Reliability Standard Audit Worksheet RSAW_v2.1_EOP-004-AB-1 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-004-AB-1 Disturbance Reporting Alberta Reliability Standard Effective Date: June 17, 2009 Applicability: This reliability standard applies to the entities listed below: ISO TFOs GFOs Registered Entity: Functional Entity: Audit Period: From June 17, 2009 To Last Audit Period: Type of Audit: Audit Authority/Organization: Alberta Electric System Operator Date of Completion: 98880606 Page 1 of 5 05/28/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-004-AB-1 PART ONE – ASSESSMENT SUMMARY Suspected Non-Compliance to the standard? Yes No Assessment Commentary: Summary of Findings by Requirement R3 98880606 Page 2 of 5 05/28/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-004-AB-1 PART TWO – CONTACTS Contact Type Name Telephone Email Sign-off Entity Leader Not applicable Entity SME Not applicable Audit Leader Audit Team Audit Team Standard Owner Audit Manager 98880606 Page 3 of 5 05/28/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-004-AB-1 PART THREE – COMPLIANCE AUDITOR ASSESSMENT / CHECKLIST Requirement 3 Measures 3 Assessment 3 Evidence Description Evidence Assessment Notes Embedded file, Link to the file For AESO use only These measures will be used by the ISO in carrying out its compliance monitoring duties in accordance with ISO rule 103.12. The ISO may consider other data and information, including any provided by a registered market participant. R3 TFOs and GFOs must analyze disturbances on its system or facilities as requested by the ISO in accordance with OPP 1304. MR3 Information provided meets the requirements of the request. AR3 1. Request the market participant to provide the request(s), if any, by the ISO for analysis of disturbances pursuant to this standard during the audit period. 2. Request the market participant to submit a copy of information that was provided to the ISO per each request, if any. Review requests made and determine whether information provided by TFOs and/or GFOs met the requirements in accordance with OPP 1304. NOTE: A confirmation letter from the ISO indicating the information provided meets with the requirements of the request will be acceptable. Findings R3 98880606 Page 4 of 5 05/28/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-004-AB-1 PART FOUR – ISO CMP AUDITOR GUIDES – “DISCLAIMER” ISO CMP Auditor Guides – “Disclaimer” ISO developed the Reliability Standard Audit Worksheet (RSAW) to add clarity and consistency to the audit team’s assessment of compliance with this reliability standard. In adding clarity for the assessment, the RSAW may include additional detail that is consistent with the Alberta Reliability Standard. This additional detail clarifies the methodology that ISO has elected to use to assess requirements and should not be considered additional reliability standard requirements. Alberta Reliability Standards are updated frequently. The ISO RSAWs are written to specific versions of each Alberta Reliability Standard. RSAW users should choose the applicable RSAW version of the Alberta Reliability Standard being assessed. PART FIVE – ADMINISTRATION Revision History This document is an AESO information document and guideline, and not an AESO authoritative document. Revisions to this document may be made from time to time by the AESO Compliance group. Market participants will be notified of revisions through the stakeholder update process. Revision Date 1.0 1.1 2 March 1, 2010 August 24, 2012 October 5, 2012 2.1 May 28, 2013 Comments Initial version of Worksheet Changes made to support the pilot project that the audited entity uses the RSAW for evidence submission Further changes made to support pilot project to use RSAW for evidence submission and to have a single format for published, assessment and evidence submission purposes. Formatting alignment with posted standard and removal of requirements applicable to the ISO. Audit Team - General Notes to File: 98880606 Page 5 of 5 05/28/2013