DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 9, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Dibis 5, CP, returned from rehabilitation on schedule. Generation: Peak Power 4272Mw, 91,181Mw hours, 7-day Avg. 3934Mw Peak Generators Returned to Service Najebia 4 Qudas 2 Taji 1 Taji 4 Dibis 5 Generators Unscheduled Out of Service PLANT Type SP, CP, RP, HP Dibis 2 SP * Baiji 1 SP Baiji 6 SP * Daura 3 SP Daura 4 SP South Baghdad 1 SP South Baghdad 2 SP South Baghdad 5 SP South Baghdad 6 SP Baiji 2, CP Hilla 2 CP Mosil 1 CP Mosil 3 CP Mosil 9 CP Old Mulla 1 CP Old Mulla 2 CP New Mulla 6 CP Taji 3, CP Taji Mobile, 2 CP Daura 4 CP Shuaiba 2, CP * RED – Denotes out of service since last report Page 1 of 3 2/29/2004 2/22/2004 2/15/2004 2/8/2004 2/1/2004 1/25/2004 1/18/2004 1/11/2004 1/4/2004 12/28/2003 12/21/2003 12/14/2003 12/7/2003 11/30/2003 11/23/2003 6000 5000 4000 3000 2000 1000 0 11/16/2003 Megawatts Iraq Peak Output 7-Day Avg Fault Boiler leak Boiler Leak Insulation Test Boiler Leak Rotor Repair Boiler Leakage Air Heater Air Heater Boiler Leak Lubricating oil leak Servo Rotor Defect Bleeder Valve Rotor Defect Acc Gear Servo and Circuit breaker Generator Defect Compressor Software problem Diesel trouble Stand By 247 Mw 85 Mw 110 Mw 15 Mw 15 Mw 22 Mw 793 Mw Mw 8 90 90 65 65 30 30 30 30 110 15 15 15 15 15 15 30 15 15 15 80 Generators Scheduled Out of Service PLANT Type Prog. Maintenance(M) SP/NG / Rehab (R) Maint. Org. Baiji 2 SP M Bechtel Baiji 6 SP M Bechtel Daura 3 CP R GRD/RIE Daura 5 SP R Bechtel Daura 6 SP R Bechtel Dibis 3 SP M ME Dibis 4 CP R GRD/RIE Hartha 4 SP M ME/Bechtel Khor Zubayr 4 CP R GRD/RIE Mussaibe 4 SP M ME Najaf 2 CP M GRD/RIE New Mulla 1 CP M GRD/RIE New Mulla 4 CP M GRD/RIE Old Mulla 5 CP M GRD/RIE Old Mulla 10 CP M GRD/RIE Old Mulla 12 CP R GRD/RIE Taji 7 CP R GRD/RIE LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: CP: RP: HP: Date outof service 2 Jan 04 5 Dec 03 1 Mar 03 Jul 03 Jul 03 30Dec 03 Sep 03 23Oct 03 20Dec03 7 Feb 04 5 Dec 03 13 Jan 04 3 Jan 04 1 Nov 03 6 Jan 04 1 Oct 03 1 Oct 03 1001 Mw Est. InMw service Date 01Mar 100 18 Feb 100 1 Jun 20 30 Apr 100 31May 100 15 Feb 8 30 Mar 18 14 Feb 150 14 Feb 55 21 Feb 180 30 Apr 50 1 Jun 30 1 Jun 30 1 Jun 15 1 Jun 15 1 Jun 15 TBD 15 STEAM POWER – These plants use either fuel oil or crude in burners COMBUSTION POWER RECIPROCATING POWER HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of service Nassiriya-Khor Zubayr Haditha-Baghd West Hartha-Qarna – Wasit 400 400 400 Sabotage Sabotage Sabotage Bechtel GRD/RIE GRD/RIE Baiji - Baghd West #1 Baghd E.-Baghd S. #2 Haditha – Qaim Baiji – Haditha Diyala Connection Mosul – Mosul East Dibis/IrbilAzadi/Quarqush Shuwaiba-Toba-Hamar Baghd West – Jamia Omara-Burzegan Temim- Tuz Nejibiya – Hartha 400 400 400 400 400 132 132 Sabotage New Line Sabotage Sabotage Sabotage Sabotage New Line GRD/RIE GRD/RIE ME ME ME ME GRD/RIE 10 Feb 10 Feb TBD TBD 30 Apr TBD 1 Jun 132 132 132 132 132 Sabotage Sabotage Looting Sabotage Sabotage ME ME ME ME ME TBD TBD 1 Mar TBD TBD Lines Returned to service: None reported today Page 2 of 3 Est. InComments service Date 1 May 15 Mar 38 towers complete/236 req’d 29 Feb 227 towers complete/293 req’d 60 towers complete/66 req’d 81 towers complete/81 req’d No Contract awarded No contract awarded Distribution: Report Date - 9 February 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 780 MW. Power transferred from South to Middle 200 MW. Baghdad Duhok Naynawa Tamim Salah Aldeen Anbar Dyala Babil Kirbala Najaf Kadsya Wasit Muthana Nasirya Misan Basra 1550 80 330 150 210 170 90 95 99 116 50 150 50 120 70 340 29243 1882 8955 3815 5172 4427 2351 2516 2147 2521 1522 2364 1335 2717 1517 7290 1218 78 373 159 216 184 98 105 89 105 63 99 56 113 63 304 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page 3 of 3