Behind the Fence (BTF) Plan [Insert Market Participant Name] [Insert Project Name] AESO Project Number: [000] Company Name [Insert Market Participant Name] [Insert Studies Consultant (if applicable)] Name Date [Insert AESO Project Coordinator] Document Release R1 [Insert Date] AESO Behind the Fence Plan Signature Behind the Fence Plan Table of Contents 1. Purpose ............................................................................................................... 2 2. Project Description............................................................................................. 3 3. Study Area Description ...................................................................................... 4 4. Roles and Responsibilities RACI ...................................................................... 5 5. Project Considerations ...................................................................................... 9 6. Project Risks ..................................................................................................... 10 7. Project Milestones ............................................................................................ 12 Transmission Project Delivery R[x] 1 Public R2-2014-09-30 Behind the Fence Plan 1. Purpose The BTF Plan is a high-level document, similar to a Project Charter, that provides a quick overview of the Project identified in Section 2 (the “Project”). This includes a description of the Project and study area, definition of roles and responsibilities if needed, Project considerations, general Project risks and high-level Project milestones and dates. The BTF Plan is a static document that summarizes the Project at a high level at the onset. Once executed by all parties, the BTF Plan must not be modified. Any changes to the Project that occur subsequent to execution of the BTF Plan will be tracked through change management procedures. [No changes should be made to this section. All notes and italicized fonts provided throughout this template in [square brackets] must be removed from all drafts of this document. This document should not include discussion of the proposed alternatives for the Project as these will be identified in the BTF Study Scope. The Project Coordinator should draft as much of the BTF Plan as possible in advance of the External Kick-off meeting. The intent of the External Kick-off meeting is to complete the BTF Plan and obtain sign-off if possible. Once the BTF Plan is executed modifications must not be made throughout the life of the Project.] Transmission Project Delivery R[x] 2 Public R2-2014-09-30 Behind the Fence Plan 2. Project Description [This section should be completed by the AESO Project Coordinator. The description must align with the Project Information provided in the System Access Service Request and the Project Description in the BTF Study Scope and include a brief description of the Project, requested in-service date, Market Participant name, AESO Project name and physical land location where the Project will be located.] Transmission Project Delivery R[x] 3 Public R2-2014-09-30 Behind the Fence Plan 3. Study Area Description [This section should be completed by the AESO Project Studies Engineer. A brief description of the system in the area the Project is located in and any known system reinforcement dependencies. If possible, a single line diagram should be provided.] Transmission Project Delivery R[x] 4 Public R2-2014-09-30 Behind the Fence Plan 4. Roles and Responsibilities RACI [This section should be completed by the AESO Project Coordinator with input from Market Participant and Studies Consultant The RACI provided below represents the most common arrangement (shown in italicized text). Changes are permitted depending on the roles and responsibilities established by the Project team for the Project. Remove italics for final draft once roles and responsibilities have been agreed upon.] The RACI chart below outlines the roles and responsibilities established for the Project. Deliverable AESO [Insert Name of Studies Consultant] [Insert Market Participant Name] BTF Plan A, R C C BTF Study Scope A, R R R C R A, R BTF ESR1 Market Participant Contribution Decision, as required PDUP – Stage 1, 2, & 5 2 as required A, R I I R [Insert TFO Name]* I I A * TFOs need to be engaged early in the project to confirm the Project has no reliability impacts or System upgrade requirements 1. Accountability determined in kickoff meeting 2. For data submissions, refer to the Project Data Update Package – Instruction Manual (PDUP-IM) for roles and responsibilities outlined for each stage of the Process: http://www.aeso.ca/22277.html RACI – Responsible, Accountable, Consulted, Informed Responsible = “the doer”. Those who do work to achieve the task. There can be multiple resources responsible. Accountable = “the buck stops here”. The resource ultimately answerable for the correct and thorough completion of the task (also approver). There can only be one “A” specified for each task. Consulted = “in the loop”. Those whose opinions are sought. Those who have special knowledge or expertise needed to make decisions or solve problem. Two-way communication. Transmission Project Delivery R[x] 5 Public R2-2014-09-30 Behind the Fence Plan Informed = “in the picture”. Those who are kept up-to-date on progress and decisions (once made). May be impacted by decision but are not active in final decision. One-way communication. Transmission Project Delivery R[x] 6 Public R2-2014-09-30 Behind the Fence Plan [The following paragraphs must be included if the AESO is not completing the BTF ESR, otherwise delete:] Where the Engineering Study Report is prepared by the Market Participant or Studies Consultant as outlined in the RACI: (a) Base Cases must be downloaded from the AESO’s website and converted into study cases as outlined in the BTF Study Scope; (b) The BTF ESR must be authenticated (signed, stamped and dated) by a professional engineer registered in the Province of Alberta; (c) The BTF ESR must be submitted to the AESO for acceptance. Upon review, the AESO may: (d) (i) accept the BTF ESR; (ii) require revisions to the BTF ESR; or (iii) reject the BTF ESR; following acceptance of the BTF ESR, the AESO will require any revisions of information contained in an updated BTF ESR or in the Functional Specification as it is developed. Transmission Project Delivery R[x] 7 Public R2-2014-09-30 Behind the Fence Plan The table below defines the contacts for each entity with respect to the Project. The identified Project representative for each organization should be included in all communications with respect to the Project unless otherwise indicated. Role AESO [Insert Name of Studies Consultant] [Insert Name of Market Paricipant] [Insert TFOs]* Project Manager/ Coordinator Project Studies Engineer * As required, TFOs will be engaged through the Project if certain reliability requirements or System upgrades are identified Transmission Project Delivery R[x] 8 Public R2-2014-09-30 Behind the Fence Plan 5. Project Considerations [This section should be completed by the AESO – Project Coordinator with input from Market Participant and Studies Consultant. The intent of this section is to document any early known Project considerations regarding Project assumptions, key objectives or delivery approach that have been agreed upon by the Project team. Please refer to the Project Considerations and Risks List for some common examples; you may edit Project considerations and/or include additional Project considerations as required.] Project considerations outlined in this section include early known considerations regarding Project assumptions, key objectives or delivery approach as agreed upon by the Project team. Considerations have been divided into 2 areas: Filing Strategy and Other Considerations, if applicable. 5.2 Other Considerations [If applicable, document any other Project considerations regarding Project assumptions, key objectives or delivery approach. For instance, Interdependencies, In Service Dates. Transmission Project Delivery R[x] 9 Public R2-2014-09-30 Behind the Fence Plan 6. Project Risks [This section should be completed by the AESO Project Coordinator with input from Market Participant, Studies Consultant. The intent of this section is to identify any known risks to the delivery of the Project that have been agreed upon by the Project team, including study risks or risks against some of the Project considerations noted in Section 5. For example, list any known interdependencies on system work or if there is a requirement for winter construction. Please refer to the Project Considerations and Risks List for some common examples; you may edit Project risks and/or include additional Project risks as required. Please note that as the Project progresses the risks identified in this document must be managed by the AESO Project Coordinator and tracked through change management procedures.] Project risks identified in this section include any known risks to the delivery of the Project as agreed upon by the Project team, including study risks or risks against some of the Project Considerations noted in Section 5. The Project risks identified will likely have some impact on the cost, schedule, or scope for the Project should they occur therefore they are being identified for consideration. For identified risks it is necessary to also document the potential mitigation strategy that is being proposed. As the Project progresses the risks identified in this section will be managed by the AESO Project Coordinator and tracked through change management procedures. See Table 6.1 – Project Risks Transmission Project Delivery R[x] 10 Public R2-2014-09-30 Behind the Fence Plan Table 6.1 – PROJECT RISKS Identified Risk Identified By1 Mitigation Strategy Assigned To1 Project Schedule & Scope Project Resourcing Operational Project Complexity Market and/or Vendors?? Indicate entity rather than individual responsible (i.e. AESO, Market Participant or Studies Consultant) Transmission Project Delivery R[x] 11 Public R2-2014-09-30 Behind the Fence Plan 7. Project Milestones [This section should be completed by the AESO Project Coordinator with input from the Market Participant and Studies Consultant. The AESO Project Coordinator must first undertake the scheduling exercise in @task before filling in the milestone dates in the table below. The milestones in the template must be provided as a minimum, additional milestones may be added depending on the complexity of the Project. Project Coordinators should consult with their Program Manager before making any changes/additions to the template. As the Project progresses, updates to the Project schedule will be maintained by the Project Coordinator outside of this document and tracked through change management procedures.] The Project milestones outlined in this section provide a high-level summary for the Project schedule and establish a base line schedule for the Project. As the Project progresses, updates to the Project schedule will be maintained separately by the AESO Project Coordinator, communicated to the Project team and managed through change management procedures. Milestone Owner Target Date Finalize BTF Plan Finalize BTF Study Scope BTF ESR Functional Specification Stage 5 PDUP & Energization Data Gate 5 Complete (In-Service Date) Transmission Project Delivery R[x] 12 Public R2-2014-09-30