First Article Inspection: Product/Process Verification Checklist L Form No. MFC-0295 Rev. 04/29/2005 Work Order Number: ___________ Start Date:___________ Part Number: ______________________ End Date:___________ Auditors: __________________________________________ Questions Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Comments DOCUMENT CONTROL 1. Are sketches, drawings, forms, inspection documents, etc. to the correct revision? 2. Are any uncontrolled/unreleased documents being used to produce or inspect hardware? 3. Are “reference” documents properly identified in work instructions and/or drawing package? STAMP CONTROL 4. Are stamps legible? WORK INSTRUCTIONS 5. Are the correct manufacturing method documents, specifications, Operating Instructions called out in the work instructions? 6. Are set-up or installation instructions controlled and do they capture actual operations? 7. Are work instructions clear, concise and easy to follow? 8. Is wording consistent? 9. Do work instructions capture current process? 10. Are safety instructions clear? 11. Do handling and packaging instructions provide enough detail? 12. Are inspection operations sequenced properly? 13. Is change history available? 14. Are work instruction redlines authorized, stamped and dated properly? A hard copy of this controlled document may not be the current version. The current version is always on the Lockheed Martin Network. Form No. MFC-0295 Rev. 04/29/2005 Page1 of 4 First Article Inspection: Product/Process Verification Checklist 15. Are all tools and equipment listed in work instructions? 16. Do work instructions reference all applicable documents (i.e. mfg. method documents, operating instructions, specs, etc.)? Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A EQUIPMENT/TOOLS/CALIBRATION 17. 18. 19. 20. 21. 22. Are machines and tools calibrations/certifications current? Are equipment/Tools being used in accordance with mfg. operating instructions, manufacturing method documents, etc.? Is GFE labeled, handled, and stored per requirement? Are all tools/Equipment that are in use equipped to prevent damage or contamination? Are “calibration void if broken” seals in tact? Do the torque values/wrenches called out in the work instructions match engineering requirements? IDENTIFICATION/PACKAGING/HANDLING 23. 24. 25. Is the serial number, lot number or any traceability data properly documented? Are parts packaged and identified adequately? Are parts being handled and stored to avoid damage? INSPECTION METHODS 26. 27. 28. Are inspection methods capable and repeatable? Are measuring methods for dimensional requirements acceptable for process, fabrication, assembly and quality? Is final inspection adequately defined? MATERIAL/SHELF LIFE 29. 30. 31. Are material call-outs in each operation are correct? Are materials labeled, handled and stored per requirement? Are shelf life materials, being used in the process, is within usage date? A hard copy of this controlled document may not be the current version. The current version is always on the Lockheed Martin Network. Form No. MFC-0295 Rev. 04/29/2005 Page2 of 4 First Article Inspection: Product/Process Verification Checklist TRAINING/CERTIFICATIONS 32. Are operators and inspectors properly trained? Verify training and certifications are adequate to support required tasks. Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Does the process documentation flow down? (i.e. manufacturing methods, specifications, etc. called out in the work instructions) Yes No N/A Are process control parameters monitored, controlled and recorded? (i.e. oven logs, SPC data, environmental controls, etc.) Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A FOD/HOUSEKEEPING 33. Are operators knowledgeable of the importance of FOD prevention and are proper precautions are in place? OPERATOR RESPONSIBILITY 34. 35. 36. 37. 38. Are operators following work instructions line-for-line without deviation? Are operators performing steps in sequence, not bypassing inspection steps? Is the operator recording data entry steps consistently? (cure time, serial numbers, etc.) Are all prior operations complete? Are all discrepancies/open items closed out appropriately? (i.e.. Shortages, "work to's," Engineering changes) PROCESS CONTROL 39. 40. NC TAPES 41. Are NC tapes released and at proper revision level? SOFTWARE 42. Is support software at proper revision, verified, and controlled? ESD/ENVIRONMENTAL CONTROLS 43. 44. 45. Are ESD controls in place per requirements? (i.e. certified ESD stations, wrist straps, etc.) Are ESD parts identified, packaged, handled and transported correctly? Are temperature, humidity and environmental controls in place and within specification? A hard copy of this controlled document may not be the current version. The current version is always on the Lockheed Martin Network. Form No. MFC-0295 Rev. 04/29/2005 Page3 of 4 First Article Inspection: Product/Process Verification Checklist SAFETY/CHEMICALS/HAZARDOUS WASTE 46. Is Personal Protective Equipment used to perform tasks? Is it being used properly? Notes: Yes No N/A Date: A hard copy of this controlled document may not be the current version. The current version is always on the Lockheed Martin Network. Form No. MFC-0295 Rev. 04/29/2005 Page4 of 4