University of Alaska Anchorage FY14 Operating and Capital Budget Requests

advertisement

University of Alaska

Anchorage

FY14 Operating and Capital Budget

Requests

7 August 2012

Dynamic Time in UAA’s History

 New Academic Leadership

 Interim Provost

 Interim Deans in four colleges

 New College of Arts and Sciences Dean

 New entrepreneurial and innovation research focus

 Now accredited to award doctoral degrees

Much to be proud of….

20,699 Students Enrolled for Credit (Fall 11)

 .6% increase over Fall 10

Student Achievement

 2,307 Total Awards (AY11-12)

7 Student Fulbright Scholars & 5 Truman Scholars in 8 years.

Debate Team ranked 9th in World, 2nd in U.S. (behind Yale)

Seawolf Student-Athletes captured 7 Player of Year awards in GNAC (one in every sport)

Athletic Teams ranked No. 16 in Directors’ Cup Standings

(Top 6% of all Div II schools)

Much to be proud of….

 Launched INNOVATE Program to support new research

 Computer Science Faculty (Mock and

Hoanca) Patent Award (First since 1998)

 Establishment of Center for Education Policy

Research

Much to be proud of….

 VetSuccess on Campus Program Selection

 1 of 11 universities in US

 Office of Military & Veteran Student Resources opening in August

 Recognition as Military Friendly School

 (3 rd Consecutive Year)

Much to be proud of….

 Exceeded our $8M goal for private giving

 Atwood Foundation increased endowment for

Atwood Chair of Journalism

 BP Exploration (Alaska) donated $1M to establish BP Asset Integrity and Corrosion Lab

 Eyak donation to support hiring of Rural

Student Transition Coordinator

Much to be proud of….

 Anniversary Celebrations

 ISER 50 th

 Engineering in Anchorage 50 th

 School of Nursing 40 th

 WWAMI 40 th

 Infrastructure growth

 New Health Science Bldg open for business

 Arena starting to take shape

 $58M of Engineering Bldg funded —Design and Garage construction

Key UAA Strategic Principles

 Assure Alignment and Consistency

UA System Priorities and SDI

MAU and Campus Priorities and Requirements

 Meet State and Community Needs

 Reinforce MAU Strengths with Emphasis on the UAA Community of Students, Faculty, and Staff

 Act as Good Stewards of Financial and

Infrastructure Assets

 Take Sustainability Seriously

Outlook

 Major Challenges to Address:

 Increase Student Achievement (Retention, Progress,

Graduation, Distinction).

 Sustain Key Programs, High Demand Jobs and

Workforce Development

 Grow the Research Mission with emphasis on applied research, innovation, and economic impact

Address Highest Priority Infrastructure Requirements

Identify Costs of Academic Programs and their Support –

To make best Strategic Reallocation Decisions

Initiatives Underway

 Branding

 Space Utilization Study

 Cost of Education Model Development

 Business Process Re-engineering

 Financial reporting

 Academic Process Re-engineering

 Updated Program Review

 New Promotion and Tenure Guidelines

University of Alaska Anchorage

FY14 Operating Budget Request

Highest Priority Program Increments

INITIATIVES TO IMPROVE PROGRAM COMPLETION RATES

$746.8 GF

MAU

RANKING

TITLE GF NGF

1 Timely Degree Completion through

Mandatory Advising and Orientation

455.0

2 Timely Degree Completion through

Community Campus Student Success

Initiatives

291.8

Highest Priority Program Increments

HEALTH $1,309.4 GF; $135 NGF

TITLE GF MAU

RANKING

3

4

6

9

10

11

Area Health Education Centers (AHEC)

Support 1

Psych PhD/CBHRS Succession

Interdisciplinary Education in Children’s

Mental Health

OHPD Operating Costs 1

Health Workforce Research Support

Dietetics and Nutrition Program Expansion 1/2

NGF

652.9

75.0

200.0

40.0

50.0

175.5

103.5

127.5

20.0

1

Requested in previous years

2

Replaces TVEP funds

Highest Priority Program Increments

WORKFORCE DEVELOPMENT/MINING –

$1,073.3 GF; $190 NGF

TITLE GF NGF MAU

RANKING

5

7

8

Center for Economic Development

Mining/Industry Workforce Needs

AK Small Business Development Center 1

400.0

200.0

50.0

20.0

418.9

100.0

12 Mat Su Computer Systems Tech Faculty 1/2 54.4

20.0

1

Requested in previous years

2

Replaces TVEP funds

Highest Priority Fixed Cost Increments

 Campus Safety Fixed Costs

 330.0 GF

 Safety/security personnel for main campus and community campuses (Kenai/Mat Su)

 Valley Center for Arts and Learning Facility Coordinator

 70.2 GF

 1 FTE for new VCAL facility to coordinate events

 Aviation/Eagle River Campus Fixed Cost

 32.9 GF

 Increase in cost per square foot for leased facilities

Totals

Category

TOTAL PROGRAM INCREMENTS

TOTAL FIXED COST INCREMENTS

TOTAL INCREMENTS

GF

$3,129.5

$433.1

$3,562.6

NGF

$325.0

$325.0

University of Alaska

Anchorage

FY14 Capital Budget Requests

7 August 2012

FY14--UAA Capital Budget Request

Deferred Maintenance Renewal New Construction

Planning and Design Land Acquisition

Academic

Equipment

FY14--UAA Capital Budget Request

Main Campus R&R/Deferred Maintenance--$ 259M

Anchorage Campus —Top 10

(Allocated)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

BMH Building Renewal ($15.4M)

Campus Building Envelope/Roofs

$ 5.97M

$ 1.00M

Mech/Elec/HVAC Systems Upgrades $ 0.50M

Campus Roads/Curbs/SW $ 0.20M

EM1 and EM2 Mechanical ($5.58M) $ 1.34M

MAC Housing Renewal ($12.1M)

C,O,LH Lighting Upgrades

$ 3.00M

$ 0.10M

Building Automation

Campus Way Finding

$ 0.10M

$ 0.10M

Emergency Generator Replacement $ 0.10M

Anchorage Campus Share of $37.5M approx $9M

FY14--UAA Capital Budget Request

Community Campus R&R/Deferred Maintenance -$40M

Community Campuses —Top 5

1.

KPC Goodrich Ward Backfill ($3.5M) $1.48M

2.

3.

4.

5.

Kodiak Campus Renewal ($4.4M)

PWSCC Campus Renewal ($5.9)

$3.20M

$4.04M

Mat-Su Renovation FSM 128/SNOD 120 $0.25M

Kodiak Roof Replacement $0.50M

UAA Community Campus Share of $37.5M approx $1.84M

FY14--UAA Capital Budget Request

UAA Planning and Design Funds

Anchorage

1.

2.

3.

4.

Health Sciences Ph ll Bldg & Parking/Bridge $ 11.0M

Campus Master Plan & MAU Facilities Assessment $ 1.5M

Library North Entrance & Student Resource Center $ 0.5M

Student Housing $ 3.5M

Community Campus

1.

2.

3.

PWSCC Lecture Hall /Classroom Addition

MSC Loop Road and parking

MSC Science Facility Addition

$ 0.30M

$ 0.20M

$ 0.30M

FY14--UAA New Construction

Anchorage Campus - 3 Projects; 1 RA

Engineering PH I - Instructional Lab Bldg (TPC $123.2M)

Includes New Building (75K GSF)-- $78.2M

 Structured parking (500 spaces)--$27.3M

 Existing Bldg Renewal --$17.7M

$60.6M

Campus Road Projects (Mallard, UL Drive, Housing, UAA Dr) $ 8.0M

WFSC Renovation and Student Rec Center Addition

 Renewal--$26.7M

 New Student Rec Addition —$22.7M RA

Child Care Center--$5M

Alaska Native Art Studio —(Receipt Authority)

Community Campus – 1 Project

Kodiak Vo-tech and Warehouse

PWSCC Lecture Hall Classroom Addition

Mat-Su Loop Campus Parking and Loop Road

$54.4M

$ 3.5M

$ 24.3M

$ 3.0M

$ 3.5 M

FY14--UAA Land, Property and

Facilities Acquisition

 Swing Space--Office and Classroom Proximate to

Anchorage Campus

Adjacent Land

Warehouse and Support Facility

Industrial Training Center

Homer Adjacent Property

 PWSCC —Industrial Classroom Building

FY14--UAA Academic Equipment--$10M

Top Five

Anchorage Campus

UAA Data Center Disaster Recovery

UAA ADC Blade System Lifecycle Replacement

Science\ Engineering Equipment Replacement

Arts —Anchorage Theater Curtains and Seating

 Campus Lab Support for High Demand Jobs

$600K

$250K

$1.9M

$1.0M

$2.2M

Wrap-Up

 UAA is an evolving institution

 Meeting regional needs from developmental education to graduate degrees

Statewide lead in Health Care education

Increasing output of applied research and economic development

Building engagement and partnerships in our communities

 Continuing investment is required to

Maintain strengths

Reinforce successes

Address challenges

Download