What does an IE Do? • An Industrial Engineer can study various fields which include: – – – – – Quality Manufacturing Supply Chain Management Ergonomics Production and Distribution Filename/###, #1 assured communications™ 1-Jul-16 My Life as an IE at Harris Manufacturing Engineer Quality Engineer Patricia UF Graduate 2003 Sandra UF Graduate 2004 Carlos UF Graduate 2000 (he’s OLD) Let’s Follow the lives of Mfg and Quality Engineers Filename/###, #2 assured communications™ 1-Jul-16 Manufacturing Engineer • Involved in design reviews to ensure manufacturability of the product • Determines methods for building product and creates documentation and work instructions for building hardware • In charge of maintaining schedule requirements and meeting shipping dates Filename/###, #3 assured communications™ 1-Jul-16 Simulation at Harris • As IE’s one of the courses you take is a Simulation course, typically Arena • Arena is playing in an important role in proposal and high volume manufacturing line • Great for presentations – helps visually demonstrate potential bottleneck • Information can be transferred to Excel, which makes it user friendly for anyone! Filename/###, #4 assured communications™ 1-Jul-16 Arena Simulation O f f l i ne As s y 0 0% GPD Pal om ar 0% St aki ng & Cabl e I nst al l at i on April 1, 2004 Sm oc k Room D i s penser A Rew or k 0 % I n s t a l C a b le s ESS Cham ber s 0% Pul l Tes t er W i r ebonder A M at er i al I ns pec t i on QC C lo s e Ou t W i r ebonder B 0% GPD 0 D i s penser B 0% Color and Symbol Key M a nuf a c t ur i ng I ns p e c t : per f or m s a l M a n u f a c t u r in g I ns pec t O per at or : O per at or : Of f lin e S t a k in g A s s e m b ly Par t T HROUGHPUT and B o n d in g M ar k P u lin g I n s t a l C a b le s Q ua l i t y Cont r ol O pe r a t or p e f o r m s a l QC , T o t a l Qt y : 3 O per at or : G P D M a c h in e s P a lo m a r Filename/###, #5 O per at or : A and M a c h in e B R e wo r k W ir e b o n d O per at or : M a c h in e s 0 K it s P ul Te s t M a c h in e N O TE: Gr e e n T e x t B o x / Op e r a t o r 's s hir t t ur ns gr e en => Bus y assured communications™ 1-Jul-16 Arena Simulation • Training in Pittsburg from Rockwell Software • 5 programs currently use Arena and it’s growing! • RF Communications division in Rochester is using Arena for its Falcon Radios 0 M a te Bo a rd Sta ti o n Number coming int o bef ore deciding digit al or jdam Decide if ti is digit al or JDAM 0 0 Tr ue Number Digit al Mat e Bri n g a Di g i ta l J DAM a n d a n RF J DAM Fals e Mat e t he t wo part s 0 18 Mat e Boards Process Change t o Module Pict ure Number out of Mat e Boards Process Ro u te AT P fro m M a te Bo a rd Sta ti o n 0 Number RF mat e 0 Filename/###, #6 assured communications™ 1-Jul-16 Lean Facilitation & Training • Facilitate and Lead Lean Events • 6S, Six Sigma, Lean, Value Stream Mapping Reduce Cycle Time! 3099537-X01 ICP Power Supply Module (Original State) Friday, March 26, 2004 Part Mark Lamination Isolation test Wait for PE Kit Pull OPN 005 Wait for PE OPN 010 C/T = 5 Min C/T = 30 Min Manual Assy Install Spring Pins OPN 015 C/T = 3 Min Bond (EA9320) Align. Pins; Extractors; Wedgelocks; OPN 020,025,030 Manual Assy PE performs this test C/T = 15 Min Manual Bond and Oven I OPN 040 In Shelf Bond (Delta Bond 152) C/T = 5 Min C/T = 10 Min C/O = 15 Min C/O = 10 Min + 60 Min Bake + 35 Min Bake C/T = 15 Min 60 Min cure To Line 2 Manual Bond and Oven OPN 045 @ 80 C Increase Efficiency! @ 65 C 6.1 Day Average L/T Manual Assy QC Inspect From Line 1 I In Shelf I OPN 050 In Shelf Functional Test I In Shelf C/T = 120 Min C/T = 15 Min I OPN 099 In Shelf C/T = 30 Min QC Inspect From Line 2 I In Shelf OPN 150 C/T = 10 Min 0.4 Day Average L/T In Shelf Manual Hrdwr Mount OPN 175 C/T = 15 Min 1.9 Day Average L/T I I Out Shelf In Shelf Functional/ATP Test I In Shelf Power Supply Tester OPN 190 C/T = 15 Min 0.5 Day Average L/T QC Final Inspection I I Out Shelf In Shelf A Coating Rm Bond L5 Leads to L5 Body Patch Coat Manual RTV 3145 C/T = 6 Min C/T = 6 Min + 30 Min Bake + 60 Min Bake Not Previously Performed Estimation based on Coating Room Average L/T = 2.3 Days 1.8 Day Average L/T Install Cover & Label I Power Supply Tester OPN 125 C/T = 18 Min 8.8 Day Average L/T A B Install CCA, Solder Clip & Inductor Leads OPN 065,080,085 QC Inspect To Line 3 B To Shipping or Stock OPN 199 C/T = 25 Min 2.0 Day Average L/T Page 4 Total Cycle Time = 10.2Hrs (C/T=343 Min + C/O=25 Min + Cure/Bake=245 Min) Avg Production Lead Time = 23.8 Days (6.0 days Development + 17.9 days Normal Production Lead-Time) Reduce Floor Space Needed! Filename/###, #7 assured communications™ 1-Jul-16 What does a Quality Eng Do??? • Involved with the producability of the unit during the design phase • Works on proposals for new programs • Responsible for cost account managing and maintaining Supplier and Cost Performance Index • Make sure program stays on schedule and ships on time • Works in a team with QE, Test Engineers, Reliability Engineer, Program manager, etc. • Coordinates manpower required for production build, and manages assemblers and technicians to make sure they’re doing their job well Filename/###, #8 assured communications™ 1-Jul-16 What does a Quality Eng Do??? • We solve problems! • Ensure processes and procedures are being followed • Travel to suppliers to solve issues and inspect first article hardware • Provide refresher training on procedures for engineers and technicians • Resolve issues with incoming parts through the Receiving Inspection department Filename/###, #9 assured communications™ 1-Jul-16 A or B??? • At Harris you’re not just stuck in two options… As an IE you’re versatile enough to try many different career options…..even CEO… Howard Lance graduated in Industrial Engineering! For more information visit: http://www.iienet.org/ Filename/###, #10 assured communications™ 1-Jul-16