Director Discretionary Time Target PI ks Obs Instrument Prop. PSN J12215757 (SN) Margutti 20 1 ACIS-S N CXO J122518.6 (ULX) Heida 60 2 ACIS-S Y ASASSN-14li (TDE) Miller 60 2 HRC-S/LETG N SN2014C Margutti 30 3 ACIS-S N Swift J123205.1 (Short Troja 15 1 ACIS-S N Swift J123205.1 GRB) Levan 15 1 ACIS-S N 4U1700-37 (HMXB) Oskinova 15 1 ACIS-S/HETG N 1817-0454 (FRB) Petroff 10 1 HRC-I Y WPVS 007 (AGN) Grupe 10 1 ACIS-S N [PFH2005] 622 (GRB) Burrows 10 1 ACIS-S N Cas A CCO Posselt 50 1 ACIS-S N RW Aur (Young binary) Schneider 40 1 ACIS-S N GK Persei(Dwarf Nova) Orio 35 1 ACIS-S/HETG N CUC 29 Sept 2015 (SN) (NS) Director’s Report Director Discretionary Time (cont) Target PI ks Obs Instrument 1RXS J180408.9 LMXB Degenaar 30 1 ACIS-S/HETG Y GRB150423A (GRB) Berger 25 1 ACIS-S N SAX J1808.4 (AMXP) Patruno 30 1 HRC-S Y 2S1553-542 (Transient) Lutovinov 5 1 ACIS-I Y SNhunt275 (Massive *) Margutti 20 2 ACIS-S N M 82 (IMBH?) Brightman 10 1 ACIS-I N V404 Cyg (XRB) King 55 2 ACIS-S/HETG N Neilsen 40 1 ACIS-S/HETG N V404 Cyg Prop. V404 Cyg (Rings) Heinz 28 1 ACIS-S N Pluto (Planet) McNutt 140 1 ACIS-S N NGC 660 (AGN) Annuar 10 1 ACIS-S N CUC 29 Sept 2015 Director’s Report DDT Summary Proposal Status: • 24 DDT requests approved: • 15 DDT requests denied/withdrawn: 785 ks 677 ks Cycle time used: • Cycle 16: 595 ks • Cycle 15: 420 ks (total) • Carry-forward (from Cycles 13-15): 590 ks Pending Requests: • 2 proposals, 20 ks total CUC 29 Sept 2015 Director’s Report NASA Senior Review 2016 Draft Call for Proposals received 20th August Comments sent by Sept 11th deadline Final Call for Proposals received 25th Sept Deadline: 22 Jan 2016 Review at OCC, 22-24th Mar 2016 Changes: Proposal requested as a “Delta” on SR2014 20 page limit (down from 30) Review 1 day shorter Proposal preparation will be similar to past cycles CUC 29 Sept 2015 Director’s Report Large, Joint-time Proposals Joint time program solved multiple-jeopardy for small programs only (< 400 ks or equivalent) Time-domain campaigns are ~impossible, as discussed at a workshop on time-domain science: Lorentz Center, July 2015 (usually try for DDT time) Options to facilitate time-critical programs: • “Hold” a large joint program until required joint time has been approved, discard if it is not • Large, multi-mission joint CfP (discussed with XMM, Integral, Spitzer so far). If all relevant missions are interested, this would likely take a few years to work out. CUC 29 Sept 2015 Director’s Report