Metal Windows

advertisement
2ND FLOOR SOLARIUM
WINDOWS TO BE
REPLACED (EAST
ELEVATION)
EAST ELEVATION
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT
REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS).
MAJOR MAINTENANCE FY 15
WESLEYAN
UNIVERSITY
Construction Services
170 Long Lane
Middletown, CT 06457
327 HIGH STREET
DAVISON HEALTH CENTER
SOLARIUM WINDOW REPLACEMENT PROJECT
SECTION 00020 - EXISTING CONDITION PHOTOS
DATE: 01/20/14
PHOTO. NO.
REVISIONS
P-7-1
2ND FLOOR SOLARIUM
WINDOWS TO BE
REPLACED (SOUTH
ELEVATION)
SOUTH ELEVATION
WESLEYAN
UNIVERSITY
327 HIGH STREET
Construction Services
170 Long Lane
Middletown, CT 06457
DAVISON HEALTH CENTER
SOLARIUM WINDOW REPLACEMENT PROJECT
SECTION 00020 - EXISTING CONDITION PHOTOS
DATE: 01/20/14
PHOTO. NO.
REVISIONS
P-7-2
2ND FLOOR SOLARIUM
WINDOWS TO BE
REPLACED (WEST
ELEVATION)
MAJOR MAINTENANCE FY 15
WESLEYAN
UNIVERSITY
WEST ELEVATION
327 HIGH STREET
Construction Services
170 Long Lane
Middletown, CT 06457
DAVISON HEALTH CENTER
SOLARIUM WINDOW REPLACEMENT PROJECT
SECTION 00020 - EXISTING CONDITION PHOTOS
DATE: 01/20/14
PHOTO. NO.
REVISIONS
P-7-3
INTERIOR – 2ND FLOOR SOLARIUM
WESLEYAN
UNIVERSITY
327 HIGH STREET
Construction Services
170 Long Lane
Middletown, CT 06457
DAVISON HEALTH CENTER
SOLARIUM WINDOW REPLACEMENT PROJECT
SECTION 00020 - EXISTING CONDITION PHOTOS
DATE: 01/20/14
PHOTO. NO.
REVISIONS
P-7-4
SCOPE OF WORK:
NOTE: THE INTERIOR SOLARIUM SPACE IS FULLY FURNISHED. CONTRACTOR IS RESPONSIBLE TO MOVE, COVER, PROTECT AND CLEAN ALL FURNISHINGS.
HAZARDOUS MATERIAL COORDINATION
1.
ALL CONTRACTOR PERSONNEL WORKING ON THE PROJECT SHALL BE CERTIFIED BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) FOR LEAD BASED PAINT
ACTIVITIES.
2.
ALL CONTRACTOR PERSONNEL SHALL PERFORM CONSTRUCTION ACTIVITIES AND WORK IN ACCORDANCE WITH ALL CITY, STATE AND FEDERAL BUILDING/FIRE CODES AND
REGULATIONS.
WINDOW REPLACEMENT
3.
REMOVE ALL SOLARIUM WINDOWS AS IDENTIFIED ON THE PHOTO SHEETS. RECYCLE ALL METAL COMPONENTS AND DELIVER TO JUKONSKI RECYCLING ON BUTTERNUT
STREET IN MIDDLETOWN. HOURS OF OPERATION: 1:00 PM – 6:00 PM. RECYLCING CREDIT TO BE PLACED ON OWNER'S ACCOUNT - ATTENTION: ROSEANN.
4.
NEW WINDOWS SHALL BE MARVIN CLAD ULTIMATE REPLACEMENT CASEMENT SYSTEM, WAUSAU WINDOW AND WALL SYSTEMS INVENT METAL CASEMENT WINDOWS OR
APPROVED EQUAL. SASH CONFIGURATION TO BE TOP CUT 2W1H - BOTTOM CUT 2W4H. SIMULATED RAIL TO BE INSTALLED BETWEEN TOP CUT AND BOTTOM CUT.
5.
PROVIDE WINDOW SCHEDULE AND SHOP DRAWING ELEVATIONS TO OWNER FOR APPROVAL PRIOR TO ORDERING.
6.
REPLACE INTERIOR TRIM AS REQUIRED; PAINT TO MATCH EXISTING.
7.
FILL SASH POCKETS WITH NON-FIBERGLASS BATT INSULATION, APPLY SEALANT TO HEAD AND JAMBS OF EXISTING SASH STOPS AND THEN INSTALL NEW WINDOW(S). FILL
VOIDS BETWEEN OLD AND NEW WITH GREAT STUFF WINDOW & DOOR INSULATING FOAM SEALANT, TRIM INTERIOR WITH NEW TRIM PIECES AS REQUIRED AND SEAL PERIMETER
INTERIOR WITH CLEAR CAULK TO ELIMINATE THE POTENTIAL FOR ANY AIR INFILTRATION. CAULK EXTERIOR TO MATCH WINDOW TRIM PAINT COLOR.
8.
PROVIDE STEEL REINFORCEMENTS, PRE-ASSEMBLED EXTRUDED ALUMINUM PANNING-BACKSEAL JOINERY PRIOR TO INSTALLATION, RECEPTORS AS REQUIRED, CONCEALED
HINGES, LIMITED OPENING DEVICE ON OPERABLE SASHES, OPERATING HARDWARE, LOCKS, WEATHERSTRIPPING, INSECT SCREENS .
9.
MATCH INTERIOR TRIM/FRAME/STOP CONFIGURATION/COLOR/FINISH. TOUCH-UP PAINT ON INTERIOR WINDOW TRIM, FRAME, STOPS AND APRON. PRODUCT TO BE SHERWIN
WILLIAMS PROMAR 200; SEMI-GLOSS - MATCH EXISTING.
9.
PROVIDE NEW WINDOW TREATMENT HARDWARE AS REQUIRED FOR PROPER REINSTALLATION.
11.
CAULK EXTERIOR OF ALL WINDOWS TO MATCH WINDOW TRIM PAINT COLOR.
INTERIOR – 2ND FLOOR SOLARIUM
WESLEYAN
UNIVERSITY
327 HIGH STREET
Construction Services
170 Long Lane
Middletown, CT 06457
DAVISON HEALTH CENTER
SOLARIUM WINDOW REPLACEMENT PROJECT
SECTION 00020 - EXISTING CONDITION PHOTOS
DATE: 01/20/14
PHOTO. NO.
REVISIONS
P-7-5
Download