Canada’s national laboratory for particle and nuclear physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des particules ISAC Target Reliability from Design to Implementation to Long Term Service Violeta Toma WAO 2012 Accelerating Science for Canada Un accélérateur de la démarche scientifique canadienne Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété d’un consortium d’universités canadiennes, géré en co-entreprise à partir d’une contribution administrée par le Conseil national de recherches Canada Overview • Introduction to ISAC • Past: Phase I – on-line testing • one target module • more target modules • Present: Phase II – off line testing • ISAC target life cycle • Future: Phase III – remote connect & disconnect August 2012 Violeta Toma WAO 2012 2 ISAC ISAC = Isotope Separation and Acceleration August 2012 Violeta Toma WAO 2012 3 Phase one •Two target stations •One target module August 2012 Violeta Toma WAO 2012 4 ISAC Target Life Cycle Machine shop 6 -12 months August 2012 Violeta Toma WAO 2012 5 ISAC Target Life Cycle Machine shop 6 -12 months August 2012 Target (material) 1 – 8 weeks Violeta Toma\ WAO 2012 6 ISAC Target Target and target tube August 2012 Violeta Toma WAO 2012 7 ISAC Target Life Cycle Machine shop 6 – 12 months August 2012 Target material 1-8 weeks Target assembly and baking 5 days Violeta Toma WAOP 2012 8 ISAC Target • In house made target 1 -8 weeks • Target assembly &baking 5 days August 2012 Violeta Toma WAO 2012 9 ISAC Target Life Cycle Machine shop 6 -12 months Target material 1 – 8 weeks Target assembly and baking 5 days Test stand 1 week August 2012 Violeta Toma WAO 2012 10 ISAC Target August 2012 Violeta Toma WAO 2012 11 ISAC Target Life Cycle August 2012 Violeta Toma WAO 2012 12 Test stand Target assembly goes to the Test stand. August 2012 Violeta Toma WAO 2012 13 ISAC Target Life Cycle Machine shop 6 -12 months Target material 1 – 8 weeks Test stand 1 week Target installed in Target Module 2 days August 2012 Target assembly and baking 5 days Violeta Toma WAO 2012 14 ISAC Target Hot Cell (HC) – Target remote installation into the Target Module (TM) August 2012 Violeta Toma WAO 2012 15 ISAC Target Module August 2012 Violeta Toma WAO 2012 16 ISAC Target Life Cycle Machine shop 6 -12 months Target material 1 – 8 weeks Target assembly and baking 5 days Test stand 1 week Target installed in Target Module 2 days Conditioning Station 2 days August 2012 Violeta Toma WAO 2012 17 Conditioning station August 2012 Violeta Toma WAO 2012 18 ISAC Target Life Cycle Machine shop 6 -12 months Target material 1 – 8 weeks Target assembly and baking 5 days Test stand 1 week Target installed in Target Module 2 days Conditioning Station 2 days Target preparations for production 2 days Beam Delivery 2-4 weeks August 2012 Post mortem analysis and storage Violeta Toma WAO 2012 19 Beam on Target Target tube Ionizer tube Proton beam August 2012 Violeta Toma WAO 2012 20 Phase I & II Machine shop 6 -12 months Target material 1 – 8 weeks Target assembly and baking 5 days Test stand 1 week Target installed in Target Module 2 days Conditioning Station 2 days Target preparations for production 2 days Beam Delivery 2-4 weeks August 2012 Post mortem analysis and storage Violeta Toma WAO 2012 21 Documenting & Improving • Target travel document • Learn from failures • Learn from success • Standardized parts • Dedicated target reliability engineer August 2012 Violeta Toma WAO 2012 22 Phase III • Present: manual connect/disconnect • Cool- down for one week after beam off • Beam off during manual dis/re-connect • Personnel dose • Future: remote connect/disconnect • No cool-down necessary • Dis/Re-connect can be done while delivering beam from the other station • No dose to personnel August 2012 Violeta Toma WAO 2012 23 Manual Target Disconnect/Connect August 2012 Violeta Toma WAO 2012 24 Beam Availability Machine shop 6 -12 months Target material 1 – 8 weeks Target assembly and baking 5 days Test stand 1 week TRG installed in Target Module 2 days Conditioning Station 2 days Target preparations for production 2 days Beam Delivery 2-3 weeks August 2012 Post mortem analysis and storage Violeta Toma WAO 2012 25 ISAC Target • Problems: • Manufacturing problems • During baking: • Target legs warping • Target tube warping • During conditioning • Electrical short • Vacuum leaks • Water leaks August 2012 Violeta Toma WAO 2012 26 Summary • Phase I => II • Gain: ~ 9 days beam availability and improved reliability • Phase II => III • Gain: ~11 days beam availability and further improved reliability August 2012 Violeta Toma WAO 2012 27 Canada’s national laboratory for particle and nuclear physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des particules Thank you! Merci! Questions? Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété d’un consortium d’universités canadiennes, géré en co-entreprise à partir d’une contribution administrée par le Conseil national de recherches Canada TRIUMF: Alberta | British Columbia | Calgary Carleton | Guelph | Manitoba | McMaster Montréal | Northern British Columbia | Queen’s Regina | Saint Mary’s | Simon Fraser | Toronto Victoria | Winnipeg | York July 2, 2016 Presentation Title 29