L1_Cal Int/Comm Team Bagby/Mulhearn 7.26.05 Daily Toolbox meetings 9AM @ DAB1 Links for updates Schedule: Tasks for Review – http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut es/Daily_Toolbox/Schedule.pdf Daily Plan: Progress – http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut es/Daily_Toolbox/Daily_Plan.pdf Everyone at Fermilab working on L1_Cal should attend this VERY short meeting. Status Bagby/Mulhearn 7.26.05 ADFTAB Transition Parity Test write-up available by Rahmi. http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Review_D ocs/ADF_TAB_Parity.pdf Focusing on synchronization. TABL2/L3 “g-link” errors to L2 resolved. SCL/VME driver, VTM, noisy Ch0 EOFL (word error) Now looking at GOFL (protocol errors) Investigating VRB application firmware to establish BER. GABL2 No transmission errors detected. Status Bagby/Mulhearn 7.26.05 WIENEREPICS Hardware available for GUI work. Transition System Investigating ACT FP spacing. Several full channels tested w/MSU tester. Establishing testing procedure. Glenair test set-up Card is in house. Awaiting tool for press fit connector. ORC AC Distribution done. Working on DC.