Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b Emergency Operations Planning Alberta Reliability Standard Effective Date: January 1, 2014 Applicability: This reliability standard applies to: the ISO; and the operator of a transmission facility that is part of the bulk electric system; This reliability standard does not apply to the operator of a transmission facility whose transmission facility is a radial connection from a generating unit or an aggregated generating facility to either the transmission system or to transmission facilities within the city of Medicine Hat. Registered Entity: Functional Entity: Audit Period: From January 1, 2014 To Last Audit Period: Type of Audit: Audit Authority/Organization: Alberta Electric System Operator Date of completion: 98881935 Page 1 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b PART ONE – ASSESSMENT SUMMARY Suspected Non-Compliance to the standard? Yes No Assessment Commentary: Summary of Findings by Requirement R3 R4 R5 R8 R10 98881935 Page 2 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b PART TWO – CONTACTS Contact Type Name Telephone Email Sign-off Entity Leader Not applicable Entity SME Not applicable Audit Leader Audit Team Audit Team Standard Owner Audit Manager 98881935 Page 3 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b PART THREE – COMPLIANCE AUDITOR ASSESSMENT / CHECKLIST Requirement 3 Measures 3 Assessment 3 (for operator of a transmission facility only) R3 Each of the ISO and the operator of a transmission facility must develop, maintain and implement plans to mitigate operating emergencies on the transmission system. MR3 Evidence of developing, maintaining and implementing plans to mitigate operating emergencies on the transmission system as required in requirement R3 exists. Evidence may include dated, current plans to mitigate operating emergencies on the transmission system and communications or training to the operating personnel. AR3 Evidence Description Evidence Assessment Notes Embedded file, Link to the file For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. Plans to mitigate operating emergencies on the transmission system that were in place during the audit period; ii. A list of operating personnel designated to receive communications (that may include briefing, bulletin, email or alike) or training with respect to each plan identified in the above (i); iii. Records of communications or training provided to the operating personnel identified in the above (ii); iv. Contents of communications or training as identified in the above (iii); Part 2: Audit Assessment 1. Check each submitted plan, then verify a. Was each plan in place during the audit period? 98881935 2. Review each submitted plan and its revision history, then verify a. Was each plan maintained (kept updated/current) to reflect each potential change, if any? Potential changes may include changes in communication protocol, controlling actions to resolve operating emergencies, the tasks to be coordinating with appropriate entities, staff level for the emergency or their combination. 3. Review the records of communications or training provided to the operating personnel and check against the submitted list of the operating personnel, then verify: a. Had each operating personnel received communications or training about the Page 4 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b Requirement 3 Measures 3 Assessment 3 (for operator of a transmission facility only) plans? b. Had each operating personnel received communications or training about the plans for each revision made during the audit period? 4. Evidence Description Evidence Assessment Notes Embedded file, Link to the file For AESO use only Review communications or training materials provided to the operating personnel, then verify: a. Was the content of communications or training related to plans to mitigate operating emergencies on the transmission system? Findings R3 98881935 Page 5 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b Requirement 4 Measures 4 Assessment 4 (for operator of a transmission facility only) R4 Each of the ISO and the operator of a transmission facility must develop, maintain and implement plans for load shedding. MR4 Evidence of developing, maintaining and implementing load shedding plans as required in requirement R4 exists. Evidence may include dated, current plans for load shedding and communications or training to the operating personnel. AR4 Evidence Description Evidence Assessment Notes Embedded file, Link to the file For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. Plans for load shedding that were in place during the audit period; ii. A list of operating personnel designated to receive communications (that may include briefing, bulletin, email or alike) or training with respect to each plan identified in the above (i); iii. Records of communications or training providing to the operating personnel identified in the above (ii); iv. Contents of communications or training as identified in the above (iii); Part 2: Audit Assessment 1. Check each submitted plan, then verify a. Was each plan in place during the audit period? 98881935 2. Review each submitted plan and its revision history, then verify a. Was each plan maintained (kept updated/current) to reflect each potential change, if any? Potential changes may include changes in communication protocol, controlling actions to resolve operating emergencies, the tasks to be coordinating with appropriate entities, staff level for the emergency or their combination. 3. Review the records of communications or training provided to the operating personnel and check against the submitted list of the operating personnel, then verify: a. Had each operating personnel received communications or training about the plans? b. Had each operating personnel received communications or training about the Page 6 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b Requirement 4 Measures 4 Assessment 4 (for operator of a transmission facility only) plans for each revision made during the audit period? 4. Evidence Description Evidence Assessment Notes Embedded file, Link to the file For AESO use only Review communications or training materials provided to the operating personnel, then verify: a. Was the content of communications or training related to plans for load shedding? Findings R4 Requirement 5 Measures 5 Assessment 5 (for operator of a transmission facility only) R5 Each of the ISO and the operator of a transmission facility must include, at a minimum, when developing emergency plans as identified in requirements R2, R3 and R4, the following: (a) communication protocols to be used during operating emergencies; (b) a list of controlling actions to resolve the operating emergency within NERC established timelines, including, where appropriate, a controlling action to reduce load; (c) the tasks to be coordinated with and 98881935 MR5 Evidence of including the items in emergency plans as required in requirement R5 exists. Evidence may include emergency plans that contain items listed in requirement R5. AR5 Evidence Description Evidence Assessment Notes Embedded file, Link to the file For AESO use only Part 1: Evidence Submission Please refer to Part 1 (i) of AR3 and AR4. Part 2: Audit Assessment 1. Review the contents of each submitted operating emergencies mitigation plan identified in AR3, then verify: a. Did each operating emergencies mitigation plan include communication protocols to be used during operating emergencies? b. Did each operating emergencies mitigation plan include a list of controlling actions to resolve the operating emergency within NERC established timelines, including, where appropriate, a controlling action to reduce load? c. Did each operating emergencies mitigation plan include the tasks to be coordinated with and among any affected operator of a transmission facility, adjacent interconnected transmission operator and adjacent balancing authority, as appropriate? Page 7 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b Requirement 5 Measures 5 Assessment 5 (for operator of a transmission facility only) among any affected operator of a transmission facility, adjacent interconnected transmission operator and adjacent balancing authority, as appropriate; and (d) a procedure for adjusting staffing levels for the emergency, where appropriate. d. 2. Evidence Description Evidence Assessment Notes Embedded file, Link to the file For AESO use only Did each operating emergencies mitigation plan include a procedure for adjusting staffing levels for the emergency, where appropriate? Review the contents of each submitted plan for load shedding identified in AR4, then verify: a. Did each plan for load shedding include communication protocols to be used during operating emergencies? b. Did each plan for load shedding include a list of controlling actions to resolve the operating emergency within NERC established timelines, including, where appropriate, a controlling action to reduce load? c. Did each plan for load shedding include the tasks to be coordinated with and among any affected operator of a transmission facility, adjacent interconnected transmission operator and adjacent balancing authority, as appropriate? d. Did each plan for load shedding include a procedure for adjusting staffing levels for the emergency, where appropriate? Findings R5 98881935 Page 8 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b Requirement 8 Measures 8 Assessment 8 (for operator of a transmission facility only) R8 Each operator of a transmission facility must review its plans for load shedding once every calendar year and update as required. MR8 Evidence of reviewing and updating plans as required in requirement R8 exists. Evidence may include documentation confirming each plan was reviewed once every calendar year and updated as required. AR8 Evidence Description Evidence Assessment Notes Embedded file, Link to the file For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit assessment: i. Documentation of the annual review identifying the date of the review, the name and title of personnel who conducted the review and the result/conclusion of each review (pursuant to R8) completed during the audit period. Part 2: Audit Assessment 1. Review the submitted verify: a. 2. review documentation, then Was each plan for lead shedding reviewed once every calendar year? Identify the result/conclusion of the each review and check the plans for load shedding submitted in AR4, then verify: a. Was each plan for load shedding updated if it was so required based on the result/conclusion of the annual review? Findings R8 98881935 Page 9 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b Requirement 10 Measures 10 Assessment 10 (for operator of a transmission facility only) R10 Each operator of a transmission facility must provide a copy of its updated plans to mitigate operating emergencies on the transmission system and plans for load shedding to any affected adjacent operator of a transmission facility and the ISO. MR10 Evidence of providing updated plan as required in requirement R10 exists. Evidence may include email or mail to appropriate recipients that identifies contents submitted. AR10 Evidence Description Evidence Assessment Notes Embedded file, Link to the file For AESO use only Part 1: Evidence Submission Pursuant to compliance monitoring audit the audited entity, to whom this requirement applies to, is requested to provide the following documentation for audit: i. Documentation indicating that each updated plan as required in requirement R10 was provided to any affected adjacent operator of a transmission facility and the ISO for each update. Part 2: Audit Assessment 1. Review the submitted documentation with respect to plan to mitigate operating emergencies on the transmission system, then verify : a. b. 2. Was a copy of updated plan provided to any affected operator of a transmission facility for each update? Was a copy of updated plan provided to the ISO for each update? Review the submitted documentation with respect to plan for load shedding system, then verify : a. b. Was a copy of updated plan provided to any affected operator of a transmission facility for each update? Was a copy of updated plan provided to the ISO for each update? Findings R10 98881935 Page 10 of 11 07/06/2013 Reliability Standard Audit Worksheet RSAW_v2.1_EOP-001-AB-2b PART FOUR – ISO CMP AUDITOR GUIDES – “DISCLAIMER” ISO CMP Auditor Guides – “Disclaimer” ISO developed the Reliability Standard Audit Worksheet (RSAW) to add clarity and consistency to the audit team’s assessment of compliance with this reliability standard. In adding clarity for the assessment, the RSAW may include additional detail that is consistent with the Alberta Reliability Standard. This additional detail clarifies the methodology that ISO has elected to use to assess requirements and should not be considered additional reliability standard requirements. Alberta Reliability Standards are updated frequently. The ISO RSAWs are written to specific versions of each Alberta Reliability Standard. RSAW users should choose the applicable RSAW version of the Alberta Reliability Standard being assessed. PART FIVE – ADMINISTRATION Revision History This document is an AESO information document and guideline, and not an AESO authoritative document. Revisions to this document may be made from time to time by the AESO Compliance group. Market participants will be notified of revisions through the stakeholder update process. Revision Date 1.0 2 August 1, 2012 February 27, 2013 2.1 June 7, 2013 Comments New issue Changes made to support pilot project to use RSAW for evidence submission and to have a single format for published, assessment and evidence submission purposes. Removal of requirements applicable to the ISO. Audit Team - General Notes to File: 98881935 Page 11 of 11 07/06/2013