NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006 Welcome - Participants • Telecon Attendees: – NGAO Executive Committee: Rich Dekany, Don Gavel, Claire Max, Peter Wizinowich – Sean Adkins, Brian Bauman, Antonin Bouchez, Ralf Flicker, Erik Johansson, Mike Liu, Franck Marchis, David Le Mignant, Anna Moore(?), Chris Neyman, Viswa Velur 2 Goals of Today’s Meeting • Review Progress (management, science, performance budget & instrument updates) • Review trade study reports 3 Meeting Agenda (PST times) http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061213_Remote_NGAO_Meeting_3 09:50 10:00 10:25 10:45 11:10 11:40 12:00 12:20 12:40 13:00 13:20 14:30 Welcome (& connections) Management Report (Wizinowich) Science Team Report (Max) Systems Engineering Report (Dekany) Trade Study Report: MOAO vs MCAO (Gavel) TS Report: Rayleigh Rejection Strategies (Velur) TS Report: Stand-alone vs DM on T/T (Bauman) Break Instrument Trade Studies Update (Adkins) Upcoming tasks & milestones (Wizinowich) Discussion: Issues pertaining to ongoing & upcoming work Adjourn 4 NGAO System Design Phase Management Report NGAO Meeting #3 Peter Wizinowich December 13, 2006 Presentation Sequence • System Design (SD) Phase SEMP Approval Status • SD Phase Tracking • Meeting Tracking – Meeting action items status – EC meeting minutes • Work scope planning sheets status • Posted documents 6 System Design Phase Approval Status • SEMP submitted to the Observatory Directors on 9/29/06 for approval • Official response not yet received (has been requested) – Major issue is how many $ can be made available in FY07 • Direction from WMKO management to proceed while decision is being made – Statements of work complete for COO & UCO & purchase requisitions about to be issued with limited initial funding 7 System Design Phase Tracking • Tracked (Excel) version of the plan posted at http://www.oir.caltech.edu/twiki_oir/pub/Keck/NGAO/SystemDesignPhas ePlanning/NGAO_SD_schedule_v20_tracked.xls • Excel version highlights what’s complete, what’s late, what’s due within next month & status of work scope planning sheets. 8 Meeting Tracking • The tracked version of the action items from meeting 2 are posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061114_CIT_NGAO_Meeting_2 • The minutes & action items from the EC meetings are posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/SystemDesignPhasePlanning 9 Work Scope Planning & Approval • Simplified template posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/NGAOTemplates – To be prepared by WBS element lead & approved prior to performing significant work on a WBS element – Approvals & document control by WBSx.x lead & Wizinowich – We will endeavor to provide approvals within 5 working days of submittal • List of all WBS elements requiring a scope planning sheet can be found at: http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/WorkProducts – Table also provides a location for posting the planning sheets & deliverables – Draft planning sheets posted for many items (includes WBS number, name, dictionary definition & effort estimate from SEMP) • Planning sheet status – Posted for WBS 2.2, 3.1.1.1.1 & 3.1.1.5 – Approved for WBS 3.1.2.1.1, 3.1.2.2.13 & 3.1.2.3.3. • REMINDER to fill out these planning sheets! 10 Posted Documents • • • • • • KAON 415 TMT site monitoring data (restricted access) KAON 416 Atmospheric sodium density from Keck LGS photometry KAON 417 Sodium abundance data from MAUI Mesosphere KAON 427 Variable vs fixed LGS asterism KAON 429 LGS asterism geometry & size MOAO vs MCAO trade study report 11 NGAO System Design Phase Upcoming Tasks & Milestones NGAO Meeting #3 Peter Wizinowich December 13, 2006 Upcoming Meetings & Milestones • Meeting #4 is Jan. 22 at Keck HQ – http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/070122_NGAO_Meeting_4 - Will need % complete for WBS elements prior to meeting (also to be used for SSC report) • SSC meeting Jan. 24 at Keck HQ – 1st project report to SSC & Observatory management – Will need a good estimate of project completion versus costs to date • Milestones: – SEMP approval was due 10/9 (verbal ok only) – SD phase contracts in place was due 10/27 – Science requirements summary v1.0 was due 10/27 – System requirements document v1.0 was due 12/8 We need to show all of these milestones as complete at SSC meeting! 13 NGAO SD Phase Milestones MILESTONE DATE DESCRIPTION SD SEMP Approved 10/9/06 Approval of this plan by the Directors. Initial SEMP version released to Directors for comment on 9/12 & final version on 9/29/06. SD phase contracts in place 10/27/06 Contracts issued to Caltech & UCSC for the system design phase. Science Requirements Summary v1.0 Release 10/27/06 Initial Release of the Science Requirements as input to trade studies and performance budgeting System Requirements Document (SRD) v1.0 Release 12/8/06 Initial release of System Requirements with emphasis on the science requirements Performance Budgets Summary v1.0 Release 2/27/07 First round of all performance budgets complete & documented SRD v2.0 Release 3/22/07 Second release of System Requirements Doc Trade Studies Complete 5/25/07 All trade studies complete & documented (as a series of Keck Adaptive Optics Notes) SRD v3.0 Release 7/12/07 Third release of System Requirements System Design Manual (SDM) v1.0 Release 8/31/07 First release of System Design Manual Technical Risk Analysis v1.0 Release 11/13/07 First round of project risk analysis complete & documented Cost Review Complete 11/30/07 Project cost estimates complete, documented & internally reviewed SDM v2.0 Release 1/8/07 Second release of System Design Manual System Design Review Package Distributed 3/4/08 SDR documents sent to reviewers System Design Review 3/31/08 SDR meeting SDR Report & Project Planning Presentation at SSC meeting 4/14/08 Final SD phase report including results of SDR & project plans 14 Team Meeting Calendar Date # Venue 14-Sep-06 1 UCI 14-Nov-06 2 Major Meeting Goal Kickoff Sci. Case I Science/Management Milestone NGAO SD Plan CIT Performance Drivers Systems Engineering Milestone 3 Video Various TS's 22-Jan-07 4 Keck Performance Budgets Continuous Sci. Field Photometric Budget 18-Apr-07 6 UCSC Various TS's 30-May-07 7 9-Jul-07 8 UCSC 5-day Retreat 22-Aug-07 9 Video Cost Review I 11-Sep-07 10 CIT Infrastructure I 5-Nov-07 11 Video Software Review II 12-Dec-07 Video Software Review I 12 Keck 3-day Meeting Cost Review II 9-Jan-08 31-Mar-08 13 Video SDR Preparation Prelim. Design Prop. 14 Keck SDR Laser/DM Milestone Var/Fixed LGS Ast LGS Ast Geom & Sz Sci. Instr Reuse Instrument Balance Tel Wavefr Errors LOWFS Num & Type HOWFS Num & Type Astrometric Budget High-contrast Budget Polarimetric Budget Throughput Budget K- & L-band Science SRD II GLAO for non-AO Subsys Funct Req I AM2 Optical Relay d-IFU Opt Sampling Risk Analysis I Field Rotat. Strategy Encl/Relay Temp. Operations Tools I Laser Enclosure Sci Path Opt Des I Mech Structure I SRD III Cost Estimate I Instrument/Observatory Milestone Interfer. Requirements Instr. Study Strategy Obs. Effic. Budget Rayleigh Rejection Site Monitoring Update Tip/Tilt Stage v. DM MCAO/MOAO Operations Arch. I Video SRD II Various TS's WFS/WFP Milestone Model/Tool Validation 13-Dec-06 5 Electronics/Software Milestone Identify Perf. Drivers SRD I SRD I 7-Mar-07 Optics/Mechanics Milestone Subsystem Test Plans SDM I Science Verification NGAO vs Upgrades Interfer. Support Focus Compens. DM Stroke Req Dichroics Laser Pulse Format Software Architecture Slow WFS Centroid Anisoplan Free/Fiber BTO DM RfI Obs. Interfaces I Instrument Interfaces Non-real-time Softwr I HOWFS I LOWFS II Laser RfI Calibr. Stimulus I Electronics I Real-time Control I LGS Delivery I Obs. Interfaces II Sci Path Opt Des II Mech Structure II Operations Tools II SDM II Non-real-time Softwr II Risk Analysis II Cost Estimate II Integr. & Test Plan I Subsys Funct Req I Electronics II HO WFS II LO WFS II SDR Prep SDR Prep SRD IV SDR Prep SDR Prep SDR Prep Instrument #1 I SDR Prep SDR Prep SDR 15