July 12, 2016 Introduction In December 2009 the AESO formed a Connection Model Industry Working group to assist the AESO finalize high level data requirements, queue management principles, process timeline targets & reporting requirements, AESO Authoritative & Information Document recommendations, and the transition plan from the existing process to the new model. This initiative is being led by Jana Mosley. Click here to view additional information on the purpose and scope of this initiative. As stated in the paragraph above the Connection Model Industry Working group will assist with Authoritative and Information documents (“the documents”). This specific component is related to the AESO’s Transition of Authoritative Documents (“TOAD”) project. Click here to view additional information on the TOAD project. For this reason TOAD resources will work directly with a smaller workgroup to assist the AESO determine the authoritative components of the process, the required authoritative documents, where the authoritative documents will be represented (ISO rules, tariff or reliability standards) and a transition plan for the authoritative documents. The intent is that this smaller workgroup report results back to the larger Connection Model Industry Working group. This smaller workgroup (referred to as the “TOAD-Connection workgroup”) will be led by Evelyn Kelly, AESO TOAD project manager. Please review the attached Terms of Reference for the TOAD-Connection workgroup to more fully understand its purpose, scope and responsibilities. Stakeholders interested in participating in he TOAD-Connection workgroup should contact Evelyn Kelly at Evelyn.Kelly@aeso.ca or at 403-539-2468 by February 18th, 2010. Sincerely, “original signed by” Doyle Sullivan Director, Regulatory 2500, 330 - 5th Ave SW Calgary, Alberta T2P 0L4 t 403.539.2450 | f 403.539.2949 | www.aeso.ca -2TERMS OF REFERENCE FOR THE TOAD-CONNECTION WORKGROUP Purpose The purpose of TOAD-Connection workgroup (“workgroup”) is to review the connection process and related documents and make recommendations regarding: 1. The authoritative elements of the connection process, incorporating the process changes 2. The domains for representation of the authoritative elements – ISO rules, tariff, reliability standards 3. High level analysis of the documentation: – What are the authoritative documents that are needed to support the process – What are the information components to support the authoritative documents 4. Transition approach – What are the priorities Scope The scope of work for the workgroup includes: Understand the TOAD project objectives Confirm the Terms of Reference Confirm the schedule Review and discuss the authoritative domains in relation to the customer interconnection process Assessment of the connection process and the authoritative elements High level analysis of documents – which documents are authoritative documents and which are information documents Determine a transition approach (what are the priorities) Communicate outcomes to the larger Interconnection workgroup Summarize results of the workgroup and deliver recommendations to the AESO Vice President of Regulatory Out of Scope Redesign of the connection process. The TOAD-Connection workgroup will work with the redesigned process details as provided by Jana Mosley and the Connection Model Industry workgroup. Implementation of the redesigned concepts including any new or changes to processes, procedures, protocols templates and documents. However, there will be a need to align the TOAD Connection workgroup efforts and progress with implementation efforts of the Connection process changes. TOAD project including items such as architecture, objectives and deliverables. -3- Responsibilities Responsibilities of the AESO AESO responsibilities include: Coordinates and facilitates the TOAD-Connection workgroup to its timely completion. Prepares and distributes of meeting notes, as required. Provides facilities and logistical support, as necessary. Maintains alignment with the Connection Model and the overall project delivery process for the AESO. Listens to others’ perspectives in a respectful manner. Prepares a summary of results from the TOAD-Connection workgroup for AESO management’s consideration. Preparing the summary of results in a manner that preserves the ‘without prejudice’ nature of individual comments made in the sessions. Makes the final determination on authoritative components of the Connection process and the related authoritative documents after considering the recommendations provided by the TOAD-Connection workgroup. Responsibilities of the Work Group members Work Group member responsibilities include: Obtains respective organizational support to participate in the TOAD-Connection workgroup. Attends the meetings as set out in the schedule below. Fully prepares designates if a designate is required. Participates in all meetings in a constructive manner; listening to others’ perspectives in a respectful manner. Assists with follow up work between meetings, as required. Vets concepts with personnel within respective organizations, as required. Understands that comments made in the sessions are without prejudice and individual comments will not be documented or will not be brought forward in any other forum inside or outside the AESO office. -4Approach The TOAD-Connection workgroup will meet every two weeks for a half day commencing February 23, 2010 and ending May 18, 2010 as set out in the schedule below. The AESO has provided high level activities for the meetings to provide stakeholders with some indication of how the meetings will progress. February 23 Background and status of the TOAD project Review and confirm the Terms of Reference Review and confirm the schedule Discuss and confirm interface protocols – larger group, TOAD monthly sessions March 8 Review and discuss the authoritative domains in relation to the customer interconnection process March 18 Assessment of the connection process and the authoritative elements April 6 Continue assessment of the process and the authoritative elements Commence high level analysis of documents April 20 Complete high level analysis of documents Commence discussion on the transition approach May 4 Complete work on the transition approach Review summary of results of the workgroup May 18 Final review and closure Communication of Documents and Information Principles for the communication of documents and information are as follows: All TOAD-Connection workgroup communication to the industry will be through the AESO. Any communication by the AESO regarding the TOAD-Connection workgroup outcomes will be posted on the AESO website. The AESO will take reasonable efforts to preserve the ‘without prejudice’ nature of individual comments made in the sessions contemplated as stated in the ‘AESO Responsibility’ section above. Work Group members treat all documentation and information discussed and circulated at the TOAD-Connection workgroup sessions as confidential information. Session notes will capture action items and outcomes. The session notes will be kept internal to the TOAD-Connection workgroup. -5Workgroup Members The AESO is seeking a workgroup that consists of the parties listed below. The AESO will finalize the workgroup by February 17th, 2010 and notify parties accordingly. Again, as mentioned in the ‘Introduction’ section, stakeholders interested in participating in he TOAD-Connection workgroup should contact Evelyn Kelly at Evelyn.Kelly@aeso.ca or at 403-539-2468 by February 18th, 2010 1 direct connect generator 1 direct connect load 1 transmission facility owner 1 distribution facility owner 1 party with an Industrial System Designation 2500, 330 - 5th Ave SW Calgary, Alberta T2P 0L4 t 403.539.2450 | f 403.539.2949 | www.aeso.ca