Presentation Sequence
•
•
•
•
Review of SEMP Status
Review of Replan
Budget
Next Steps
2
SEMP Status
3
SEMP Tracking
•
•
Tracked (Excel)
version of the plan
posted at
http://www.oir.caltech.e
du/twiki_oir/pub/Keck/
NGAO/SystemDesignP
hasePlanning/NGAO_
SD_schedule_v20_trac
ked_final.xls
Excel version
highlights what’s
complete, what’s late,
what’s due within next
month & status of work
scope planning sheets.
3
3.1
3.1.1
3.1.1.1
3.1.1.1.1
3.1.1.1.1.1
3.1.1.1.1.2
3.1.1.1.2
3.1.1.1.3
3.1.1.1.4
3.1.1.2
3.1.1.2.1
3.1.1.2.2
3.1.1.2.3
3.1.1.2.4
3.1.1.2.5
3.1.1.3
3.1.1.4
3.1.1.4.1
3.1.1.4.2
3.1.1.5
3.1.1.5.1
3.1.1.5.2
3.1.1.6
3.1.1.7
3.1.1.8
3.1.1.9
3.1.1.10
3.1.1.11
3.1.1.12
3.1.1.13
3.1.1.13.1
3.1.1.13.2
3.1.1.14
3.1.1.14.1
3.1.1.14.2
3.1.1.14.2.1
3.1.1.14.2.2
3.1.1.14.2.3
3.1.2
3.1.2.1
3.1.2.1.1
System Design
Systems Engineering
Performance Budgets
Model Assumptions
TMT site monitoring data mining
Tools in place & 1st release
Release updated data (every two months)
Telescope dynamic performance data
Telescope static wavefront errors
Sodium return vs laser format
Model/Tool Validation
Agreement between Tomography Codes
Agreement between Sky Coverage Codes
Anchor to Keck II LGS AO PSFs
Anchor to On-sky MGSU Experiments
Anchor to LAO Lab Experiments
Throughput
Background
Document Proposal Analysis
Develop Background Performance Budget
Wavefront Error vs Sky Coverage
Document WFE Budget Rev 1
Document WFE Budget Rev 2
Encircled Energy vs Sky Coverage
Photometric Accuracy
Astrometric Accuracy
Polarimetric Accuracy
Companion Sensitivity
Observing Efficiency
Observing Uptime
Performance Budgets Summary
Performance Budgets Summary Ver 1
Performance Budgets Summary Ver 2
Science Products
All-In Science Simulations
Additional Science Characterization Results
Point Source Sensitivities
PSF Uniformity & Stability
Other
Trade Studies
System Architecture Trade Studies
MOAO & MCAO TS
PW
RD
RD
CN
RF
RF
RF
CN
CN
DG
CN
DG
RD
CN
RF
DG
AB
AB
AB
AB
RD
RD
RD
DG
MB
BC
MI
BM
DLM
EJ
RD
RD
CN
AB
CN
RF
RD
DG
16%
40%
52%
63%
55%
100%
50%
100%
100%
100%
68%
100%
100%
25%
100%
50%
50%
47%
25%
50%
33%
50%
0%
75%
100%
50%
75%
75%
50%
25%
0%
0%
0%
0%
0%
0%
0%
0%
0%
37%
62%
100%
9,826 hrs
5,256 hrs
2,346 hrs
260 hrs
80 hrs
40 hrs
40 hrs
120 hrs
20 hrs
40 hrs
334 hrs
40 hrs
40 hrs
40 hrs
10 hrs
204 hrs
32 hrs
50 hrs
10 hrs
40 hrs
110 hrs
40 hrs
70 hrs
110 hrs
240 hrs
240 hrs
40 hrs
240 hrs
100 hrs
80 hrs
160 hrs
100 hrs
60 hrs
350 hrs
160 hrs
190 hrs
30 hrs
80 hrs
80 hrs
1,790 hrs
690 hrs
80 hrs
08/14/06
08/14/06
08/14/06
08/14/06
08/14/06
08/14/06
09/18/06
10/02/06
10/02/06
11/01/06
08/14/06
08/14/06
10/16/06
10/02/06
11/10/06
11/06/06
10/02/06
10/02/06
10/02/06
10/02/06
10/02/06
10/02/06
12/27/06
10/23/06
10/16/06
11/13/06
02/05/07
11/13/06
02/05/07
11/05/07
01/31/07
01/31/07
07/02/07
07/23/07
07/23/07
08/20/07
08/20/07
08/20/07
10/01/07
10/16/06
10/16/06
11/13/06
01/18/08
12/28/07
12/12/07
06/29/07
06/29/07
09/14/06
06/29/07
11/30/06
11/30/06
11/30/06
12/15/06
09/29/06
11/03/06
10/30/06
11/15/06
12/15/06
12/29/06
01/09/07
10/12/06
01/09/07
01/30/07
12/08/06
01/30/07
12/29/06
01/26/07
06/29/07
03/09/07
01/09/07
03/16/07
12/12/07
07/20/07
02/27/07
07/20/07
10/19/07
08/17/07
10/19/07
09/13/07
09/07/07
10/19/07
05/25/07
03/30/07
12/15/06
4
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
SEMP Summary 1
• WBS 1. SD Phase Management
– On-schedule, except for replan (~ 1 month late)
• WBS 2.1. Science Requirements
– 1 work scope planning sheet approved. No others submitted.
– All 13 science cases scheduled for completion by end of April. None
completed.
– Version 1 of Science Case Requirements complete. Version 2 due in Mar/07
• WBS 2.2-2.3. System Requirements Document
– 1 planning sheet approved, 2 late.
– Version 1 complete. Version 2 due in March. Need more feedback,
especially on science operations requirements.
– Version 1&2 of traceability matrix late.
5
SEMP Summary 2
•
WBS 3.1.1. Performance Budgets
–
–
–
–
–
•
8 planning sheets approved, 1 submitted, 5 late.
Model assumptions. 3 complete & 1 on schedule.
Model/tool validation. 3 complete & 2 late.
Performance budgets. 1 complete, 6 late (2 others due later).
Version 1 of summary late.
WBS 3.1.2. Trade Studies (29 total)
– 12 planning sheets approved, 1 needs changes, 11 late.
– 9 complete, 1 cancelled & 15 late.
•
WBS 3.1.3. System Architecture.
– Version 1 should have started, but hasn’t.
•
WBS 3.4. Science Operations
– 2 WBS elements should have been started pre-March, but haven’t & another 5 should
have started in Mar.
•
WBS 3.5 Science Instruments
– Only Interferometer started. 4 others should have been started & 1 is late.
•
WBS 4 SEMP
– No significant work planned yet
6
SEMP
Milestones
Status
MILESTONE
DATE
DESCRIPTION
SD SEMP Approved
10/9/06
Approval of this plan by the Directors. Initial SEMP version
released to Directors for comment on 9/12 & final version on
9/29/06.
SD phase contracts in place
10/27/06
Contracts issued to Caltech & UCSC for the system design
phase.
Science Requirements Summary v1.0 Release
10/27/06
Initial Release of the Science Requirements as input to trade
studies and performance budgeting
System Requirements Document (SRD) v1.0
Release
12/8/06
Initial release of System Requirements with emphasis on the
science requirements
Performance Budgets Summary v1.0 Release
2/27/07
First round of all performance budgets complete &
documented
SRD v2.0 Release
3/22/07
Second release of System Requirements Doc
Trade Studies Complete
5/25/07
All trade studies complete & documented (as a series of
Keck Adaptive Optics Notes)
SRD v3.0 Release
7/12/07
Third release of System Requirements
System Design Manual (SDM) v1.0 Release
8/31/07
First release of System Design Manual
Technical Risk Analysis v1.0 Release
11/13/07
First round of project risk analysis complete & documented
Cost Review Complete
11/30/07
Project cost estimates complete, documented & internally
reviewed
SDM v2.0 Release
1/8/07
Second release of System Design Manual
System Design Review Package Distributed
3/4/08
SDR documents sent to reviewers
System Design Review
3/31/08
SDR meeting
SDR Report & Project Planning Presentation at SSC
meeting
4/14/08
Final SD phase report including results of SDR & project
plans
7
Meeting Tracking
• The tracked version of the action items from each meeting are posted
near the top of the meeting page
–
–
–
–
–
–
Meeting 2 http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061114_CIT_NGAO_Meeting_2
Meeting 3 http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061213_Remote_NGAO_Meeting_3
Meeting 4 http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/070122_NGAO_Meeting_4
Meeting 5 http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/070307_Remote_NGAO_Meeting_5
The bulk of the action items are incomplete
Remember to look at these action items for action items on your
presentation (that should be incorporated in the final KAON).
• The minutes & action items from the EC meetings are posted at
http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/SystemDesignPhasePlanning
8
Posted KAONs
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
415 TMT site monitoring data (restricted access)
416 Atmospheric sodium density from Keck LGS photometry
417 Sodium abundance data from MAUI Mesosphere
419 Simple models for the prediction of Na LGS brightness & comparison to measured returns from the
Gemini & Keck lasers
420 Accessing the MK TMT seeing & weather data
427 Variable vs fixed LGS asterism
428 Implications & requirements for interferometry with NGAO
429 LGS asterism geometry & size
452 MOAO vs MCAO trade study report
455 Science Case Requirements Document v1.0
456 System Requirements Document v1.1
459 NGAO System Design Phase Report #1
461 Wavefront error budget predictions & measured performance for current & upgraded Keck AO
462 Keck AO upgrade trade study
463 Lessons learned on LGS operations: weather impact, efficiency & science ops model
465 NGAO LGS wavefront sensor: Type & number of subapertures trade study
466 Computer simulations of AO PSFs for NGAO
468 An algorithm for reconstruction of Keck Telescope segment figure errors
470 Keck NGAO sky coverage modeling
472 GLAO for non-NGAO Instruments
473 NGAO System Design Phase Report #2
474 AO Photometry for NGAO
475 Tomography codes comparison & validation for NGAO
476 Observing Models trade study
9
Reasons for Replan
• Significantly behind schedule
• Behind on earned value: 29% of labor & dollars spent, but plan only
24% complete
• Planned opportunity (scheduled in SEMP) to revisit plan approach,
priorities, tasks, personnel, dictionary definitions, etc.
• We also need to improve how we are managing this project
– Schedule and budget are tools in accomplishing the project
10
Replan
http://www.oir.caltech.edu/twiki_oir/pub/Keck/NGAO/SystemDesignPhasePlanning/NGAO_SD_schedule_v24.mpp
11
System Requirements Replan
12
Changes made in Replan
WBS
•
•
Excel summary of MS
Project changes
between versions 20 &
24 posted at
http://www.oir.caltech.e
du/twiki_oir/pub/Keck/
NGAO/SystemDesignP
hasePlanning/NGAO_
SD_schedule_v24.xls
Highlights what’s
changed.
Task
Change
Move start to 3/19. End to 3/27.
Cancel? Change to science meetings?
Change date from 4/18 to 4/25&26
Move ahead 1 week
Remove 8h of SK
1.1.7
1.2.2
1.2.3.6
1.3.7
1.5.2.4
Mid-yr Replan
Science Advisory Committee Telecons
Team Meeting #6 (UCSC)
Keck Science Meeting
System Design Review support
2.1.1.1
2.1.1.1.3
2.1.1.2
2.1.1.2.3
2.1.1.3
date for all subtasks 5/15/07. FM lead
Bodies
New end
Companions & Multiplicity of Small Solar System
Change lead & hrs to DLM
Observing Scenarios
New end date for all subtasks 8/31/07. FM lead
Moons of the Giant Planets
Change lead & hrs to DLM
Observing Scenarios
New end date for all subtasks 5/15/07. FM lead
Shape & Size of Asteroids
End date for 2.1.2.1.1 ?. New end date for rest of
Galactic Center Proper Motions: Astrometry 7/2/07. Changed all to 7/2/7
8/1/07
Spectroscopy
subtasks
for allField
Integral
New end date
Galactic Center Radial Velocities & Stellar Populations:
student2 effort.
Variability
200h of
Polarimetry
Remove
& 2 um
Cancel.
Galactic Center Nature of Sgr A*: 3-5 um Color
all subtasks 6/1/07
date for Sensitivity
Companion
New end
Planets around Low Mass Stars & Brown Dwarfs:
end date for all subtasks 7/2/07
New Contrast
Debris Disks, Protostellar Envelopes & Outflows:
New end date for all subtasks 8/31/07. Change
date to 5/15/07
start Polarimetry
Debris Disks, Protostellar Envelopes & Outflows:
New end date for all subtasks 10/1/07
Resolved Stellar Populations in Crowded Fields
New end date for all subtasks 6/1/07
High Redshift Galaxies
New end date for all subtasks 8/31/07
Nearby Galaxies
New end date for all subtasks 7/2/07
Gravitational Lensing
Change name to Science Case Requirements
Document
Science Requirements Summary
New end date of 6/1/07. New start 4/2.
Science Requirements Summary Rev 2
New end date of 7/9/07
Science Requirements Summary Rev 3
Change end date to 5/8/07
Science Operations Requirements
Change lead to PW.
Observatory Reqments rev 2
Remove 2.2.4 as predecessor
Observatory Reqments rev 3
Remove 2.2.5 as predecessor
Observatory Reqments rev 4
Do we need this?
Traceability Matrix
Reduce from 80h total to 10h of Wizinowich. PW
as lead
Traceability Matrix rev 2
Change lead of all subtasks & hrs to PW.
SRD
Remove 2.2.3 as a precursor
SRD Rev 1
Change start to 4/16 & end to 5/15/07. Change
predecessor from SCRD2 to 1.
SRD Rev 2
Change start to 7/17 & end to 7/30/07.
SRD Rev 3
2.1.2.1
2.1.2.2
2.1.2.3
2.1.2.4
2.1.2.5
2.1.2.6
2.1.3.1
2.1.3.2
2.1.3.3
2.1.3.4
2.1.4
2.1.4.2
2.1.4.3
2.2.3
2.2.4
2.2.5
2.2.6
2.3.1
2.3.1.2
2.3.2
2.3.2.1
2.3.2.2
2.3.2.3
Actuals
13
Replan
Milestones
(changes in bold)
MILESTONE
DATE
DESCRIPTION
SD SEMP Approved
10/9/06
Approval of this plan by the Directors. Initial SEMP version
released to Directors for comment on 9/12 & final version on
9/29/06.
SD phase contracts in place
10/27/06
Contracts issued to Caltech & UCSC for the system design
phase.
Science Requirements Summary v1.0 Release
10/27/06
Initial Release of the Science Requirements as input to trade
studies and performance budgeting
System Requirements Document (SRD) v1.0
Release
12/8/06
Initial release of System Requirements with emphasis on the
science requirements
Performance Budgets Summary v1.0 Release
6/15/07
First round of all performance budgets complete &
documented
SRD v2.0 Release
5/22/07
Second release of System Requirements Doc
Trade Studies Complete
6/8/07
All trade studies complete & documented (as a series of
Keck Adaptive Optics Notes)
SRD v3.0 Release
8/6/07
Third release of System Requirements
System Design Manual (SDM) v1.0 Release
9/6/07
First release of System Design Manual
Technical Risk Analysis v1.0 Release
9/21/07
First round of project risk analysis complete & documented
Cost Review Complete
11/30/07
Project cost estimates complete, documented & internally
reviewed
SDM v2.0 Release
2/21/08
Second release of System Design Manual
System Design Review Package Distributed
3/4/08
SDR documents sent to reviewers
System Design Review
3/31/08
SDR meeting
SDR Report & Project Planning Presentation at SSC
meeting
4/14/08
Final SD phase report including results of SDR & project
plans
14
Replan
Month
System Design
Phase Mgmt
(WBS1)
May/07
Requirements
(WBS2 & 3.1.3.3)
SCRD v2
SRD v2
FRD v0 & Sci
Instrum FRD v1
Prog Rep #3
Jun/07
SCRD & SRD v3
Jul/07
Laser Fac FRD v1
Sci Ops FRD v1
System Eng
(WBS3.1)
Perf budgets
Trade studies
Define candidate
subsystems
Perf budget
summary v1
Eval candidate
subsystems
Org candidate
subsystems
Define candidate
architectures
Eval candidate
architectures
Aug/07
Prog Rep #4
AO Sys FRD v1
KSM
Select candidate
architectures
Technical risk
analysis v1
Sep/07
Perf budget
summary v2
Oct/07
Prog Rep #5
Nov/07
Dec/07
Prog Rep #6
Jan/08
Feb/08
SDR
Mar/08
Apr/08
Proj Rep #7
SDR Report
response
FRD v2
Design (WBS3.2
to 3.6)
System Eng
Mgmt Plan
(WBS4)
Science Ops
Laser Facility
Science Ops
Laser Facility &
Science Ops
SDM v1
AO System
Laser Facility &
Science Ops
d-IFU report v1
AO System, Laser
Facility & Science
Ops
Imager/Spect v1
AO System
Laser Facility &
Science Ops
AO System
Laser Facility
Science Ops
Science Ops
IFU Report v1
SDM v2
IFU Report v2
d-IFU report v2
Imager/Spect v2
SEMP + Cost
review
SEMP
Cost review
SEMP
SEMP
SEMP
15
Budget
Budget Item
Work-hours Spent
Work-hours Remaining
Total work hours =
Personnel $k Spent
Personnel $k Remaining
Travel $k Spent
Travel $k Remaining
Contingency $k Spent
Contingency $k Remaining
Total $k =
SEMP (thru
Mar/07)
4850
11875
16725
Replan
4858
11009
15867
268.9
710
12.2
47.8
0
103.9
1142.8
268.9
688.4
12.2
47.8
0
125.5
1142.8
Reduction in replan labor largely due to removing 1230h of students
16
Next Steps
• Complete Replan with Team’s input
–
–
–
–
–
Determine how to proceed with System Architecture
New & revised WBS dictionary definitions
Improved management strategies
More focused team
Redo team meeting goals
• Complete the following items in May:
–
–
–
–
–
SCRD & SRD v2
FRD v0 & Science Instruments FRD v1
Performance budgets summary
Trade Studies
Define Candidate Subsystems
+ Remember to do work scope planning sheets for new tasks
17