NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007 Presentation Sequence • • • • Review of SEMP Status Review of Replan Budget Next Steps 2 SEMP Status 3 SEMP Tracking • • Tracked (Excel) version of the plan posted at http://www.oir.caltech.e du/twiki_oir/pub/Keck/ NGAO/SystemDesignP hasePlanning/NGAO_ SD_schedule_v20_trac ked_final.xls Excel version highlights what’s complete, what’s late, what’s due within next month & status of work scope planning sheets. 3 3.1 3.1.1 3.1.1.1 3.1.1.1.1 3.1.1.1.1.1 3.1.1.1.1.2 3.1.1.1.2 3.1.1.1.3 3.1.1.1.4 3.1.1.2 3.1.1.2.1 3.1.1.2.2 3.1.1.2.3 3.1.1.2.4 3.1.1.2.5 3.1.1.3 3.1.1.4 3.1.1.4.1 3.1.1.4.2 3.1.1.5 3.1.1.5.1 3.1.1.5.2 3.1.1.6 3.1.1.7 3.1.1.8 3.1.1.9 3.1.1.10 3.1.1.11 3.1.1.12 3.1.1.13 3.1.1.13.1 3.1.1.13.2 3.1.1.14 3.1.1.14.1 3.1.1.14.2 3.1.1.14.2.1 3.1.1.14.2.2 3.1.1.14.2.3 3.1.2 3.1.2.1 3.1.2.1.1 System Design Systems Engineering Performance Budgets Model Assumptions TMT site monitoring data mining Tools in place & 1st release Release updated data (every two months) Telescope dynamic performance data Telescope static wavefront errors Sodium return vs laser format Model/Tool Validation Agreement between Tomography Codes Agreement between Sky Coverage Codes Anchor to Keck II LGS AO PSFs Anchor to On-sky MGSU Experiments Anchor to LAO Lab Experiments Throughput Background Document Proposal Analysis Develop Background Performance Budget Wavefront Error vs Sky Coverage Document WFE Budget Rev 1 Document WFE Budget Rev 2 Encircled Energy vs Sky Coverage Photometric Accuracy Astrometric Accuracy Polarimetric Accuracy Companion Sensitivity Observing Efficiency Observing Uptime Performance Budgets Summary Performance Budgets Summary Ver 1 Performance Budgets Summary Ver 2 Science Products All-In Science Simulations Additional Science Characterization Results Point Source Sensitivities PSF Uniformity & Stability Other Trade Studies System Architecture Trade Studies MOAO & MCAO TS PW RD RD CN RF RF RF CN CN DG CN DG RD CN RF DG AB AB AB AB RD RD RD DG MB BC MI BM DLM EJ RD RD CN AB CN RF RD DG 16% 40% 52% 63% 55% 100% 50% 100% 100% 100% 68% 100% 100% 25% 100% 50% 50% 47% 25% 50% 33% 50% 0% 75% 100% 50% 75% 75% 50% 25% 0% 0% 0% 0% 0% 0% 0% 0% 0% 37% 62% 100% 9,826 hrs 5,256 hrs 2,346 hrs 260 hrs 80 hrs 40 hrs 40 hrs 120 hrs 20 hrs 40 hrs 334 hrs 40 hrs 40 hrs 40 hrs 10 hrs 204 hrs 32 hrs 50 hrs 10 hrs 40 hrs 110 hrs 40 hrs 70 hrs 110 hrs 240 hrs 240 hrs 40 hrs 240 hrs 100 hrs 80 hrs 160 hrs 100 hrs 60 hrs 350 hrs 160 hrs 190 hrs 30 hrs 80 hrs 80 hrs 1,790 hrs 690 hrs 80 hrs 08/14/06 08/14/06 08/14/06 08/14/06 08/14/06 08/14/06 09/18/06 10/02/06 10/02/06 11/01/06 08/14/06 08/14/06 10/16/06 10/02/06 11/10/06 11/06/06 10/02/06 10/02/06 10/02/06 10/02/06 10/02/06 10/02/06 12/27/06 10/23/06 10/16/06 11/13/06 02/05/07 11/13/06 02/05/07 11/05/07 01/31/07 01/31/07 07/02/07 07/23/07 07/23/07 08/20/07 08/20/07 08/20/07 10/01/07 10/16/06 10/16/06 11/13/06 01/18/08 12/28/07 12/12/07 06/29/07 06/29/07 09/14/06 06/29/07 11/30/06 11/30/06 11/30/06 12/15/06 09/29/06 11/03/06 10/30/06 11/15/06 12/15/06 12/29/06 01/09/07 10/12/06 01/09/07 01/30/07 12/08/06 01/30/07 12/29/06 01/26/07 06/29/07 03/09/07 01/09/07 03/16/07 12/12/07 07/20/07 02/27/07 07/20/07 10/19/07 08/17/07 10/19/07 09/13/07 09/07/07 10/19/07 05/25/07 03/30/07 12/15/06 4 R R R R R R R R R R R R R R R R R R SEMP Summary 1 • WBS 1. SD Phase Management – On-schedule, except for replan (~ 1 month late) • WBS 2.1. Science Requirements – 1 work scope planning sheet approved. No others submitted. – All 13 science cases scheduled for completion by end of April. None completed. – Version 1 of Science Case Requirements complete. Version 2 due in Mar/07 • WBS 2.2-2.3. System Requirements Document – 1 planning sheet approved, 2 late. – Version 1 complete. Version 2 due in March. Need more feedback, especially on science operations requirements. – Version 1&2 of traceability matrix late. 5 SEMP Summary 2 • WBS 3.1.1. Performance Budgets – – – – – • 8 planning sheets approved, 1 submitted, 5 late. Model assumptions. 3 complete & 1 on schedule. Model/tool validation. 3 complete & 2 late. Performance budgets. 1 complete, 6 late (2 others due later). Version 1 of summary late. WBS 3.1.2. Trade Studies (29 total) – 12 planning sheets approved, 1 needs changes, 11 late. – 9 complete, 1 cancelled & 15 late. • WBS 3.1.3. System Architecture. – Version 1 should have started, but hasn’t. • WBS 3.4. Science Operations – 2 WBS elements should have been started pre-March, but haven’t & another 5 should have started in Mar. • WBS 3.5 Science Instruments – Only Interferometer started. 4 others should have been started & 1 is late. • WBS 4 SEMP – No significant work planned yet 6 SEMP Milestones Status MILESTONE DATE DESCRIPTION SD SEMP Approved 10/9/06 Approval of this plan by the Directors. Initial SEMP version released to Directors for comment on 9/12 & final version on 9/29/06. SD phase contracts in place 10/27/06 Contracts issued to Caltech & UCSC for the system design phase. Science Requirements Summary v1.0 Release 10/27/06 Initial Release of the Science Requirements as input to trade studies and performance budgeting System Requirements Document (SRD) v1.0 Release 12/8/06 Initial release of System Requirements with emphasis on the science requirements Performance Budgets Summary v1.0 Release 2/27/07 First round of all performance budgets complete & documented SRD v2.0 Release 3/22/07 Second release of System Requirements Doc Trade Studies Complete 5/25/07 All trade studies complete & documented (as a series of Keck Adaptive Optics Notes) SRD v3.0 Release 7/12/07 Third release of System Requirements System Design Manual (SDM) v1.0 Release 8/31/07 First release of System Design Manual Technical Risk Analysis v1.0 Release 11/13/07 First round of project risk analysis complete & documented Cost Review Complete 11/30/07 Project cost estimates complete, documented & internally reviewed SDM v2.0 Release 1/8/07 Second release of System Design Manual System Design Review Package Distributed 3/4/08 SDR documents sent to reviewers System Design Review 3/31/08 SDR meeting SDR Report & Project Planning Presentation at SSC meeting 4/14/08 Final SD phase report including results of SDR & project plans 7 Meeting Tracking • The tracked version of the action items from each meeting are posted near the top of the meeting page – – – – – – Meeting 2 http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061114_CIT_NGAO_Meeting_2 Meeting 3 http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061213_Remote_NGAO_Meeting_3 Meeting 4 http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/070122_NGAO_Meeting_4 Meeting 5 http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/070307_Remote_NGAO_Meeting_5 The bulk of the action items are incomplete Remember to look at these action items for action items on your presentation (that should be incorporated in the final KAON). • The minutes & action items from the EC meetings are posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/SystemDesignPhasePlanning 8 Posted KAONs • • • • • • • • • • • • • • • • • • • • • • • • 415 TMT site monitoring data (restricted access) 416 Atmospheric sodium density from Keck LGS photometry 417 Sodium abundance data from MAUI Mesosphere 419 Simple models for the prediction of Na LGS brightness & comparison to measured returns from the Gemini & Keck lasers 420 Accessing the MK TMT seeing & weather data 427 Variable vs fixed LGS asterism 428 Implications & requirements for interferometry with NGAO 429 LGS asterism geometry & size 452 MOAO vs MCAO trade study report 455 Science Case Requirements Document v1.0 456 System Requirements Document v1.1 459 NGAO System Design Phase Report #1 461 Wavefront error budget predictions & measured performance for current & upgraded Keck AO 462 Keck AO upgrade trade study 463 Lessons learned on LGS operations: weather impact, efficiency & science ops model 465 NGAO LGS wavefront sensor: Type & number of subapertures trade study 466 Computer simulations of AO PSFs for NGAO 468 An algorithm for reconstruction of Keck Telescope segment figure errors 470 Keck NGAO sky coverage modeling 472 GLAO for non-NGAO Instruments 473 NGAO System Design Phase Report #2 474 AO Photometry for NGAO 475 Tomography codes comparison & validation for NGAO 476 Observing Models trade study 9 Reasons for Replan • Significantly behind schedule • Behind on earned value: 29% of labor & dollars spent, but plan only 24% complete • Planned opportunity (scheduled in SEMP) to revisit plan approach, priorities, tasks, personnel, dictionary definitions, etc. • We also need to improve how we are managing this project – Schedule and budget are tools in accomplishing the project 10 Replan http://www.oir.caltech.edu/twiki_oir/pub/Keck/NGAO/SystemDesignPhasePlanning/NGAO_SD_schedule_v24.mpp 11 System Requirements Replan 12 Changes made in Replan WBS • • Excel summary of MS Project changes between versions 20 & 24 posted at http://www.oir.caltech.e du/twiki_oir/pub/Keck/ NGAO/SystemDesignP hasePlanning/NGAO_ SD_schedule_v24.xls Highlights what’s changed. Task Change Move start to 3/19. End to 3/27. Cancel? Change to science meetings? Change date from 4/18 to 4/25&26 Move ahead 1 week Remove 8h of SK 1.1.7 1.2.2 1.2.3.6 1.3.7 1.5.2.4 Mid-yr Replan Science Advisory Committee Telecons Team Meeting #6 (UCSC) Keck Science Meeting System Design Review support 2.1.1.1 2.1.1.1.3 2.1.1.2 2.1.1.2.3 2.1.1.3 date for all subtasks 5/15/07. FM lead Bodies New end Companions & Multiplicity of Small Solar System Change lead & hrs to DLM Observing Scenarios New end date for all subtasks 8/31/07. FM lead Moons of the Giant Planets Change lead & hrs to DLM Observing Scenarios New end date for all subtasks 5/15/07. FM lead Shape & Size of Asteroids End date for 2.1.2.1.1 ?. New end date for rest of Galactic Center Proper Motions: Astrometry 7/2/07. Changed all to 7/2/7 8/1/07 Spectroscopy subtasks for allField Integral New end date Galactic Center Radial Velocities & Stellar Populations: student2 effort. Variability 200h of Polarimetry Remove & 2 um Cancel. Galactic Center Nature of Sgr A*: 3-5 um Color all subtasks 6/1/07 date for Sensitivity Companion New end Planets around Low Mass Stars & Brown Dwarfs: end date for all subtasks 7/2/07 New Contrast Debris Disks, Protostellar Envelopes & Outflows: New end date for all subtasks 8/31/07. Change date to 5/15/07 start Polarimetry Debris Disks, Protostellar Envelopes & Outflows: New end date for all subtasks 10/1/07 Resolved Stellar Populations in Crowded Fields New end date for all subtasks 6/1/07 High Redshift Galaxies New end date for all subtasks 8/31/07 Nearby Galaxies New end date for all subtasks 7/2/07 Gravitational Lensing Change name to Science Case Requirements Document Science Requirements Summary New end date of 6/1/07. New start 4/2. Science Requirements Summary Rev 2 New end date of 7/9/07 Science Requirements Summary Rev 3 Change end date to 5/8/07 Science Operations Requirements Change lead to PW. Observatory Reqments rev 2 Remove 2.2.4 as predecessor Observatory Reqments rev 3 Remove 2.2.5 as predecessor Observatory Reqments rev 4 Do we need this? Traceability Matrix Reduce from 80h total to 10h of Wizinowich. PW as lead Traceability Matrix rev 2 Change lead of all subtasks & hrs to PW. SRD Remove 2.2.3 as a precursor SRD Rev 1 Change start to 4/16 & end to 5/15/07. Change predecessor from SCRD2 to 1. SRD Rev 2 Change start to 7/17 & end to 7/30/07. SRD Rev 3 2.1.2.1 2.1.2.2 2.1.2.3 2.1.2.4 2.1.2.5 2.1.2.6 2.1.3.1 2.1.3.2 2.1.3.3 2.1.3.4 2.1.4 2.1.4.2 2.1.4.3 2.2.3 2.2.4 2.2.5 2.2.6 2.3.1 2.3.1.2 2.3.2 2.3.2.1 2.3.2.2 2.3.2.3 Actuals 13 Replan Milestones (changes in bold) MILESTONE DATE DESCRIPTION SD SEMP Approved 10/9/06 Approval of this plan by the Directors. Initial SEMP version released to Directors for comment on 9/12 & final version on 9/29/06. SD phase contracts in place 10/27/06 Contracts issued to Caltech & UCSC for the system design phase. Science Requirements Summary v1.0 Release 10/27/06 Initial Release of the Science Requirements as input to trade studies and performance budgeting System Requirements Document (SRD) v1.0 Release 12/8/06 Initial release of System Requirements with emphasis on the science requirements Performance Budgets Summary v1.0 Release 6/15/07 First round of all performance budgets complete & documented SRD v2.0 Release 5/22/07 Second release of System Requirements Doc Trade Studies Complete 6/8/07 All trade studies complete & documented (as a series of Keck Adaptive Optics Notes) SRD v3.0 Release 8/6/07 Third release of System Requirements System Design Manual (SDM) v1.0 Release 9/6/07 First release of System Design Manual Technical Risk Analysis v1.0 Release 9/21/07 First round of project risk analysis complete & documented Cost Review Complete 11/30/07 Project cost estimates complete, documented & internally reviewed SDM v2.0 Release 2/21/08 Second release of System Design Manual System Design Review Package Distributed 3/4/08 SDR documents sent to reviewers System Design Review 3/31/08 SDR meeting SDR Report & Project Planning Presentation at SSC meeting 4/14/08 Final SD phase report including results of SDR & project plans 14 Replan Month System Design Phase Mgmt (WBS1) May/07 Requirements (WBS2 & 3.1.3.3) SCRD v2 SRD v2 FRD v0 & Sci Instrum FRD v1 Prog Rep #3 Jun/07 SCRD & SRD v3 Jul/07 Laser Fac FRD v1 Sci Ops FRD v1 System Eng (WBS3.1) Perf budgets Trade studies Define candidate subsystems Perf budget summary v1 Eval candidate subsystems Org candidate subsystems Define candidate architectures Eval candidate architectures Aug/07 Prog Rep #4 AO Sys FRD v1 KSM Select candidate architectures Technical risk analysis v1 Sep/07 Perf budget summary v2 Oct/07 Prog Rep #5 Nov/07 Dec/07 Prog Rep #6 Jan/08 Feb/08 SDR Mar/08 Apr/08 Proj Rep #7 SDR Report response FRD v2 Design (WBS3.2 to 3.6) System Eng Mgmt Plan (WBS4) Science Ops Laser Facility Science Ops Laser Facility & Science Ops SDM v1 AO System Laser Facility & Science Ops d-IFU report v1 AO System, Laser Facility & Science Ops Imager/Spect v1 AO System Laser Facility & Science Ops AO System Laser Facility Science Ops Science Ops IFU Report v1 SDM v2 IFU Report v2 d-IFU report v2 Imager/Spect v2 SEMP + Cost review SEMP Cost review SEMP SEMP SEMP 15 Budget Budget Item Work-hours Spent Work-hours Remaining Total work hours = Personnel $k Spent Personnel $k Remaining Travel $k Spent Travel $k Remaining Contingency $k Spent Contingency $k Remaining Total $k = SEMP (thru Mar/07) 4850 11875 16725 Replan 4858 11009 15867 268.9 710 12.2 47.8 0 103.9 1142.8 268.9 688.4 12.2 47.8 0 125.5 1142.8 Reduction in replan labor largely due to removing 1230h of students 16 Next Steps • Complete Replan with Team’s input – – – – – Determine how to proceed with System Architecture New & revised WBS dictionary definitions Improved management strategies More focused team Redo team meeting goals • Complete the following items in May: – – – – – SCRD & SRD v2 FRD v0 & Science Instruments FRD v1 Performance budgets summary Trade Studies Define Candidate Subsystems + Remember to do work scope planning sheets for new tasks 17