Value Engineering Process APPROVED DOCUMENT – This document is approved by the Office of the President and Office of the General Counsel for use by the Facility and is available on computer diskette. Cover Sheet and Instructions PURPOSE OF DOCUMENT: Describe the value engineering process to which the project is subject. CROSS-REFERENCE TO FACILITIES MANUAL: FM3[I]:1,FM3[II] CONTENTS: Value Engineering Process FOR USE WITH: COMPLETED BY: Long Form (LF) Filling in √ Brief Form (BF) Adding Text ITS USE IS: Required √ Optional (Not applicable to Some Documents) Mini Form (BF) No Data Required Completion Instructions: 1. Insert the completed Value Engineering document submitted as an attachment to the Executive Design Professional Agreement (EDPA), modify as necessary to reflect current status of value engineering effort. Modifications and Additions: None. Comments: None. March 26, 2009 Revision 1 CM/Contractor:VEP Value Engineering Process Cover Sheet and Instructions 1