Marvin IE Roles Harris Aug. 14, 2006

advertisement
What does an IE Do?
• An Industrial Engineer can study various fields which
include:
–
–
–
–
–
Quality
Manufacturing
Supply Chain Management
Ergonomics
Production and Distribution
Filename/###, #1
assured communications™
1-Jul-16
My Life as an IE at Harris
Manufacturing Engineer
Quality Engineer
Patricia
UF Graduate 2003
Sandra
UF Graduate 2004
Carlos
UF Graduate 2000 (he’s OLD)
Let’s Follow the lives of Mfg and
Quality Engineers
Filename/###, #2
assured communications™
1-Jul-16
Manufacturing Engineer
• Involved in design reviews to ensure
manufacturability of the product
• Determines methods for building product and creates
documentation and work instructions for building
hardware
• In charge of maintaining schedule requirements and
meeting shipping dates
Filename/###, #3
assured communications™
1-Jul-16
Simulation at Harris
• As IE’s one of the courses you take is a Simulation
course, typically Arena
• Arena is playing in an important role in proposal and
high volume manufacturing line
• Great for presentations – helps visually demonstrate
potential bottleneck
• Information can be transferred to Excel, which makes
it user friendly for anyone!
Filename/###, #4
assured communications™
1-Jul-16
Arena Simulation
O f f l i ne As s y
0
0%
GPD
Pal om ar
0%
St aki ng &
Cabl e I nst al l at i on
April 1, 2004
Sm oc k Room
D i s penser A
Rew or k
0
%
I n s t a l
C a b le s
ESS Cham ber s
0%
Pul l Tes t er
W i r ebonder A
M at er i al
I ns pec t i on
QC C lo s e Ou t
W i r ebonder B
0%
GPD
0
D i s penser B
0%
Color and Symbol Key
M a nuf a c t ur i ng I ns p e c t :
per f or m s
a l M a n u f a c t u r in g
I ns pec t
O per at or :
O per at or :
Of f lin e
S t a k in g
A s s e m b ly
Par t
T HROUGHPUT
and
B o n d in g
M ar k
P u lin g
I n s t a l C a b le s
Q ua l i t y Cont r ol O pe r a t or
p e f o r m s a l QC , T o t a l Qt y : 3
O per at or :
G P D M a c h in e s
P a lo m a r
Filename/###, #5
O per at or :
A and
M a c h in e
B
R e wo r k
W ir e b o n d
O per at or :
M a c h in e s
0
K it s
P ul Te s t
M a c h in e
N O TE:
Gr e e n T e x t
B o x / Op e r a t o r 's
s hir t t ur ns gr e en => Bus y
assured communications™
1-Jul-16
Arena Simulation
• Training in Pittsburg from Rockwell Software
• 5 programs currently use Arena and it’s growing!
• RF Communications division in Rochester is using
Arena for its Falcon Radios
0
M a te Bo a rd
Sta ti o n
Number coming
int o bef ore
deciding digit al
or jdam
Decide if ti is digit al or
JDAM
0
0
Tr ue
Number Digit al
Mat e
Bri n g a Di g i ta l
J DAM a n d a n
RF J DAM
Fals e
Mat e t he t wo
part s
0
18 Mat e Boards
Process
Change t o
Module Pict ure
Number out of
Mat e Boards
Process
Ro u te AT P fro m
M a te Bo a rd
Sta ti o n
0
Number RF mat e
0
Filename/###, #6
assured communications™
1-Jul-16
Lean Facilitation & Training
• Facilitate and Lead Lean Events
• 6S, Six Sigma, Lean, Value Stream Mapping
Reduce Cycle Time!
3099537-X01 ICP Power Supply Module (Original State)
Friday, March 26, 2004
Part Mark
Lamination
Isolation test
Wait
for PE
Kit Pull
OPN 005
Wait
for PE
OPN 010
C/T = 5 Min
C/T = 30 Min
Manual Assy
Install Spring Pins
OPN 015
C/T = 3 Min
Bond (EA9320)
Align. Pins;
Extractors;
Wedgelocks; OPN
020,025,030
Manual Assy
PE performs this
test
C/T = 15 Min
Manual Bond and
Oven
I
OPN 040
In Shelf
Bond (Delta Bond
152)
C/T = 5 Min
C/T = 10 Min
C/O = 15 Min
C/O = 10 Min
+ 60 Min Bake
+ 35 Min Bake
C/T = 15 Min
60 Min cure
To
Line 2
Manual Bond and
Oven
OPN 045
@ 80 C
Increase Efficiency!
@ 65 C
6.1 Day
Average L/T
Manual Assy
QC Inspect
From
Line 1
I
In Shelf
I
OPN 050
In Shelf
Functional Test
I
In Shelf
C/T = 120 Min
C/T = 15 Min
I
OPN 099
In Shelf
C/T = 30 Min
QC Inspect
From
Line 2
I
In Shelf
OPN 150
C/T = 10 Min
0.4 Day
Average L/T
In Shelf
Manual Hrdwr
Mount
OPN 175
C/T = 15 Min
1.9 Day
Average L/T
I
I
Out Shelf
In Shelf
Functional/ATP
Test
I
In Shelf
Power Supply
Tester
OPN 190
C/T = 15 Min
0.5 Day
Average L/T
QC Final
Inspection
I
I
Out Shelf
In Shelf
A
Coating Rm
Bond L5 Leads to
L5 Body
Patch Coat
Manual RTV 3145
C/T = 6 Min
C/T = 6 Min
+ 30 Min Bake
+ 60 Min Bake
Not Previously Performed Estimation based on Coating Room
Average L/T = 2.3 Days
1.8 Day
Average L/T
Install Cover &
Label
I
Power Supply
Tester
OPN 125
C/T = 18 Min
8.8 Day
Average L/T
A
B
Install CCA,
Solder Clip &
Inductor Leads
OPN 065,080,085
QC Inspect
To
Line 3
B
To
Shipping or
Stock
OPN 199
C/T = 25 Min
2.0 Day
Average L/T
Page 4
Total Cycle Time =
10.2Hrs (C/T=343 Min + C/O=25 Min + Cure/Bake=245 Min)
Avg Production Lead Time = 23.8 Days (6.0 days Development + 17.9 days Normal Production Lead-Time)
Reduce Floor Space Needed!
Filename/###, #7
assured communications™
1-Jul-16
What does a Quality Eng Do???
• Involved with the producability of the unit during the
design phase
• Works on proposals for new programs
• Responsible for cost account managing and
maintaining Supplier and Cost Performance Index
• Make sure program stays on schedule and ships on
time
• Works in a team with QE, Test Engineers, Reliability
Engineer, Program manager, etc.
• Coordinates manpower required for production build,
and manages assemblers and technicians to make
sure they’re doing their job well
Filename/###, #8
assured communications™
1-Jul-16
What does a Quality Eng Do???
• We solve problems!
• Ensure processes and procedures are being followed
• Travel to suppliers to solve issues and inspect first
article hardware
• Provide refresher training on procedures for
engineers and technicians
• Resolve issues with incoming parts through the
Receiving Inspection department
Filename/###, #9
assured communications™
1-Jul-16
A or B???
• At Harris you’re not just stuck in two options…
As an IE you’re versatile enough to try many different
career options…..even CEO…
Howard Lance graduated in Industrial Engineering!
For more information visit:
http://www.iienet.org/