Value Engineering Process Cover Sheet and Instructions

advertisement
Value Engineering Process
APPROVED DOCUMENT – This document is approved by the
Office of the President and Office of the General Counsel for
use by the Facility and is available on computer diskette.
Cover Sheet and Instructions
PURPOSE OF DOCUMENT:
Describe the value engineering process to which the project is subject.
CROSS-REFERENCE TO
FACILITIES MANUAL:
FM3[I]:1,FM3[II]
CONTENTS:
Value Engineering Process
FOR USE WITH:
COMPLETED BY:
Long Form
(LF)
Filling in
√
Brief Form
(BF)
Adding Text
ITS USE IS:
Required
√
Optional
(Not applicable to Some Documents)
Mini Form
(BF)
No Data
Required
Completion Instructions:
1.
Insert the completed Value Engineering document submitted as an attachment to the
Executive Design Professional Agreement (EDPA), modify as necessary to reflect current
status of value engineering effort.
Modifications and Additions:
None.
Comments:
None.
March 26, 2009
Revision 1
CM/Contractor:VEP
Value Engineering Process
Cover Sheet and Instructions
1
Download