CXC Response to June 04 Report 1. 2. 3. 4. Bakeout Status: Paul Plucinsky CIAO upgrade information: Jonathan McDowell DS9 and visualization scripts: Jonathan McDowell Calibration: 1. Status and requirements: Larry David 2. Iridium Edge: Herman Marshall 5. Pileup: Jonathan McDowell 6. Joint Proposals: we feel the process is working, we will continue to instruct panels to critique all time requests carefully 7. Cross-Calibration: Observation Cycle 6 Status Cycle 6 Proposal Statistics – Received 789 proposals, accepted 191 Type ARCHIVE No. Proposals No. Targets Allocated Time (ks) (or $: AR,Th) 18 0 $1,105,693 129 325 9960 GTO (competed) 3 4 84 LP 8 38 2867 THEORY 7 0 $488,224 22 34 1833 TOO/LP 1 2 340 VLP 3 12 2794 GO TOO Cycle 6 Peer Review Report (cont) Time Allocated per Instrument HRC-S/LETG 6% HRC-S 5% HRC-I 2% ACIS-I 32% ACIS-S 40% ACIS-S/HETG 12% ACIS-S/LETG 3% Cycle 6 Peer Review Report Galactic Surveys 3% Extragalactic Surveys 11% Solar System 2% Stars & WD 14% Time Allocated by Science Category WD Binaries & CV 4% Clusters of Galaxies 18% BH & NS Binaries 8% Active Galaxies 12% SN, SNR 18% Galaxies: Galaxies: Population Diffuse 7% 3% Cycle 6 Peer Review Report (cont) Percent of Requested Time Approved Galactic Surveys Extragalactic Surveys Clusters of Galaxies Active Galaxies Galaxies: Population Galaxies: Diffuse SN, SNR BH & NS Binaries WD Binaries & CV Stars & WD Solar System 0 5 10 15 20 25 Per cent o f R eq uest ed T ime A p p r o ved 30 35 40 Cycle 6 Peer Review Report (cont) Percent Proposals Accepted 60 Percent Accepted 50 40 GO LP VLP Archive Theory 30 20 10 0 1 2 3 4 Cycle 5 6 Cycle 7 Status Schedule and Deadlines for the CfP Cycle Event Date CfP Release 15 December 2004 Science Proposal Deadline (Stage 1) 6 p.m. EST, 15 March 2005 Peer Review 21-23 June 2005 Selected Proposals Announced Early July 2005 Budget Deadline (Stage 2) 6 p.m. EDT, 18 August 2005 Cost Review September 2005 Stage 2 Final Selection October 2005 EPO Electronic Deadline 5 p.m. EDT, 21 October 2005 EPO Hardcopy Deadline 4 p.m. EDT, 25 October 2005 EPO Review December 2005 Cycle 7 Starts About December 2005 What’s New in Cycle 7 Summary (Section 1.5 of CfP) Spitzer Joint Time: 110 hours Spitzer time allocated by Chandra review (400 ksec Chandra time to Spitzer review) Pitch Angle Restrictions: Restriction due to EPHIN → 70-120° New restriction, pitch angle > 168° to avoid frozen fuel lines (already being put in place for Cycle 6) Proposals: PDF files only Electronic distribution to reviewers (on CDRom), hardcopies on request only Target Specifications: emphasizing that all specifications should be explicitly entered on RPS form TOO Specification: expanded to allow follow-ups to explicitly include a different instrument (previously link had to be made manually by the CXC) Time-constrained fraction: has been reduced to 15% of targets User Interface Changes Contact Scientists: have been removed as an option User Interface (USINT): self-serve users now include: – experienced PIs with unconstrained observations – CXC and GTO PIs – Help/USINT assignment is available on request.