2014/15 Dipaleseng Local Municipality 2014/15 Annual Performance Report “Provide Quality Affordable Services Page 1 of 45 and GTable of Contents 1. PURPOSE OF THIS REPORT ......................................................................................................3 2. EXECUTIVE SUMMARY ...............................................................................................................3 3. CHALLENGES .............................................................................................................................. 3 4. DEPARTMENTAL PERFORMANCE ............................................................................................... 4 5. PERFORMANCE BY DEPARTMENT ........................................................................................... 6 5.1: OFFICE OF THE MUNICIPAL MANAGER.................................................................................... 6 5 2: BUDGET AND TREASURY ........................................................................................................13 5.3: CORPORATE SERVICES ..........................................................................................................20 5.4 COMMUNITY SERVICES & PUBLIC SAFETY ............................................................................ 27 5.5: PLANING AND ECONOMIC DEVELOPMENT............................................................................ 32 5.6: INFRASTRUCTURE AND TECHNICAL SERVICES ...................................................................39 Page 2 of 45 1. PURPOSE OF THIS REPORT The purpose of this report is to give feedback regarding the performance of the Dipaleseng Local Municipality as required through The Municipal Systems Act No 32 of 2000 and Municipal Finance Management Act No 1 2 52 of 2003. The information included in this report is based on the IDP and SDBIP as developed for the financial year 2014/15. The scorecards were developed to reflect cumulative performance, therefore the status of indicators are a reflection of the overall performance level achieved in the financial year under review. This report is based on information received from each department for annual assessment of performance ending June 2015. Overall performance for the Dipaleseng Local Municipality is based on the Departmental Performance scorecard which is inclusive of all the IDP, SDBIP indicators and Projects. Sub-sections are included that discuss the progress made in achieving the targets as detailed in each scorecard in terms of the contribution made by each Department. This report serves as a summary of results developed to reflect cumulative performance, therefore the status of indicators are a reflection of the overall performance level achieved in the year. Under review 2. EXECUTIVE SUMMARY This report serves as the Final Annual Performance Report for the financial year 2014/2015 ending June 2015.It provides feedback on the performance level achieved to date against the targets as set out in the IDP and SDBIP. Where under performance has been experienced the respective concerns or mitigating reasons are highlighted and detail pertaining to the relevant measures being implemented or those that need to be implemented are included thereto. The overall performance for the Dipaleseng Local Municipality is based on the Departmental Performance Scorecard as this contains all of the indicators as included in the IDP, SDBIP Scorecards. A total of 89 KPI’s and 17 projects encompassing the different scorecards were measured for the financial year under review. The overall achievement of the municipality is depicted in Table 2 below 3. CHALLENGES The main challenge related to finances with the Municipality operating on a deficit Budget due to the low levels of revenue collection experienced, 55% in the current year. This state of affairs seriously curtailed the implementation of key programmes and projects as well as restricting the appointment of key personnel. Page 3 of 45 4. DEPARTMENTAL PERFORMANCE This report serves as a summary of results. The detail pertaining to the Key Performance Indicators (KPIs) and Projects are included as individual tables in each section of the Directorate’s individual performance and are colour coded for ease of interpretation as represented in the following table. Table 1: Colour Coding Colour code Rating Target not achieved Below average Target Achieved The overall institutional performance is expressed by KPI category in Table 2 below. Table 2: Institutional KPI Achievement Category Total KPIs Assessed Target Achieved IDP SDBIP 28 61 11 32 39% 53% 9 9 SUB TOTAL 89 42 47% 18 PROJECTS TOTAL 25 114 7 49 28% 43% 4 22 % Partially Achieved % 32% 15% 20% 16% 19% Target Not Achieved 8 20 28 6 34 29% 32% 33% 56% 38% The Departmental Performance Scorecard constitutes all of the KPI’s inclusive of the IDP and SDBIP Scorecards. This section of the report provides information on the contribution made by each Directorate to the overall organisational performance level achieved by the Dipaleseng Local Municipality for the period ending June 2015. Page 4 of 45 Tables 3 and 4 below depict in summary format the overall performance level achieved by each Directorate with respect to achievement in attaining the targets applicable to the measurement of KPI’s and Projects inclusive of the IDP and SDBIP scorecards. Table 3 Departmental Performance – KPI’s Total KPIs Assessed Target Achieved Office of the MM Budget & Treasury 17 11 16 Department % Partially Achieved % Target Not Achieved % 8 65% 50% 0 2 0% 16,7 6 6 35 33,3 Corporate Services 17 10 86% 2 7% 5 7% Community Services 7 2 29% % 0 0% 5 71% Planning & Development 13 4 31% 8 62% 1 7% Infrastructure & Technical Total 19 89 8 42% 48.% 0 12 0% 14% 11 34 58% 38% % 43 Table 4: Departmental Performance - Projects Department Total KPIs Assessed Target Achieved % Partially Achieved % Target Not Achieved Office of the MM Budget & Treasury 1 2 0 1 0% 50% 0 1 0% 50% 1 0 Corporate Services 2 1 50% 0 Community Services 3 2 67% 0 Planning & Economic Dev Deve Development Infrastructure & Technical 5 2 40% 3 4 17 1 7 25% 41% 0 4 0% 24% Total 0% 100% 0% 1 50% 0% 1 33% 60% 0 0% 3 6 75% 35% Page 5 of 45 5. PERFORMANCE BY DEPARTMENT 5.1: OFFICE OF THE MUNICIPAL MANAGER The Office of the Municipal Manager is responsible for a total of 17 KPI’s and 1 Project which contribute to the overall performance level for the IDP and SDBIP Scorecards. The statistics for the Department are as follows: Category Total KPIs Assessed Target Achieved % Partially Achieved % Target Not Achieved % IDP SDBIP SUB TOTAL 5 12 17 5 6 11 100% 50% 65% 0 0 0 0% 0% 0% 0 6 6 0% 50% 35% PROJECTS TOTAL 1 18 0 11 0% 61% 0 0 0% 0% 1 7 100% 39% The achievement of each KPI and Project by Departmental section follows: Governance Youth Community Participation Projects Page 6 of 45 DIVISION – GOVERNANCE Key Performance Area (KPA) Municipal transformation and Institutional development 2014/15 Strategic Objective Programme Development and implementation broader public participation policy Community Participation Provide a safe and healthy working environment Performance Management Type Key Performance Indicators Number of municipal SDBIP newsletter’s published Percentage of website update requests completed within 7 SDBIP working days Number of scheduled SDBIP Section 79 Portfolio meetings facilitated Number of scheduled Section 80 Portfolio SDBIP meetings facilitated SDBIP Percentage of increase in organisational performance Baseline 2013/14 Annual Target 2 1 Actual Comments Corrective Action Target NOT Achieved Utilization of other avenues and sources To consider joint venture with GSDM 0 None New 10 1 50% Page 7 of 45 100% 12 12 60% 100% Target Achieved Target 10NOT Achieved Target NOT Achieved Target 6Partially Achieved 52% Target NOT Achieved Target NOT Achieved Forward the yearly schedule of meetings to all members Matter was discussed at the Mayoral meeting and the Committees did sit in the last Quarter hence partially achievement. Cash flow constraints DIVISION – GOVERNANCE Key Performance Area (KPA) Municipal transformation and Institutional development 2014/15 Strategic Objective To ensure effective oversight and good governance Programme Governance and Administration Type SDBIP SDBIP Financial viability and financial management To ensure management excellence in Budget and Expenditure process controls SDBIP Financial Liquidity and Viability SDBIP KPI Number of Audit reports submitted annually Percentage of Employees costs of total operating Budget (annually) Percentage of total Operational Budget spent Percentage of audit projects executed in terms of approved Risk based Audit Plan Baseline 2013/14 Annual Target 1 >31% 4 >31% Actual 1 >31% Comments Target NOT Achieved. Audit committee not fully functional. Corrective Action Established Audit committee by the 3rd Quarter. Target Achieved <80% 80% <80% 100% 100% Target Achieved 0% Target NOT Achieved Risk Audit Committee not in place. Risk Committee to be established in the 2015/16 financial year. Page 8 of 47 Page 8 of 45 DIVISION – YOUTH Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective To provide developmental and recreational opportunities for the youth Programme Type KPI Number of sports SDBIP development programmes conducted Number of Local Youth Youth SDBIP Committee Development meetings facilitated Sports, Arts and Culture Baseline 2013/14 Annual Target Actual Target Achieved 2 4 New 3 6 10 New 20 30 SDBIP Number of Special Programmes Facilitated in respect of Elderly and Disabled Corrective Action 4 SDBIP Number of HIV/AIDS programmes facilitated Comments Target Exceeded due to availability additional resources Target Exceeded due to availability additional resources Target Not Achieved. New Page 9 of 45 1 0 Inauguration rescheduled for 2015/16 financial year. DIVISION – COMMUNITY PARTICIPATION Key Performance Area (KPA) Intergovernmental relations, Good Governance and Public Participation Strategic Objective Development and implementatio n of broader public participation Programme Key Performance Type Indicators [KPI] Ward IDP Governance IDP Community Participation IDP IDP IDP Number of stakeholder meetings facilitated Number of IDP Consultation meetings facilitated Number of Budget Consultation meetings Number of ward committees meeting facilitated Number of Ward Committee reports submitted to Council and Province on quarterly basis 2014/15 Baseline 2013/14 Annual Target Actual Comments Target achieved 16 40 40 10 10 10 Tatgasgs445cccc55Targe t Achieved Target achieved Target Achieved 10 21 10 72 10 Target achieved Target Achieved 72 Target achieved Target Achieved Target achieved 4 Page 10 of 45 4 4 Corrective Action OFFICE OF THE MUNICIPAL MANAGER - PROJECTS Key Performance Area (KPA) Municipal transformation and Institutional development 2014/15 Strategic Objective Development and implementation PMS Framework Programme Performance Management Type SDBIP KPA Indicators Implement a Performance Management System(PMS) Baseline 2013/ 14 New Page 11 of 45 Annual Target Actual Comme nts Corrective Action Target Not Review and submission of PMS framework and policy Framework Activation of in place only. Achieved electronic PMS process to Target PMS be implemented NOT application as part of IDP Achieved Review 5 2: BUDGET AND TREASURY The Finance Department is responsible for a total of 16 KPI’s and 2 Projects which contribute to the overall performance level for the IDP and SDBIP Scorecards. The statistics for the Department were as follows: Category Total KPIs Assessed Target Achieved % IDP SDBIP SUB TOTAL 0 16 16 0 8 8 0% 50% 50% 0 PROJECTS TOTAL 2 18 1 9 50% 50% 1 3 Partially Achieved 0 2 % 0% 0% 13% 50% 17% Target Not Achieved % 0 6 6 0% 50% 37% 0 6 0% 33% The detailed achievement of each KPI and Project by department is highlighted per section: Revenue Expenditure Financial Management Supply Chain Management Projects Page 12 of 45 DIVISION – REVENUE Key Performance Area (KPA) Strategic Objective Financial viability and financial management To expand and improve the revenue base of the municipality through the implementation of the revenue enhancement strategy Programme Revenue Management Type Key Outcome Performance Indicator (KPI) Baseline 2013/14 SDBIP % service payment level (annual) 53% SDBIP % Debt coverage ratio (NKPI)annual SDBIP % outstanding service debtors to revenue (NKPI) annual Sustainable revenue collection Annual Actual Target 171,8 Proper expenditure control Page 13 of 45 2014/15 75.00% 65% 171,8 75.00% Comments Corrective Measure 55% Target not achieved Continuous implementation of revenue enhancement strategy 175.0 Target achieved none 136% Target achieved none DIVISION - EXPENDITURE Key Performance Area (KPA) Strategic Programme Objective Type Financial viability and financial management To ensure manageme nt excellence in Budget and Expenditur e process controls Financial Liquidity and Viability Key Performance Indicator (KPI) Outcome SDBIP Cost coverage ratio of 2.0 (NKPI) annual Financial Liquidity SDBIP 1000 Registration of all eligible Indigents Poverty Alleviation SDBIP Baseline 2013/14 2014/15 Annual Target Actual Comments Corrective Measures 0.75 2.00 1.69 Target partially achieved 735 1000 408 Target not achieved 1000 households (as per indigent register) with access to free basic services (annual)(NKPI) 735 1000 408 Target not achieved SDBIP R100 000 of social support package 111,720 1000 69,360 Target not achieved SDBIP 100% Municipal Systems Improvement Grant (MSIG) utilisation (annual) 100% 100% 100% Target achieved Effective Institutional Administration Page 14 of 45 Continuous implementation of revenue enhancement strategy Indigents registration to be conducted between the fourth quarter of 2014/15 financial year to inform the 2015/16 budget Indigents registration to be conducted between the fourth quarter of 2014/15 financial year to inform the 2015/16 budget Indigents registration to be conducted between the fourth quarter of 2014/15 financial year to inform the 2015/16 budget DIVISION – FINANCIAL MANAGEMENT Key Performance Area (KPA) Strategic Objective Financial viability and financial management To ensure full compliance with MFMA and GRAP with regard to financial management reporting Programme Financial Accountability and Compliance Type Key Performance Indicator (KPI) Outcome SDBIP 100% compliance to MFMA checklist on quarterly basis Compliance to legislation SDBIP 100% compliance to Section 71 Reports submitted to Mayoral Committee and Council Page 15 of 45 Baseline 2013/14 2014/15 Annual Target Actual Comments Corrective Measure 100% 100% 100% Target achieved none 100% 100% 100% Target achieved none DIVISION – SUPPLY CHAIN MANAGEMENT Key Performanc e Area (KPA) Strategic Objective Programme Financial viability and financial management To implement an effective, efficient and economical managemen t (SCM) system that is 100% compliant with MFMA and Treasury regulations Supply Chain Management Type Key Performanc e Indicator (KPI) Outcome SDBIP 100% reduction of internal and external audit queries on the SCM processes. SDBIP 4 SCM reports submitted in respect to internal SCM policy requirements SDBIP 4 deviations reports for Mayoral and Council Ensure effective, efficient and complianc e with SCM legislation and Processes Effective, efficient and complianc e with SCM legislation and Processes Effective, efficient and complianc e with SCM legislation and Processes Baseline 2013/14 2014/15 Annual Actual Target 50 100% 4 4 Page 16 of 45 Comments Corrective Measure 75% Target not achieved All Supply Chain findings to be resolved on Quarterly basis. 4 4 Target achieved None 4 4 Target achieved None SDBIP less than 90 days turn Around time appointment of the service provider Effective, efficient and complianc e with SCM legislation and Processes <90 days <90 days <90days Target achieved None BUDGET & TREASURY – PROJECTS Key Performance Area (KPA) Strategic Objective Programme Financial viability and financial management To expand and improve the revenue base of the municipality through the implementatio n of the revenue enhancement strategy Revenue Management Type Project Dates 2014/15 Start End Planned Actual Deviation Target Not Achieved/ Target Exceeded Corrective Measure SDBIP Implementation of Financial Management System Jul-14 Jun15 Merged system Order issued for Integration Target partially Achieved Training conducted in the third week of june, System intergration commencing after the year end processess. SDBIP 100% reduction of debt owing by farmers Jul-14 Jun15 Alignment of farmers with the valuation roll. Item presented to Council on the 29 May 2015 Target achieved none Page 17 of 45 5.3: CORPORATE SERVICES The Corporate Services Department is responsible for a total of 17 KPI’s and 2 Projects overall performance level for the IDP and SDBIP Scorecards. The statistics for the Department were as follows: Category Total KPIs Assessed Target Achieved % Partially Achieved IDP SDBIP SUBTOTAL 5 12 17 2 8 10 40% 66,7% 86% 1 1 2 PROJECTS TOTAL 2 19 1 11 50% 58% 0 2 % 20% 8,3% 7% 0% 11% Target Not Achieved 2 3 5 1 6 The detailed achievement of each KPI and Project by Department is highlighted per section: Administration HR Management ICT Transversal Projects Page 18 of 45 % 40% 24,9% 7% 50% 31% HR MANAGEMENT Key Performa nce Area (KPA) Municipal transformation and Institutional development Strategic Objective To render capacity building and training to staff, Councilors and community members To ensure that the workplace is representative of the demographics 2014/15 Programme Type KPA Indicators Baseline 13/14 New Annual Target Review and adoption Organisational Structure (annual) IDP Review and adoption of organisational structure (annual) IDP 7 training interventions for Councillors and officials as per targets of Workplace Skill Plan (WSP) 13 7 training interventions for Councillors and officials as per targets of Workplace Skill Plan (WSP) 3 training interventions for Councillors and officials as per targets of Workplace Skill Plan (WSP) IDP Employment Equity (EE) Report submitted to DoL; Review EE Policy and reviewed EE Plan 1 Employment Equity (EE) Report submitted to DoL; Review EE Policy and reviewed EE Plan Employment Equity (EE) Report submitted to DoL. HRM&D Employment Equity across occupational levels and categories Actual Page 19 of 45 Reviewal of job descriptions for all employees at an advance stage. Job evaluation training conducted Target achieved Comments Target Achieved. 90% is done and the remaining will be completed when signing is done with union representations. The schedule is done.. Target partially achieved Allocated budget not sufficient to address the interventions. Target Achieved. Corrective Action The matter to be escalated 2015/16 budget. Allocated budget not sufficient to address the interventions.The matter to be escalated 2015/16 budget. ICT Key Perform ance Area (KPA) Municipal transformati on and Institutional development Strategic Objective ICT Governanance 2014/15 Programme Type KPA Indicators SDBIP 4 ICT Steering Committee meetings held Establish and maintain a functional ICT Steering Committee Baseline 13/14 New Annual Target 4 ICT Steering Committee meetings held Actual Comments Corrective Action 0 meetings Target NOThere was a confusion as to who should sit on the Committee and lack of clear ToR.Target NOT Achieved The ToR have been completed and will be submitted for the Municipal Manager for approval and appointment of ICT Committee members ICT as a stragegic enabler Upgrading of the ICT Infrastructure SDBIP 100% expenditure on the allocated funds on ICT Upgrade New 100% expenditure on the allocated funds on ICT Upgrade 100% expenditure on the allocated funds on ICT Upgrade Target achieved None ICT Customer Support Services Establish and maintain a capacitated ICT Division SDBIP 100% ICT queries resolved within 48hrs New 1 100% ICT queries resolved within 48hrs 100% ICT queries resolved within 48hrs Get. Target achieved None Page 20 of 45 FLEET Key Perform ance Area (KPA) Municipal transformati on and Institutional development Strategic Objective 2014/15 Programme Type KPA Indicators Conduct Fleet Audit IDP Proper fleet management system Development of Fleet Policies and Procedures IDP 1 fleet policy and procedures reviewed/ developed Fleet Management Baseline 13/14 New New Annual Target Actual Proper fleet management system 0 1 fleet policy and procedures reviewed/ developed 0 Comments No funding to procure and instal the fleet management system. Target NOT Achieved No capacity and funds to develop the policies and procedure in the municipality.Tar get NOT Achieved. Corrective Action Provision will be made in the 2015/16 budget PWC is currently helping the municipality PROJECTS Key Perform ance Area (KPA) Municipal transformati on and institutional arrangement Strategic Objective To ensure compliance with the National Archives and Records Management Act To ensure that the workplace is representative of demographics 2014/15 Programme Institutional capacity and development Institutional capacity and development Type Start/ End Projects July 13 – June 14 SDBIP Implementation of File Plan SDBIP EE Report submitted to DOL;implementatio n EE Policy/ EE July 13 – June 14 Page 21 of 45 Annual Target Actual Comments Corrective Action Implementation of File Plan No implementation of File plan The process of is continuing of implementing the File Plan. Target NOT Achieved Target NOT achieved Action Plan developed to address compliance issues EE Report submitted to DOL;implementatio n EE Policy/ EE EE Report submitted to DOL;implementat ion EE Policy/ Target achieved None Plan Plan EE Plan LEGAL AND ADMINISTARTION Key Perform ance Area (KPA) Municipal transformati on and Institutional development Strategic Objective To develop policies and Bylaws to promote effective and efficient governance 2014/15 Programme Type KPA Indicators Baseline 13/14 Policies SDBIP 6 existing approved Council Policies reviewed and or updated and resubmitted to Council for approval (annual) 18 Policies SDBIP 1 Policies SDBIP 6 new Policies developed and submitted to Council for approval Maintain an updated Policy Register approved by Municipal Manager By –laws SDBIP Promulgation of approved 2 By-laws 4 By-Laws not promulgated 1 To render effective and efficient secretariat services to Council and Committees SDBIP 11 of Mayoral and 4 Council agendas and minutes approved New To provide legal SDBIP 100% of litigation New Page 22 of 45 Annual Target Actual Comments Corrective Action 6 existing approved Council Policies reviewed and or updated and resubmitted to Council for approval (annual) 6 new Policies developed and submitted to Council for approval Maintain an updated Policy Register approved by Municipal Manager Promulgation of approved 2 Bylaws 11 of Mayoral and 4 Council agendas and minutes approved 6 existing approved Council Policies reviewed and or updated and re-submitted to Council for approval (annual) Target exceeded None 6 new Policies developed and submitted to Council for approval Maintain an updated Policy Register approved by Municipal Manager 0 Promulgation of approved 2 Bylaws 11 of Mayoral and 4 Council agendas and minutes Target achieved None Target achieved None Target no Achieved due to Lack of funding Target achieved Provision will be made in the 2015/16 100% of Partially achieved Cases are Strive to seed None administration and support cases in favour of the municipality SDBIP SDBIP SDBIP 100% of labour dispute cases in favour of the municipality Review and implementation of Delegation register New Create and maintain an updated contracts register 18 New Page 23 of 45 litigation cases in favour of the municipality 100% of labour dispute cases in favour of the municipality Review and implementation of Delegation register Create and maintain an updated contracts register ongoing uppped 100% of labour dispute cases in favour of the municipality None reviewal None None Target not achieved.Lack funding Provision will be made in the 2015/16 Created and maintained an updated contracts register Target achieved None 5.4 COMMUNITY SERVICES & PUBLIC SAFETY The Community Services Department is responsible for a total of 7 KPI’s and 3 Projects which contribute to the overall performance level for the IDP and SDBIP Scorecards. The statistics for the Department were as follows: Category Total KPIs Assessed Target Achieved IDP SDBIP SUB-TOTAL 0 7 7 0 2 2 PROJECTS TOTAL 3 10 2 4 % 0% 29% 29% 66% 40% Partially Achieved % Target Not Achieved 0 0 0 0% 0% 0% 0 5 5 0% 71% 71% 0 0% 0% 1 6 33.3% 60% 0 The detailed achievement of each KPI and Project by Departmental is highlighted per section: Community Services and Public Safety Refuse Removal and Environment Fire Fighting and Disaster Management Projects Page 24 of 45 % DIVISION – COMMUNITY SERVICES AND PUBLIC SAFETY Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective Programme To support the “fight against crime” campaign in partnership with SAPS and other key stakeholders Type SDBIP Safety and Security SDBIP To ensure the safety of all road users SDBIP KPA Indicators 20% installation of street name signage for Grootvlei and Nthorwane 100% installation of road signage to identified needs 100% Municipal vehicles drivers who passed the proficiency test Baseline 2013/14 Annual Target 40% Actual Comments Target NOT Achieved financial constraints EPWP incentives to be utilized for installation of street name signages in the 2015/16 financial year Target NOT Achieved Insufficient equipment and personnel Financial constraints and shortage of staff which will be address through EPWP Funding and personnel. Target NOT Achieved DLM had capacity constraints to conduct the training. To source the assistance of the Province to facilitate the training 20% 0 90% 100% 0 0 Page 25 of 45 100 0T0Not 00Achieved Corrective Action DIVISION - REFUSE REMOVAL / ENVIRONMENT Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective promote a clean and healthy environment by conducting intensive awareness and cleaning campaigns to discourage illegal dumping Programme Type SDBIP Environmental SDBIP Management SDBIP KPA Indicators 200 EPWP job opportunities created through the Keep Dipaleseng Clean & Youth in Waste 4 cleaning campaigns on job opportunities 7 park upgraded and/or developed in Wards 2 Baseline 2013/14 200 Annual Target 200 Actual Comments This is due to withdrawal(resignation) of beneficiaries,death not 0 Target Achieved 4 4 4 Target achieved Target Achieved 7 7 7 Target achieved Page 26 of 45 Corrective Action Replacement/Recruitment of new beneficiaries to fill the posts using EPWP incentives. DIVISION - FIREFIGHTING & DISASTER MANAGEMENT Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective To develop and implement a comprehensive Disaster Management program and system that will be able to effectively respond to possible emergencies and disasters Programme Type KPA Indicators Baseline 2013/14 Annual Target Comments Target not Achieved Cash flow constraints 100% of Emergency Incidents reported and attended (annual) Disaster SDBIP Management Actual 0% 90% Page 27 of 45 100% Corrective Actions Increase resources and personnel to reach 100% response in the 2015/16 financial year. COMMUNITY SERVICES AND PUBLIC SAFETY - PROJECTS Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective Programme Type Project Target To develop sustainable infrastructure provision/development and use of natural resources that will ensure the protection of ecological integrity and protection of biodiversity. To develop and implement a comprehensive Disaster Management program and system that will be able to effectively respond to possible emergencies and disasters development of the Intergrated Waste Management Plan (IWMP) Waste Management approval of the draft IWMP by Council Disaster Management IDP Comments Target Achieved. IWMP approved The IWMP was approved by council Corrective Action IWMP tabled was tabled before Council in the 2014/15 and was approved Target Achieved IDP SDBIP Actual Development of Disaster Management strategy by DLM in collaboration with GSDM Disaster Management strategy (plan) approved by Council Establishment of a fully functional 24 hour operational District Disaster Management Centre (DDMC) DDMC fully functional on a 24 hour operational basis Page 28 of 45 Plan in place Non 24hr functional operational basis Target Achieved Approved by Council Target not Achieved. DDMC (fire and rescue) not fully functional on a 24 hour basis. More resources to be pump in as well as personnel for the centre to be functional 5.5: PLANING AND ECONOMIC DEVELOPMENT The Planning and Economic Development Department is responsible for a total of 16 KPI’s and 5 Projects which contribute to the overall performance level for the IDP and SDBIP Scorecards. The statistics for the Department were as follows: Category Total KPIs Assessed Target Achieved % Partially Achieved IDP 9 0 0% 8 88,9% 1 11,1% SDBIP SUB-TOTAL 4 13 4 4 100% 31% 0 8 0% 62% 0 1 0% 7% PROJECTS TOTAL 5 18 2 6 40% 33,3% 3 11 60% 61,1% 0 1 0% 5,6% % Target Not Achieved The detailed achievement of each KPI and Project by Department is highlighted per section: Local Economic Development Town Planning Human settlement Projects Page 29 of 45 % DIVISION: LOCAL ECONOMIC DEVELOMENT Key Performanc e Area (KPA) Local Economic Development 2014/15 Strategic Objective To enhance Local Economic Development through promotion and development of SMMEs Programme Facilitate and coordinate economic related workshops with other departments (e.g DEDET) to empower local SMME’s Strengthen partnership with local businesses and parastatals through Job LEDF. Creation facilitate Creation of job opportunities and promotion of poverty alleviation strategies to ensure sustainable livelihoods Type KPA Indicators 4 SMME's refresher skills IDP development programmes / workshops conducted Baseline 2013/14 Annual Target 2 Corrective Action Target partially achieved due reduction in budget by funders. facilitate and coordinate various workshops with various stakeholders to empower SMMEs Target partially achieved Ensure Consistent quarterly sitting of the forum Target Exceeded Continued implementation of existing LED programmes, collate and update all data pertaining the number of jobs created 2 2 0 4 2 150 job opportunities created SD BIP Comments 2 4 4 monthly LED Forum meetings held IDP Actual 367 Page 30 of 45 150 1693 DIVISION – DEVELOPMENT CONTROL Key Performan ce Area (KPA) Spatiale Rationale Strategic Objective Programme Type KPA Indicators 2014/15 Baseline 2013/14 Annual Target To monitor and regulate building activities To promote orderly and Sustainable development Spatial SDBIP Planning and implement ation %Percentage of new building plans received for consideration within (30) days 100% 100% Comments Target achieved 100% 100% SDBIP Percentage of approved building plans Actual 100% Urban and Regional Planning Page 31 of 45 100% Corrective Action Any no of applications considered as and when received Target achieved Any number of applications considered as and when received DIVISION - TOWN PLANNING Key Performan ce Area (KPA) Spatiale Rationale Spatiale Rationale Strategic Objective To promote orderly and Sustainable development) To monitor and regulate building activities Programme Type Spatial SDBIP Planning and implement ation " KPA Indicators %of land development applications received (rezonings, subdivisions and consolidation " % of land development applications SDBIP evaluated and processed (rezonings, subdivisions and consolidation) " Baseline 2013/14 2014/15 Annual Target Actual 100% 100% Comments Target achieved 100% Corrective Action Any no of applications considered as and when received 100% Target achieved 100% 100% Urban and Regional Planning Page 32 of 45 Any no of applications considered as and when received DIVISION – HOUSING Key Performanc e Area (KPA) Basic Service Delivery and Infrastructur e Investment Strategic Objective Type KPA Indicators Annual Target Programme Coordinate and facilitate access to various housing typologies with access to basic services 2014/15 Baseline 2013/14 Actual 90 informal houses upgraded to RDP in Ward 1,2& 4 Integrated Human Settlements IDP IDP IDP IDP Corrective Actions Target partially achieve due Ensure constant sitting to slow performance by of Steering committee to contractors. monitor implementation 90 52 170 People;s Housing Process (PHP) housing units built in Ward 1,2,3,5 & 6 10 RDP housing units built for veterans in Ward 1,2, 3, 4, 5 & 6 205 RDP/PHP houses constructed Ward 1,2 and 4 Comments New 70 47 Target partially achieved due to slow performance by contractors. Ensure constant sitting of Steering committee to monitor implementation Target not achieved ( not implemented due to nonavailability of military veterans within the municipality) A correspondence forwarded to DHS requesting redirection of the units to prioritised beneficiaries (disabled,contractor elderlies & Another CHH) appointed to finalise 205 New 10 0 500 205 93 Page 33 of 45 47 Target partially achieved due to slow performance by contractors. PLANNING & DEVELOPMENT – PROJECTS Key Performance Area (KPA) Basic service delivery and infrastructure investment 2014/15 Strategic Objective Co-ordinate and facilitate access to various housing typologies. with access to basic services and security of tenure Programme Human settlements Type SDBIP SDBIP Land Availability/ac quisition IDP IDP Project Facilitate Registration of Title Deeds for subsidy beneficiaries in Wards 1,2 ,4,5 & 6 Review Draft Housing / Human Settlement Chapter Procure and develop portion of the farm 557IR Balfour (ptns 5 & 28 of ptn 20) Land acquisition for the establishment of a cemetery in Grootvlei Target Completion & registration of deeds and handover to Reviewe beneficiarie d s. Housing / Human Settlem ent Chapter Land acquired Land acquired Actual First phase of Deeds registered (RDP Beneficiaries) Partially achieved Partially achieved In-house review Target Partially and Draft Achieved available Corrective Action DHS to release title deeds for distribution to rightful owners. Draft to be tabled before council at the 1st quarter of 2015/16 lly achieved . Target Achieved Land fully paid for and acquired, transfers done Target land Achieved fully paid for (land acquired), and registration under DLM finalised Target Achieved Page 34 of 45 Comments Target Achieved Township establishment budgeted for in 2015/16 FY. Extension of space for cemeteries IDP Acquisition of Portion 29 of the Farm Doornhoek 557IR (Sizanani Land acquired Page 35 of 45 Target partially a collaborative achieved meeting with Office of the Presidency, DHS and DPW, an MOU partially signed (DPW & DLM) for donation of land in facilitation for a swap deal with Siznani CPA Target partially achieved further engagement with relevant stakeholders in facilitation of land donation and a swap deal with the CPA 5.6: INFRASTRUCTURE AND TECHNICAL SERVICES The Infrastructure and Technical Department is responsible for a total of 19 KPI’s and 4 Projects which contribute to the overall performance level for the IDP and SDBIP Scorecards. The statistics for the Department were as follows: Category Total KPIs Assessed Target Achieved % Partially Achieved % Target Not Achieved % IDP SDBIP SUB TOTAL 9 10 19 4 4 8 44% 40% 42% 0 0 0 0% 0% 0% 5 6 11 66% 60% 58% PROJECTS TOTAL 4 23 1 9 25% 39% 0 0 0% 0% 3 14 75% 61% The detailed achievement of each KPI and Project by Department is highlighted per section: Water Sanitation Electricity Project Management Unit Projects Page 36 of 45 DIVISION - WATER Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective Programm e To ensure improved access to potable water by providing adequate bulk water infrastructure and address backlogs Type IDP Baseline 2013/14 KPA Indicators water reticulation and connection of 134 households in Siyathemba x6 Annual Target Target Achieved 10996 40.7% 134 60% Target Achieved 40% Target NOT Achieved Water SDBIP IDP 30% of unaccounted for water (annual) reduced % water supply disruptions attended to within 48 hrs prescribed timeframe Comments Corrective Action N/A 134 Increase in Blue drop requirements SDBIP Actual 45% >90% Page 37 of 45 >30% loss 100% 40% loss 100% Target NOT Increase resource Achieved. Lack of requirements as per Blue resources in the Drop regulations Technical department e.g. non classified process controller, no risk plan etc Target NOT Achieved Ageing infrastructure and non- availability of bulk meters at the reservoir. Replacement of leaking water meters,old valves and bulk metering and implementation of the Water Demand and conversation study done by GLS Consultants. Annual target achieved as scheduled N/A DIVISION – SANITATION Key Performance Area (KPA) 2014/15 Strategic Objective 10km of 10km of regravelling in regravelling in Dipaleseng and Dipaleseng and 0.50km2 of pot 0.50km2 of pot hole patching hole patching Programme 10km of regravelling in Dipaleseng and 0.50km2 of pot hole patching Type KPA Indicators 10km of 10km of regravell regravelling in ing in Dipaleseng and Dipalese 0.50km2 of pot ng and hole patching 0.50km2 of pot hole patching IDP Upgrade/Expansio n of the Grootvlei Waste Water Treatment Works,Phase 1 Baseline 2013/14 Annual Target Actual Comments 10km of 10km of 10km of 10km of regravelling in regravellin regravelling in regravelling Dipaleseng and 0.50km2 g in Dipaleseng in of pot hole patching Dipaleseng and 0.50km2 Dipaleseng and of pot hole and 0.50km2 of patching 0.50km2 of pot hole pot hole patching patching 3 WWTW Completed 0 project Target NOT Achieved. Waste water completed Project delayed due to treatment plant rain and steel strike that happened in between Oct and Dec 2015. IDP Upgrade of the Balfour Waste Water Treatment Works. SDBIP 60% of Green Drop 40.70% Status (annually) 3WWTW Corrective action 10km of regravelling in Dipaleseng and 0.50km2 of pot hole patching Extension of time granted and the project to be completed in the 2015/16 financial year. Increase 50% capacity to progress on allow for future site development Target NOT Achieved .Poor performance of the appointed contractor resulted in 50% completion of the project Engagement of DWS/COGTA/DLM/RAND WATER and the appointed contractor Increase in Green drop requirements Target NOT Achieved.Lack of resources in the Technical department e.g. non classified process controller, no risk plan etc. Increase resource requirements as per Blue Drop regulations Page 38 of 45 30% SDBIP % blockages attended to within 24hrs prescribed timeframes None >90% 100% Page 39 of 45 100% Target Achieved. Annual target achieved as scheduled DIVISION - ELECTRICITY Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective Programme To provide bulk electricity supply, network distribution and maintenance. Infrastructure Provision and Maintenance Type IDP SDBIP Electricity Services KPI Electrification of 145 households in Siyathemba (134) and 11 in Grootvlei. Reduce 100% outages within 24hrs % unaccounted for electricity (annual) Baseline 2013/14 Annual Target 0 10521 167 >90% 100% 100% <25% loss No. of Pre-paid meters installed IDP Target Not Achieved. Progress on site at 25% due to the late appointment of the service provider. 450 This is due to budget constraints for the installation 100% expenditure Page 40 of 45 Installation of smart meters, curbing of illegal connection and ,proper billing to reside Smart metering (pre-paid)will be implemented internally new financial year All allocated electricity budget w exhausted. 100% 100% expenditure Project rolled over to 2015/16 financial year. due to the late appointment of the service provider. 40% loss 169 2500 100% Expenditure on the Maintenance of highmast lights and street lights,substation and LV lines etc Corrective Actions TargetaAgeing <40% loss SDBIP SDBIP Actual Target Achieved DIVISION – PROJECT MANAGEMENT Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective Programme Planning, coordination, implementation and monitoring of infrastructure Projects. Contracts Management. Type SDBIP SDBIP Project Management KPA Indicators % of projects started on schedule (excl GSDM) % of projects completed to schedule (excl GSDM) annual SDBIP % of projects completed within budget (excl GSDM) annual SDBIP # of EPWP (FTE's) job opportunities created through Capital projects (annual) Baseline 2013/14 Annual Target Actual Comments Target achieved. 100% 100% 100% 100% 100% Target Achieved Only 50% of the Ta projects completed. 50%NOT Achieve d Target not achieved as 50 a result of a lack of 50%ed skilled personnel. 100% 60% Target Achieved. 50 Page 41 of 45 100 100 Corrective Action Status quo to be maintained. Projects to be rolled over to 2015/16 financial year. Capacity building to be implemented in the new financial year N/A DIVISION – PROJECT MANAGEMENT Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective Planning, coordination, implementation and monitoring of infrastructure Projects. Contracts Management. Programme Type Project SDBIP Management KPA Indicators 100% Municipal Improvement Grant (MIG) utilisation annual Baseline 2013/14 Annual Target Actual 33% 50% 100% Page 42 of 45 Comments Target NOT Achieved due to delays in the supply chain management processes Corrective Action Supply Chain Management processes to be expedited INFRASTRUCTURE SERVICES - PROJECTS Key Performance Area (KPA) Provision of quality basic services and infrastructure 2014/15 Strategic Objective Management and Maintenance of Water Supply system in the Municipality. Programme Type Project Planned Water / Sanitation Services Provision To ensure Waste effective and management efficient waste management services and systems by reviewing and extending the refuse removal programme to all areas. Increasing Electricity services by all electricity Services households in distribution, Provision formalised accessibility areas and improve management of network IDP Implementation of masterplan on water,sanitation,roads and stormwater,electricity masterplan Conduct workshop with relevant stakeholders Establishment of landfill site in Balfour/Siyathemba Completion of the project Completion of Infrastructure related Electricity Master Plan (EMP) which will inform the implementation of infrastructural programmes. Submit EMP to Council for approval Actual Workshop NOT conducted Page 43 of 45 Target NOT achieved due to the non-availability of stakeholders. Corrective Action Workshop to be conducted in the 15/16 financial year Target NOT Achieved Project rolled over to 80% COMPLETION SDBIP IDP Comments Progress at 95% on site due to contractual issues. 2015/16 capital programme None EMP submitted to Council for adoption and approval. Target Achieved To ensure sufficient roads and storm water networks to all communities in Dipaleseng by improving Roads and Storm water Provision SDBIP Construction of roads in Completed Siyathemba (mofokeng road str) Page 44 of 45 Contractors appointment by June2015. Progress at 25% on site due to late appointment of the contractor. Project rolled over to 2015/16 capital programme INFRASTRUCTURE SERVICES – ROADS AND STORMWATER Key Performance Area (KPA) 2014/15 Strategic Objective To ensure sufficient roads and storm water networks to all communities in Dipaleseng by improving accessibility of roads and improvement in road safety and storm water drainages Programme Type Project Planned Roads and Storm water Provision IDP 10km of regravelling in Dipaleseng and 0.50km2 of pot hole patching 10km of regravelling in Dipaleseng and 0.50km2 of pot hole patching Page 45 of 45 Actual 10km of regravelli ng in Dipalesen g and 0.30km2 of pot hole patching Comments Target NOT Achieved This is due to cash flow constraints Corrective Action Solicit assistance from GSDM,Department of Roads and Transport in the Province in the 2015/16 financial year.