Road Maintenance Report 2004 Warm Springs Reservation Road Maintenance Department Percent of budget by activity code Activity Description 71 Snow and Ice Removal 11 Blading 90 Leave and Holidays 53 Striping 82 Minor Equipment Repair 40 Road Patrol 97 Travel 95 Program Management 81 Equipment Service 18 Surface Cleaning 62 Cattleguard Repair 70 Winter Prep 10 Surface Inspection 51 Sign Repair 43 Brush Removal 13 Patching 91 Training All Others 30 Activities Total Percent 16.01 15.63 14.50 11.99 7.38 5.23 5.20 4.90 3.58 3.28 2.92 2.49 2.24 2.15 1.99 1.91 1.78 12.26 Leave and Holiday Breakdown Annual Leave 8 hrs/pay period = 10% Sick Leave 4 hrs/pay period = 5% Holidays 10/year (80hrs/2080hrs) = 4% approx Total Percentage Earned = 19% Words of wisdom from first supervisor: These are valuable employees who are needed in almost all crisis situations. They complete many different tasks in any given year. If you respect them you should allow them to have some time away from job during the year. Don’t over work them. Plan their vacation time. Additional Power Point Presentations • Winter Storm 2004 (Snow and Ice Removal) • Magnesium Chloride Application (Blading) • Paint Striping (Hand and Pick-up truck towed) • Retrometer Study 30 Other Minor Activities Include the following (over $5,000+/year); Guardrail Maintenance Cleaning Ditches Cleaning Structures Mowing Delineator Maintenance Sidewalks Bridge Deck Repair