Everyone at Fermilab working on L1_Cal should
attend this VERY short meeting.
Status
Bagby/Mulhearn 7.26.05
 ADFTAB

Transition Parity Test write-up available by Rahmi.


http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Review_D
ocs/ADF_TAB_Parity.pdf
Focusing on synchronization.
 TABL2/L3

“g-link” errors to L2 resolved.



SCL/VME driver, VTM, noisy Ch0 EOFL (word error)
Now looking at GOFL (protocol errors)
Investigating VRB application firmware to establish BER.
 GABL2

No transmission errors detected.
Status
Bagby/Mulhearn 7.26.05
 WIENEREPICS

Hardware available for GUI work.
 Transition System


Investigating ACT FP spacing.
Several full channels tested w/MSU tester.


Establishing testing procedure.
Glenair test set-up

Card is in house. Awaiting tool for press fit connector.
 ORC

AC Distribution done. Working on DC.