy
Efficiency (BEE), Ministry of Power .

Authorization as an ESCO Company Grade – 2 by the Bureau
of Energy Efficiency (BEE ), Ministry of Power

Recognition from PCRA (Petroleum Conservation
Association)

GEDA (Gujarat Energy Development Agency)

REDA (Rajasthan Energy Development Agency)
Striving for Excellence
Research
FUNCTIONS OF EMD
Identify Energy Savings
PAT
scheme
Technical Solutions
Cluster Audit
at SME
Sectors
Energy
Audit
Condition
Monitoring
ENERGY
MANAGEMENT
DIVISION
Bench Marking
within group
Conduct
Seminars
Implementation
Assistance
EPC
Post-Audit Support
Striving for Excellence
Knowledge Upgradation
A few list of our Prestigious Clients…
Striving for Excellence
Methodology & Approach For
Energy Audit






Electrical System
Water Pumping System
Compressed Air System
Refrigeration System
Blower and Fan Systems
Thermal System
Striving for Excellence
A
Case Study
on
Motor Load System in
Small Scale Industries
Striving for Excellence
MEASURED PARAMETERS WITH % LOADING
Sr.
No.
Motor Name
Measured Load
Rate
d
KW
VOLT
AMP
KW
P.F.
KVA
R
KVA
Hz
Effi.
(%)
Loadin
g (%)
1
Vessel No.1
5.5
394
8.70
3.63
0.61
4.67
5.84
50.0
77.2
51.0
2
Vessel No.2
5.5
399
6.15
2.64
0.62
3.33
4.20
49.6
77.2
37.1
3
Ice Crusher
2.2
391
2.21
1.65
0.56
2.44
2.95
49.9
71.0
53.3
4
Ball Mill.1
2.2
388
4.20
1.04
0.64
1.28
1.63
49.8
71.0
33.6
5
Ball Mill.2
5.5
382
7.19
2.17
0.22
4.59
4.69
49.8
77.2
30.5
6
Ball Mill.3
5.5
383
3.31
0.46
0.24
2.00
2.04
49.8
60.0
5.0
7
Pervaliser
5.5
386
5.75
1.92
0.50
3.45
3.77
49.9
77.2
26.9
8
Dryer.1
1.5
393
3.54
0.99
0.41
2.22
2.42
49.9
73.0
48.5
Striving for Excellence
Observations :
•
Generally in Small Scale Industries, 1 HP to 20 HP IE-1
category motors have been installed.
•
It has been seen form the measured parameters that
almost 60 to 70% motors are running under loaded.
•
Most of the electric motors are designed to run at 50 to
100 percent of rated load. Optimum efficiency of
motors are usually near to 50 - 100 percent of rated load.
•
Under loaded motors, those loaded below 50 % of rated
load are inefficient and exhibit low power factor.
•
Low power factor results
distribution system losses.
Striving for Excellence
in
increased
electrical
Saving Potential with IE 3 Motors
Sr.
No
Exis.
Effi.
%
Replace
Motor
KW
%
High
Effi.
Savin
g KW
Savin
g Rs.
Investm
ent Rs.
Pay Back
Months
Motor Name
Rated
KW
1
Vessel No.1
5.5
77.2
5.5
89.6
0.467
6250
17388
33.30
2
Vessel No.2
5.5
77.2
2.2
86.7
0.289
5998
7955
15.91
3
Ice Crusher
2.2
71.0
1.5
85.3
0.277
5736
6523
13.65
4
Ball Mill.1
2.2
71.0
1.1
84.4
0.165
3424
8470
29.69
5
Ball Mill.2
5.5
77.2
2.2
86.7
0.238
4930
7955
19.36
6
Ball Mill.3
5.5
60.0
0.75
82.5
0.125
1561
5184
39.0
7
Pervaliser
5.5
77.2
2.2
86.7
0.210
4362
7955
21.88
8
Dryer – 1
1.5
73
1.1
84.4
0.134
2773
8470
36.66
Striving for Excellence
Continued…
Based on the measured Parameters, we
recommend to replace the existing motors with
High energy efficient motors (IE-3) with suitable
size.
Total Saving
Investment
Payback
:
:
:
Rs.0.35Lacs/Annum
Rs.0.70Lacs.
24 Months.
Striving for Excellence
A
Case Study
on
Lighting System in
Small Scale Industries
Striving for Excellence
INTRODUCTION
Replacement of existing 40 W FTL fixtures
with 28 / 36W FTL with the use of Electronic
Ballast in Tube Light Circuit
Installation of Lighting Fixtures


40 W FTL
150 W HPSV
: 170 Nos.
: 20 Nos.
Striving for Excellence
SITE MEASUREMENTS



During the site work, we shall collect the details
of different types of fixtures i.e FTL,
HPSV/HPMV/MH etc.
By using the Lux meters, we shall measure the
lumens of different types of fixtures as per the
guideline of Bureau of Energy Efficiency, (BEE).
By using the power Analyzer, we shall measure
the total lighting load of the plant at different
phases of R,Y & B.
Striving for Excellence
Recommendation & Saving Potential:

We recommend to replacement of 40 W FTL by
Energy Efficient Tube Light T5 (28W) with Electronic
Ballast. Life span of T5 is higher than conventional Tube
Lights. Much higher output in lumens value against the
conventional tube light fittings.

We also suggest to replacement of 150W HPSV by 100W
MH due to longer life, high
efficiency,
fast
warm
up/Re-strike, superior cold starting, improve colour
uniformity, P.F. is higher compared to HPSV.
Striving for Excellence
Saving Potential by replacing 150 W HPSV with 100 W MH:
1. Quantity
2. Operational time per day
3. Operating days per Annum
4. Electricity Tariff Rs./Kwh
5. Power Cons. With exiting 150 W HPSV
6. Power Cons. With 100 W MH
7. Total Net Savings for 80 Fix./year
8. Total Investment(@ Rs. 2200/fix.)
9. Pay Back Period
Striving for Excellence
:20
:14 Hrs.
:300
:5.39
:170 W
:122 W
:Rs. 26,441/:Rs. 44,000/:20 Months
Saving Potential by replacing 40 W with T5 (28W) T/L:
1. Quantity
:170
2. Operational time per day
:14 Hrs.
3. Operating days per Annum
:300
4. Electricity Tariff Rs./Kwh
:5.33
5. Power Cons. With exiting 40 W FTL :55 W
6. Power Cons. With 28 W T5 FTL
:30 W
7. Total Net Savings for 170 Fix./year :Rs. 81,549/8. Total Investment(@ Rs. 900/fix.)
:Rs. 1,53,000/9. Pay Back Period
:22 Months
Striving for Excellence
Saving Potential
Total Identified Energy Saving Potential in
Lighting Systems as under.
Saving
: Rs. 1.07 Lacs/Annum
Investment
: Rs. 1.97 Lacs.
Payback
: 21 Months.
Striving for Excellence
Thanks
37
Striving for Excellence
Download