NORTH COUNTY EDUCATIONAL PURCHASING CONSORTIUM MiraCosta Community College District One Barnard Dr. Oceanside, CA 92056 Phone: 760-795-6755 Fax: 760-795-6795 September 16, 2015 ADDENDUM #1 1. Can we respond with a ‘cost plus’ (percentage above cost) in place of percentage off in that section? No. The NCEPC uses the percentage off of MSRP for this section. 2. To have items added to the product list, one of the member districts would have to recommend one or more of our products by sending you an email correct? All items listed on this bid have been requested by either a member district or an associate member district to the bid administrator. Adding additional items to this list would be done the same way. 3. While we have no specific products on this year’s bid, we did make the percentage off bid list. Does this mean that it’s possible to be on the Percent off bid list, but not on the product list? Correct. While items may not be specified, the need may arise for products by a particular identified manufacturer so they have been included in the percentage off portion of the bid. 4. Material Safety Data Sheets: The instructions in the RFP request vendors to attach MSDS to certain items in the specifications document, however, after reviewing this document thoroughly, no line items (end of statement as sent to me.) This is a standard clause that only applies if there is an item this would apply to. 5. Manufacturer’s Specifications: In the specifications (pricing) document, there were no mention of actual items that needed attached spec sheets. Are vendors to include spec sheets on all products listed? Spec sheets should be provided if a different make and/model is being proposed from what is requested to assist in the determination of an equivalent. 6. I understand there is a 3% DVBE requirement and there are very thorough instructions on how to work with another DVBE to meet that requirement. We would like to propose our exclusive brand for many of the items on the contract, and we are not DVBE. Typically we can work with a DVBE installer, however there would not be any services being performed, the items we are proposing would be shipping via small package. With that, would you be able to tell me how we could proceed with this bid. The NECPC requires DVBE for this bid based upon the potential funding sources. In cases where a vendor is not DVBE, it is requested that the vendor provide proof of the good faith effort. This is all described in the bid documents. 7. If we are offering another brand from what is listed are we able to add them to the percentage off bid sheet? All items and manufactures have been requested by the Districts, so the request would have to come from an NCEPC Member or Associate Member. However, in the case of alternates being submitted for product specific items, it will be evaluated to see if it meets or exceeds the specifications. This determination is at the sole discretion of the NCEPC. Page 1 of 2 8. Is there no references requirement for this bid? No. 9. Because there are no services mentioned in the RFP, would it be possible for vendors to request a waiver from the DVBE requirement? No, based on potential funding of purchases the NCEPC requires that all vendors either be DVBE vendor or provide proof of their good faith effort as described in the bid document. 10. I was looking over this bid regarding the Smartboards. There is no installation required for these 5 boards, is that correct? That is correct. 11. We would like to get a complete recap on items, could you provide? The recap from Bid #09-14 has been provided in the attachment. 12. Can you please confirm that on the pricing sheets you want only a unit price and not an extended price utilizing the estimated usage? That is correct. The unit price for each item is all that is required. 13. Please see the Addendum 1 Bid Specification Sheets for the following corrections. Line Item 80 has been deleted as this is a duplicate item. Line 95 has an updated part number and description Line 105 has been deleted as this is a duplicate item. Line 109 has an updated part number and description Line 111 has an updated part number and description Line 112 has an updated part number and description Page 2 of 2