Project Concept Report Template For Project Number : [Pick the date] Department of Transportation Production Support Office Table of Contents Introduction ..................................................................................................................................... 4 Project Location .............................................................................................................................. 4 Project Origin/Need ........................................................................................................................ 4 Project Origin .............................................................................................................................. 4 Project Need ................................................................................................................................ 4 Project Description/ Intent/Concept ................................................................................................ 4 Components of the project .......................................................................................................... 5 Project Exclusions....................................................................................................................... 5 Adjacent projects or related projects........................................................................................... 5 Project Stakeholders, Issues and Commitments ............................................................................. 5 Stakeholders – ............................................................................................................................. 5 Issues ........................................................................................................................................... 5 Commitments .............................................................................................................................. 5 Project Funding ............................................................................................................................... 5 Existing Conditions......................................................................................................................... 5 Typical Section(s) ....................................................................................................................... 5 Roadway Classification .............................................................................................................. 6 Posted Speed & Design Speed .................................................................................................... 6 Pavement Conditions .................................................................................................................. 6 Design Deficiencies .................................................................................................................... 6 Drainage ...................................................................................................................................... 6 Structures/Walls .......................................................................................................................... 6 Utilities/Railroads ....................................................................................................................... 7 Signing/Lighting/Pavement Markings/Signals ........................................................................... 7 Safety Issues................................................................................................................................ 7 Traffic Data ................................................................................................................................. 7 Other Field Observation/Input .................................................................................................... 7 Field Observations .................................................................................................................. 7 Other Input .............................................................................................................................. 8 Proposed Project Features - Preliminary Scope .............................................................................. 8 Recommendations ....................................................................................................................... 8 Typical Section ........................................................................................................................... 8 Project Concept Report Template 7/12/2016 Page 2 of 12 Pavement Design ........................................................................................................................ 8 Design Criteria ............................................................................................................................ 8 Variation or Exceptions .............................................................................................................. 8 Exclusions ................................................................................................................................... 8 Drainage ...................................................................................................................................... 8 Structures .................................................................................................................................... 9 Utilities/Railroads ....................................................................................................................... 9 Signing/Lighting/Pavement Marking/Signals ............................................................................. 9 Environmental ............................................................................................................................. 9 Right of Way ............................................................................................................................... 9 Community Awareness Plan/Public Involvement ...................................................................... 9 Context Sensitive Solutions (CSS) or Transportation Design for Livable Communities (TDLC) ..................................................................................................................................................... 9 Modal (Bike/Ped./Transit) Requirements ............................................................................... 9 Traffic Data/Study................................................................................................................... 9 Traffic Control Plan/Maintenance of Traffic (TCP/MOT) ................................................... 10 Commitments and Proposed JPA.......................................................................................... 10 Coordination with Other Projects ........................................................................................ 10 Project Cost ............................................................................................................................... 10 Appendices .................................................................................................................................... 11 Straight Line Diagram............................................................................................................... 11 Old plans and R/W maps .......................................................................................................... 11 Location Map ............................................................................................................................ 11 Aerial Photos ............................................................................................................................. 11 Field Review Minutes ............................................................................................................... 11 Typical Section ......................................................................................................................... 11 Existing and Proposed Intersection Plans ................................................................................. 11 LRE ........................................................................................................................................... 11 Traffic Study ............................................................................................................................. 11 Crash History ............................................................................................................................ 11 ADA Checklist .......................................................................................................................... 11 Utility Owners Matrix ............................................................................................................... 11 Stakeholders and Commitments ............................................................................................... 11 Correspondence......................................................................................................................... 11 List of FDOT and Consultant personnel involved in preparing the Project Concept Report ... 12 Project Concept Report Template 7/12/2016 Page 3 of 12 Project Concept Report Template Introduction Projects on which concept reports are prepared usually originate from one of the following three offices’, Traffic Operations, Safety or from the Pavement Condition Survey that is developed by the District Material Office. However, the project may be initiated by any office or organization. The office that initiates the project is referred to as the Originating Office. The Scope Input Offices (SIO) within the FDOT Districts may include the following offices: Planning, Design (Roadway, Structures, Pavement, Lighting, Signals, Signing & Pavement Markings, Utilities and Drainage), Permits, Traffic Operations, Safety, Maintenance, Survey, Geotechnical, Right of Way and Construction. These and other sources of information for the sections below will be shown in italics under each heading. Project Location Originating Office, Straight Line Diagrams, Work Program Where is the project located? State Road Number and/or Local Road Name, Section Number, County, Begin & End Milepost Number, City Project Origin/Need Originating Office, Maintenance, field reviews Project Origin What or who is driving the project? Pavement Condition Survey, Traffic Operations, Safety Office, Public Input, MPO, etc. Project Need What problems need addressing? Pavement failures, capacity, adding or increasing turn lanes, signalization, crashes or other safety issues such as access, sub-standard guardrail or bridge rails, etc Project Description/ Intent/Concept Originating Office, SIO, Work Program Office, field reviews – What is being proposed to correct the problems? Recommendations for the project – Describe what is to be done. Resurfacing, widening, adding or extend turn lanes, shoulders, traffic signals, sidewalks, extend culverts, guardrail upgrade, realign intersection, modify turning radius, lighting, etc. Project Concept Report Template 7/12/2016 Page 4 of 12 Components of the project – Show work types that are anticipated on the project Roadway, Structures, Right of Way, Drainage, Utilities, Signals, Lighting, Signing, Pavement Markings, Survey, Geotechnical, Public Information Meetings, etc. Project Exclusions – List unfunded features or features being included on future projects Lane or shoulder width widening, intersection improvements, bridge repair/replacement, etc Adjacent projects or related projects - Include possible conflicts and coordination with adjacent projects or future projects. Maintenance of traffic coordination, pavement transitions, traffic signal interconnections, etc. Project Stakeholders, Issues and Commitments Private and Public Input/meetings, research and field reviews Stakeholders – Identify all individuals and groups with an interest in the project Local government, utility companies, adjacent property owners, road users, special interest groups, environmental agencies, bike/ped/transit, etc. Issues Identify potential issues such as contamination, flood plain, T & E species, Right of Way, community, access, etc. Commitments MPO’s, Local government, property/business owners, environmental agencies Project Funding Work Program Office Proposed phases with amounts, fiscal years, funding category, etc Known or possible JPAs. Existing Conditions Typical Section(s) Old plans, Straight Line Diagrams, field reviews, SIO, Planning Office, Rail Office Provide description of existing typical section features. o o o Number of lanes/width Shoulders/width Parking/width Project Concept Report Template 7/12/2016 Page 5 of 12 o o o o o o o o o o o Turn Lanes/Ramps HOV Lanes Median width/barrier Curb & Gutter/type (Has gutter been paved?) Sidewalk/width Bicycle lanes/width Right of Way/width Drainage System (Open/Enclosed) Rumble strips/type Traffic Monitoring sites Approved Design Variations or Exceptions for the existing features Roadway Classification Planning and Work Program Office Describe existing roadway classification and note is FIHS or SIS, o o o o Interstate, Expressway, Freeway Major Arterial Minor Arterial Local Road Posted Speed & Design Speed Field Review and old plans or Straight Line Diagrams Pavement Conditions Materials Office, Maintenance, Pavement Design, field reviews o o o Base and pavement type and thickness Pavement condition rating Pavement condition survey summary Design Deficiencies SIO and field reviews o o o Summary of existing substandard roadway features (horizontal and vertical alignment, superelevation and cross slope, clear zones, guardrail, pipe end wall treatment, etc) List known exceptions and variations Summary of ADA Survey (Include forms & photos in appendix) Drainage Old plans, Maintenance, Drainage, Safety and field reviews o o o o Describe existing stormwater system Existing ponds and outfalls Describe any known deficiencies (from field reviews or Safety or Maintenance personnel) Permit issues or concerns Structures/Walls Old plans and field reviews o Existing bridges, bridge culverts, retaining walls Project Concept Report Template 7/12/2016 Page 6 of 12 o o o Noise walls Lighting, sign and signal foundations Handrails and Guardrails Utilities/Railroads Utility Office, Utility Owners, Rail Office, old plans and field reviews o o o o Utility – location/size, owners List any existing conditions that would require a utility exception Railroad – location, number of tracks, owner, existing gates, signs or signals for both crossing and parallel tracks Control zone violations Signing/Lighting/Pavement Markings/Signals Traffic Plans, Traffic Operations and field reviews o o o o o List and describe location of all roadway lighting, traffic signals and loops List and describe location of all traffic monitoring sites, weight in motion or other IT installations. List and describe all major sign structures Identify pavement markings, raised pavement markers, no passing zones, school zones, etc Signal Interconnects or other ITS communication lines Safety Issues Safety Office and field reviews o o o o Summary of crash history including identification of crash locations, injury/fatality numbers and contributing cause(s) Access Management Classification Driveways and Median openings Include crash data/history in Appendices Traffic Data Planning o o Existing traffic data Turning movements Other Field Observation/Input In addition to field observations seek input from District Bicycle/Pedestrian Coordinator, Maintenance, Local officials and law enforcement, Permit agencies and District Permit Office, District Emergency Operations Center, District Access Management authority Field Observations (Other than listed above.) o Bicycle, pedestrian and ADA features o Schools and school zones and hospitals o Transit stops o Intersection alignment and side road impacts o Driveways and median opening o Sight distances at intersections and driveways o Note any design, drainage or safety issues or deficiencies Project Concept Report Template 7/12/2016 Page 7 of 12 o o o o o Archaeological sites, hazardous material sites, etc Wetlands or other permit issues Hurricane Evacuation Route? Special events or seasonal traffic that would impact construction Include photos Other Input o General Public, Adjacent Property Owner, Permitting Agencies, Local Government, MPO Proposed Project Features - Preliminary Scope The project features that are to be included in the proposed project are usually determined by a committee of FDOT personnel once all the needs have been determined, taking into account the cost and benefits of all proposed project needs and funding availability. The latest FDOT manuals, handbooks, standards and policy are used to determine the criteria to which all the features are design and built. Recommendations Include all proposed design and construction activities. It is also important to document decisions made on features that are not being included in the project. Typical Section Describe proposed typical section and/or describe the consultant’s role in establishing the typical section package. Include proposed typical section in Appendices. Pavement Design Include preliminary pavement design and/or describe the consultant’s role in establishing the pavement design. Design Criteria List or reference appropriate criteria. Variation or Exceptions List known or possible sub-standard features that are unfunded or cannot be corrected in the design and construction of this project. Also list any previously approved design variations or exceptions. Exclusions Note project features that are not to be included in the design or construction of the project. Drainage Describe all drainage design and construction anticipated for the project. This should include the design and construction of new drainage features, modification to existing structures and maintaining drainage during construction. Project Concept Report Template 7/12/2016 Page 8 of 12 Structures Describe all structure design and construction activities anticipated for the project. This should include approach slabs, bridges, bridge culverts, retaining & noise walls, handrails, foundations, mast arms, etc. Utilities/Railroads Identify utilities and railroads that may be impacted by construction. Determine Department and consultant’s responsibilities with preparing utility plans, adjustments, schedules and for clearing utilities. Identify impacted railroads requirements and design criteria. Determine if offsite detour is required and/or flagmen. Determine if railroad or FDOT contractor is to perform the work. Signing/Lighting/Pavement Marking/Signals Include all proposed design and construction activities for Signing/Lighting/Pavement Marking/Signals. Project specific instructions should be provided for the final application of thermo-plastic pavement markings. Environmental List any known or potential permit involvement. Describe consultant and Department’s responsibilities with regard to acquiring permits. Right of Way If additional right of way is required, describe anticipated right of way needs. Community Awareness Plan/Public Involvement Include project’s CAP level and determine Department and Consultant’s public involvement responsibilities. Context Sensitive Solutions (CSS) or Transportation Design for Livable Communities (TDLC) Design decisions should be sensitive to impacts on both the environment and communities. CSS or TDLC must be considered in the process of planning and developing all transportation facility improvement projects Modal (Bike/Ped./Transit) Requirements Provisions for the design and construction of these facilities should be included along with any special funding requirements. Traffic Data/Study Traffic projections and traffic study recommendations should be included. Traffic study and any intersection schematics should be included in the Appendices. Project Concept Report Template 7/12/2016 Page 9 of 12 Traffic Control Plan/Maintenance of Traffic (TCP/MOT) TCP requirements for design and construction should be established including governing criteria/standards, Bike/Ped/Transit needs, Lane Closure Analysis and incentive to expedite construction. Construction restrictions due to hurricanes, special events, night & weekends and tourist season, etc., should be noted. Commitments and Proposed JPA Include any known or anticipated JPA’s and any commitments that have been made to the project stakeholders. Coordination with Other Projects Adjacent and related projects, both existing and proposed, should be noted and potential conflicts identified. Project Cost The project’s Long Range Estimate (LRE) and any potential cost saving project features should be discussed. Safety projects should include a Benefit Cost Ratio Analysis. Include LRE in Appendices. Project Concept Report Template 7/12/2016 Page 10 of 12 Appendices Straight Line Diagram Old plans and R/W maps Location Map Aerial Photos Field Review Minutes Attendees, Observations, Recommendations and Photos Typical Section Existing and Proposed Intersection Plans LRE Traffic Study Crash History ADA Checklist Utility Owners Matrix Stakeholders and Commitments Correspondence Project Concept Report Template 7/12/2016 Page 11 of 12 Benefit Cost Ratio (Safety Projects) List of FDOT and Consultant personnel involved in preparing the Project Concept Report Project Concept Report Template 7/12/2016 Page 12 of 12