Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee Keck NGAO Welcome - Participants In-Person Participants – NGAO Executive Committee: Rich Dekany, Don Gavel, Claire Max, Peter Wizinowich – Sean Adkins, Antonin Bouchez, Ian Cameron, Mike Ireland, Anna Moore, Chris Neyman, Viswa Velur Telecon Attendees: – Brian Bauman, Ralf Flicker, Erik Johansson, Franck Marchis, David Le Mignant, Mike Liu 11/14/06 NGAO Meeting #2 2 Keck NGAO Goals of Today’s Meeting Introduce team structure & responsibilities Review System Requirements document Review key drivers for NGAO performance budgets Review Keck Interferometer requirements Review instrumentation study strategy 11/14/06 NGAO Meeting #2 3 Keck NGAO Meeting Agenda 08:30 09:00 09:30 10:30 10:45 12:15 13:00 13:30 14:00 14:30 15:45 16:00 16:30 17:30 11/14/06 Welcome & Introductions Management Report (Wizinowich) Science Requirements Document (Max) Break Key Performance Drivers (Dekany) Lunch LGS Asterism Geometry & Size (Flicker) Fixed vs Variable LGS Asterism (Velur) Keck Interferometry Requirements (Neyman) NGAO Instrument Study Strategy (Adkins, Moore) Break Discussion: Upcoming tasks & milestones (Wizinowich) General Discussion Adjourn NGAO Meeting #2 4 Keck Next Generation AO NGAO System Design Phase Management Report P. Wizinowich for NGAO Executive Committee Keck NGAO Presentation Sequence System Design (SD) Phase Systems Engineering Management Plan (SEMP) + Approval Status + Budget Management Tools – – – – – 11/14/06 WBS & tracking Milestones Work scope planning & approval Document management Science Requirements & Performance Budget Process NGAO Meeting #2 6 Keck NGAO Systems Engineering Management Plan Document describing how the Executive Committee (EC) plans to manage the SD phase – http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NG AO/SystemDesignPhasePlanning 11/14/06 NGAO Meeting #2 7 Keck NGAO System Design Phase Approval Status SEMP submitted to the Observatory Directors on 9/29/06 for approval Official response not yet received (has been requested) – Major issue is how many $ can be made available in FY07 Direction from WMKO management to proceed while decision is being made – Contracts (effective 10/1/06) to COO & UCSC need to be worked out 11/14/06 NGAO Meeting #2 8 Keck NGAO NGAO SD Phase: Budget Cost ($k) WBS Name FY07 FY08 Total 1 SD Phase Management 74.4 49.2 123.6 2 System Requirements 118.7 3.2 121.9 3 System Design 559.9 89.8 649.7 4 Systems Engineering Management Plan 4.9 78.8 83.7 Travel/Procure 40.0 20.0 60.0 Contingency (10%) 10.0 93.9 103.9 807.9 334.9 1142.8 Total ($k) = Work (hours) Institute FY07 FY08 Total COO 2836 702 3589 UCSC 2991 845 3926 WMKO 5355 1852 7360 Students 1850 0 1850 Total = 13032 3399 16725 11/14/06 $163 increase in cost of labor. Total work same as in proposal. NGAO Meeting #2 9 Keck NGAO SD Phase - Work Breakdown Structure Each major WBS produces one of the 4 major deliverables of the SD Phase: 1 System Design Phase Management System Design Report 2 System Requirements System Requirements Document 3 System Design Approach System Design Manual 4 Systems Engineering Management Plan Systems Engineering Management Plan WBS dictionary defines each element in WBS 11/14/06 NGAO Meeting #2 10 Keck NGAO WBS 1 SD Phase Management 1.1 Planning & Contracting 1.2 Meetings 1.3 Tracking & Reporting 1.4 Proposals & Fundraising 1.5 System Design Report & Review 11/14/06 NGAO Meeting #2 11 Keck NGAO WBS 2 System Requirements 2.1 Science Requirements 2.2 Observatory Requirements 2.3 System Requirements Document 11/14/06 NGAO Meeting #2 12 Keck NGAO WBS 3 System Design Approach 3.1 Systems Engineering 3.2 AO System 3.3 Laser Facility 3.4 Operations Tools 3.5 Science Instruments 3.6 System Design Manual 11/14/06 NGAO Meeting #2 13 Keck NGAO WBS 4 System Engineering Management Plan 4.1 Project Plan 4.2 Risk Assessment & Management Plan 4.3 Preliminary Design Phase Plan 4.4 Integration & Test Plans 4.5 Configuration Management Plan 4.6 Project Management Plan 4.7 Systems Engineering Management Plan 11/14/06 NGAO Meeting #2 14 Keck NGAO System Design Phase Tracking Tracked version of the plan posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Kec k/NGAO/SystemDesignPhasePlanning 11/14/06 NGAO Meeting #2 15 Keck NGAO NGAO SD Phase Milestones 11/14/06 MILESTONE DATE DESCRIPTION SD SEMP Approved 10/9/06 Approval of this plan by the Directors. Initial SEMP version released to Directors for comment on 9/12 & final version on 9/29/06. SD phase contracts in place 10/27/06 Contracts issued to Caltech & UCSC for the system design phase. Science Requirements Summary v1.0 Release 10/27/06 Initial Release of the Science Requirements as input to trade studies and performance budgeting System Requirements Document (SRD) v1.0 Release 12/8/06 Initial release of System Requirements with emphasis on the science requirements Performance Budgets Summary v1.0 Release 2/27/07 First round of all performance budgets complete & documented SRD v2.0 Release 3/22/07 Second release of System Requirements Doc Trade Studies Complete 5/25/07 All trade studies complete & documented (as a series of Keck Adaptive Optics Notes) SRD v3.0 Release 7/12/07 Third release of System Requirements System Design Manual (SDM) v1.0 Release 8/31/07 First release of System Design Manual Technical Risk Analysis v1.0 Release 11/13/07 First round of project risk analysis complete & documented Cost Review Complete 11/30/07 Project cost estimates complete, documented & internally reviewed SDM v2.0 Release 1/8/07 Second release of System Design Manual System Design Review Package Distributed 3/4/08 SDR documents sent to reviewers System Design Review 3/31/08 SDR meeting SDR Report NGAO & Project Planning Meeting #2 Presentation at SSC meeting 4/14/08 Final SD phase report including results of SDR 16 & project plans Keck NGAO Team Meeting Calendar Date # Venue 14-Sep-06 1 UCI 14-Nov-06 2 Major Meeting Goal Kickoff Sci. Case I Science/Management Milestone NGAO SD Plan CIT Performance Drivers Systems Engineering Milestone 3 Video Various TS's 22-Jan-07 4 Keck Performance Budgets Continuous Sci. Field Photometric Budget 18-Apr-07 6 UCSC Various TS's 30-May-07 7 9-Jul-07 8 UCSC 5-day Retreat 22-Aug-07 9 Video Cost Review I 11-Sep-07 10 CIT Infrastructure I 5-Nov-07 11 Video Software Review II 12-Dec-07 Video Software Review I 12 Keck 3-day Meeting Cost Review II 9-Jan-08 31-Mar-08 13 Video SDR Preparation Prelim. Design Prop. Var/Fixed LGS Ast LGS Ast Geom & Sz Tel Wavefr Errors Interfer. Requirements Instr. Study Strategy LOWFS Num & Type HOWFS Num & Type Astrometric Budget High-contrast Budget Polarimetric Budget Throughput Budget K- & L-band Science SRD II GLAO for non-AO Subsys Funct Req I AM2 Optical Relay d-IFU Opt Sampling Risk Analysis I Field Rotat. Strategy Encl/Relay Temp. Operations Tools I Laser Enclosure Sci Path Opt Des I Mech Structure I SRD III Cost Estimate I Instrument/Observatory Milestone Sci. Instr Reuse Instrument Balance Subsystem Test Plans SDM I Science Verification NGAO vs Upgrades Interfer. Support Focus Compens. DM Stroke Req Dichroics Laser Pulse Format Software Architecture Slow WFS Centroid Anisoplan Free/Fiber BTO DM RfI Obs. Interfaces I Instrument Interfaces Non-real-time Softwr I HOWFS I LOWFS II Laser RfI Calibr. Stimulus I Electronics I Real-time Control I LGS Delivery I Obs. Interfaces II Sci Path Opt Des II Mech Structure II Operations Tools II SDM II Non-real-time Softwr II Risk Analysis II Cost Estimate II Integr. & Test Plan I Subsys Funct Req I Electronics II HO WFS II LO WFS II SDR Prep SDR Prep SRD IV SDR Prep SDR Prep SDR Prep 14 Keck SDR 11/14/06 Laser/DM Milestone Obs. Effic. Budget Rayleigh Rejection Site Monitoring Update Tip/Tilt Stage v. DM MCAO/MOAO Operations Arch. I Video SRD II Various TS's WFS/WFP Milestone Model/Tool Validation 13-Dec-06 5 Electronics/Software Milestone Identify Perf. Drivers SRD I SRD I 7-Mar-07 Optics/Mechanics Milestone Instrument #1 I SDR Prep SDR Prep SDR NGAO Meeting #2 17 Keck NGAO Work Scope Planning & Approval Template posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Kec k/NGAO/WebHome under “Systems Engineering” To be prepared by WBS element lead & approved prior to performing significant work on a WBS element – In general these should be submitted at least 1 week prior to the MS Project start date Approvals & document control by Dekany & Wizinowich – We will endeavor to provide approvals within 5 working days of submittal 11/14/06 NGAO Meeting #2 18 Keck NGAO Document Control All materials to be posted on Twiki site All significant items should be made Keck Adaptive Optics Notes & will also be archived on Keck’s docushare site (Wizinowich to provide KAON numbers) – Simple documents can use “Work Scope” template with “Keck Adaptive Optics Note XXX” at top of title block – SD phase deliverable documents should use SEMP document as a template 11/14/06 NGAO Meeting #2 19 Keck NGAO NGAO SD Phase: Science Requirements & Performance Budget Process 11/14/06 NGAO Meeting #2 20 Keck Next Generation AO NGAO System Design Phase Upcoming Tasks & Milestones P. Wizinowich for NGAO Executive Committee Keck NGAO Upcoming Tasks Work Scope planning sheets – These should be submitted for all WBS elements that need to start in CY06 by 12/8 – These include WBS elements under: 2.1 Science cases 2.2 Observatory requirements 2.3 System requirements 3.1.1 Performance budgets 3.1.2 Trade Studies 3.5 Science Instruments Work on the scheduled WBS elements for CY06 11/14/06 NGAO Meeting #2 22 Keck NGAO Upcoming Meetings & Milestones Meeting #3 is a Dec. 13 telecon – http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NG AO/061213_Remote_NGAO_Meeting_3 - Will need % complete for WBS elements prior to meeting Milestones: – SD phase contracts in place was due 10/27 – Science requirements summary v1.0 was due 10/27 – System Requirements document v1.0 due 12/8 11/14/06 NGAO Meeting #2 23